If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 1096041409000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":58.465624,"lon":-118.534489,"icon":""}]} |
Location: 00/09-14-109-04W6/0 | |
Location Alias: 00/09-14-09-04 W6M | |
Location Alias 2: 00/09-14-109-04 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 109 | |
Meridian: 6 | |
Range: 04 | |
Section: 14 | |
County/Municipality: Mackenzie County | |
Well Name: GULF RAINBOW 9-14-109-4 | |
Operator Name: ConocoPhillips Canada Resources Corp. | |
License Number: 0131532 | |
License Date: 1988-01-20 | |
License Status: RecCertified | |
Spud Date: 1988-01-23 | |
Final Drill Date: 1988-02-16 | |
Well Total Depth: 1820.00 m | |
Surface Hole Latitude: 58.465624 | |
Surface Hole Longitude: -118.534489 |
Date | Event |
---|---|
1988-01-20 | Obtained License |
1988-01-26 | Surface Casing Operation Performed |
1988-02-11 | Well Log Performed |
1988-02-12 | Well Log Performed |
1988-02-15 | Lost Circulation Occurred |
1988-02-16 | Finished Drilling |
1988-02-17 | Lost Circulation Occurred |
1988-02-17 | Well Log Performed |
1988-02-20 | Drill Stem Test Performed |
1988-02-20 | Well Log Performed |
1988-02-23 | Production Casing Operation Performed |
1988-02-23 | Rig Released |
1988-02-23 | Well Mode changed to Drilled and Cased |
1988-03-07 | Well Log Performed |
1988-03-08 | Perforation Treatment Performed - Jet Perforation |
1988-03-08 | Well Log Performed |
1988-03-09 | Perforation Treatment Performed - Remedial Casing |
1988-03-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-03-10 | Perforation Treatment Performed - Cement Squeeze |
1988-03-10 | Perforation Treatment Performed - Jet Perforation |
1988-03-12 | Well Log Performed |
1988-03-14 | Perforation Treatment Performed - Jet Perforation |
1988-03-14 | Perforation Treatment Performed - Remedial Casing |
1988-03-15 | Perforation Treatment Performed - Jet Perforation |
1988-03-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-03-18 | Perforation Treatment Performed - Cement Squeeze |
1988-03-20 | Perforation Treatment Performed - Jet Perforation |
1988-03-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-03-23 | Well Log Performed |
1988-03-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1988-03-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1988-03-25 | Perforation Treatment Performed - Cement Squeeze |
1988-03-25 | Perforation Treatment Performed - Jet Perforation |
1996-01-27 | Well Abandoned |
1996-01-27 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1988-03-08 | Perforation | 505.00 | 505.50 | 7 |
1988-03-18 | Cement Squeeze | 1670.00 | 1672.50 | 0 |
1988-03-20 | Perforation | 1671.00 | 1672.00 | 13 |
1988-03-21 | Acid Treatment | 1671.00 | 1672.00 | 0 |
1988-03-24 | Packing Device Capped w/Cement | 1647.00 | 1655.00 | 0 |
1988-03-25 | Packing Device Capped w/Cement | 482.00 | 490.00 | 0 |
1988-03-25 | Packing Device Capped w/Cement | 392.00 | 400.00 | 0 |
1988-03-25 | Perforation | 334.50 | 335.00 | 7 |
1988-03-25 | Cement Squeeze | 334.50 | 335.00 | 0 |
1988-03-09 | Remedial Casing Cementing | 505.00 | 505.50 | 0 |
1988-03-10 | Perforation | 414.50 | 415.00 | 7 |
1988-03-10 | Acid Treatment | 414.50 | 415.00 | 0 |
1988-03-10 | Cement Squeeze | 414.50 | 415.00 | 0 |
1988-03-14 | Perforation | 1675.50 | 1676.00 | 7 |
1988-03-14 | Remedial Casing Cementing | 1675.50 | 1676.00 | 0 |
1988-03-15 | Perforation | 1670.00 | 1672.50 | 13 |
1988-03-16 | Acid Treatment | 1670.00 | 1672.50 | 0 |
For data sources see[4]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1988-02-15 | Lost Circulation | 1730.00 | 1730.00 |
1988-02-17 | Lost Circulation | 1820.00 | 1820.00 |
For data sources see[5]