X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1096060604000

Well Details

Well ID: 1096060604000
Loading map...
Location: 00/04-06-109-06W6/0
Location Alias: 00/04-06-09-06 W6M
Location Alias 2: 00/04-06-109-06 W6/00
Country: Canada
Province: Alberta
Township: 109
Meridian: 6
Range: 06
Section: 06
County/Municipality: Mackenzie County
Well Name: MOBIL ET AL RAIN 4-6-109-6
Operator Name: ExxonMobil Canada Ltd.
License Number: 0032458
License Date: 1967-07-11
License Status: RecCertified
Spud Date: 1967-07-12
Final Drill Date: 1967-08-07
Well Total Depth: 1994.90 m
Surface Hole Latitude: 58.429437
Surface Hole Longitude: -119.001837

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1967-07-11 Obtained License
1967-08-07 Finished Drilling
1967-08-07 Well Mode changed to Drilled and Cased
1967-08-08 Drill Stem Test Performed
1967-08-10 Production Casing Operation Performed
1967-09-02 Perforation Treatment Performed - Abrasa-Jet Perforation
1967-09-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-09-05 Perforation Treatment Performed - Jet Perforation
1967-09-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-09-19 Well Began Production
1967-09-19 Well Fluid changed to Crude Oil
1967-09-19 Well Mode changed to Flowing
1970-03-21 Perforation Treatment Performed - Jet Perforation
1970-03-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-10-19 Well Fluid changed to Crude Oil
1970-10-19 Well Mode changed to Suspended
1983-06-02 Well Fluid changed to Crude Oil
1983-06-02 Well Mode changed to Pumping
1984-06-24 Well Log Performed
1986-11-01 Well Fluid changed to Crude Oil
1986-11-01 Well Mode changed to Suspended
1990-03-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-03-22 Plug Back Performed
1990-03-22 Well Fluid changed to Crude Oil
1990-03-22 Well Mode changed to Abandoned
1990-03-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-03-23 Perforation Treatment Performed - Cement Plug
1990-03-23 Plug Back Performed
1990-03-26 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1967-09-02 Hydra Jet Perforation 1864.80 1864.80 0
1967-09-02 Acid Treatment 1864.80 1864.80 0
1967-09-05 Perforation 1865.40 1867.50 10
1967-09-06 Acid Treatment 1865.40 1867.50 0
1970-03-21 Perforation 1864.80 1870.90 3
1970-03-22 Acid Treatment 1864.80 1870.90 0
1990-03-22 Packing Device Capped w/Cement 1816.00 1851.00 0
1990-03-23 Cement Plug 800.00 845.00 0
1990-03-23 Packing Device Capped w/Cement 750.00 750.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1983 4295 0.0 0.0 0.0
1984 6530 0.0 0.0 0.0
1985 4206 0.0 0.0 0.0

For data sources see[5]

References