X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1096052509000

Well Details

Well ID: 1096052509000
Loading map...
Location: 00/09-25-109-05W6/0
Location Alias: 00/09-25-09-05 W6M
Location Alias 2: 00/09-25-109-05 W6/00
Country: Canada
Province: Alberta
Township: 109
Meridian: 6
Range: 05
Section: 25
County/Municipality: Mackenzie County
Well Name: CABOT ENERGY RAINBOW 9-25-109-5
Operator Name: Cabot Energy Inc.
License Number: 0123440
License Date: 1986-07-10
License Status: Abandoned
Spud Date: 1986-08-04
Final Drill Date: 1986-08-17
Well Total Depth: 1629.00 m
Surface Hole Latitude: 58.496203
Surface Hole Longitude: -118.670830

For data sources see[1][2]

Well History

Date Event
1986-07-10 Obtained License
1986-08-05 Surface Casing Operation Performed
1986-08-17 Finished Drilling
1986-08-17 Well Log Performed
1986-08-18 Well Log Performed
1986-08-19 Drill Stem Test Performed
1986-08-21 Production Casing Operation Performed
1986-08-21 Rig Released
1986-08-21 Well Mode changed to Drilled and Cased
1986-09-20 Well Log Performed
1986-09-21 Perforation Treatment Performed - Jet Perforation
1986-10-28 Well Began Production
1986-10-28 Well Fluid changed to Crude Oil
1986-10-28 Well Mode changed to Flowing
1987-12-15 Well Fluid changed to Crude Oil
1987-12-15 Well Mode changed to Pumping
1989-06-08 Well Log Performed
1989-12-09 Perforation Treatment Performed - Cement Squeeze
1989-12-14 Perforation Treatment Performed - Jet Perforation
1989-12-15 Perforation Treatment Performed - Fractured
1989-12-15 Well Log Performed
1997-10-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-10-24 Plug Back Performed
1997-10-24 Well Fluid changed to Crude Oil
1997-10-24 Well Mode changed to Abandoned and Whipstocked
2008-08-10 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-09-21 Perforation 1601.50 1605.00 13
1986-09-21 Perforation 1607.00 1609.00 13
1989-12-09 Cement Squeeze 1601.50 1609.00 0
1989-12-14 Perforation 1601.50 1605.00 14
1989-12-15 Fracture 1601.50 1605.00 0
1997-10-24 Packing Device Capped w/Cement 1577.00 1585.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 1452 0.0 0.0 0.0
1987 6872 0.0 0.0 0.0
1988 7949 0.0 0.0 0.0
1989 7395 0.0 0.0 0.0
1990 7517 0.0 0.0 0.0
1991 3355 0.0 0.0 0.0
1996 3451 0.0 0.0 0.0
1997 5437 0.0 0.0 0.0

For data sources see[5]

References