X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1096050704000

Well Details

Well ID: 1096050704000
Loading map...
Location: 00/04-07-109-05W6/0
Location Alias: 00/04-07-09-05 W6M
Location Alias 2: 00/04-07-109-05 W6/00
Country: Canada
Province: Alberta
Township: 109
Meridian: 6
Range: 05
Section: 07
County/Municipality: Mackenzie County
Well Name: MOBIL FOCUS RAIN 4-7-109-5
Operator Name: ExxonMobil Canada Ltd.
License Number: 0033151
License Date: 1967-11-30
License Status: Abandoned
Spud Date: 1967-12-09
Final Drill Date: 1968-01-26
Well Total Depth: 2097.60 m
Surface Hole Latitude: 58.442957
Surface Hole Longitude: -118.832765

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1967-11-30 Obtained License
1967-12-29 Drill Stem Test Performed
1968-01-09 Production Casing Operation Performed
1968-01-10 Perforation Treatment Performed - Jet Perforation
1968-01-12 Perforation Treatment Performed - Cement Squeeze
1968-01-15 Perforation Treatment Performed - Cement Squeeze
1968-01-15 Perforation Treatment Performed - Jet Perforation
1968-01-16 Perforation Treatment Performed - Cement Squeeze
1968-01-26 Finished Drilling
1968-01-26 Well Mode changed to Drilled and Cased
1968-01-30 Drill Stem Test Performed
1968-01-30 Perforation Treatment Performed - Jet Perforation
1968-02-07 Well Began Production
1968-02-07 Well Fluid changed to Crude Oil
1968-02-07 Well Mode changed to Flowing
1968-08-02 Perforation Treatment Performed - Cement Squeeze
1981-05-02 Well Log Performed
1981-08-20 Perforation Treatment Performed - Jet Perforation
1981-08-22 Perforation Treatment Performed - Cement Squeeze
1981-08-23 Perforation Treatment Performed - Cement Squeeze
1981-08-26 Perforation Treatment Performed - Jet Perforation
1984-08-31 Well Fluid changed to Crude Oil
1984-08-31 Well Mode changed to Pumping
1994-04-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-04-09 Plug Back Performed
1994-04-11 Perforation Treatment Performed - Jet Perforation
1994-04-12 Perforation Treatment Performed - Remedial Casing
1994-04-12 Well Fluid changed to Crude Oil
1994-04-12 Well Mode changed to Abandoned Zone
1994-04-13 Well Abandoned
1994-04-13 Well Fluid changed to Crude Oil
1994-04-13 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-01-10 Perforation 1786.10 1786.40 13
1981-08-23 Cement Squeeze 1734.30 1737.40 0
1981-08-26 Perforation 1726.50 1728.50 13
1981-08-26 Perforation 1730.00 1731.00 13
1981-08-26 Perforation 1732.00 1734.00 13
1994-04-09 Packing Device Capped w/Cement 1712.00 1720.00 0
1994-04-09 Packing Device Capped w/Cement 1637.00 1645.00 0
1994-04-11 Perforation 450.00 451.00 14
1994-04-12 Remedial Casing Cementing 450.00 451.00 0
1968-01-12 Cement Squeeze 1786.10 1786.40 0
1968-01-15 Cement Squeeze 1786.10 1786.40 0
1968-01-15 Perforation 1647.40 1647.70 16
1968-01-16 Cement Squeeze 1647.40 1647.70 0
1968-01-30 Perforation 1734.30 1737.40 7
1968-08-02 Cement Squeeze 1786.10 1786.40 0
1981-08-20 Perforation 1750.00 1750.70 13
1981-08-22 Cement Squeeze 1750.00 1750.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1968 624 0.0 0.0 0.0
1969 2696 0.0 0.0 0.0
1970 1349 0.0 0.0 0.0
1971 2113 0.0 0.0 0.0
1972 3159 0.0 0.0 0.0
1973 7262 0.0 0.0 0.0
1974 7907 0.0 0.0 0.0
1975 7616 0.0 0.0 0.0
1976 7604 0.0 0.0 0.0
1977 3795 0.0 0.0 0.0
1978 4297 0.0 0.0 0.0
1979 7329 0.0 0.0 0.0
1980 7631 0.0 0.0 0.0
1981 7706 0.0 0.0 0.0
1982 6595 0.0 0.0 0.0
1983 8141 0.0 0.0 0.0
1984 7773 0.0 0.0 0.0
1985 8134 0.0 0.0 0.0
1986 8293 0.0 0.0 0.0
1987 8256 0.0 0.0 0.0
1988 5133 0.0 0.0 0.0
1989 934 0.0 0.0 0.0

For data sources see[5]

References