If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 1086101113002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":58.367972,"lon":-119.559058,"icon":""}]} |
Location: 00/13-11-108-10W6/2 | |
Location Alias: 00/13-11-08-10 W6M | |
Location Alias 2: 00/13-11-108-10 W6/02 | |
Country: Canada | |
Province: Alberta | |
Township: 108 | |
Meridian: 6 | |
Range: 10 | |
Section: 11 | |
County/Municipality: Mackenzie County | |
Well Name: HUSKY MOBIL RAINBOW S 13-11-108-10 | |
Operator Name: Husky Oil Operations Limited | |
License Number: 0032335 | |
License Date: 1967-06-22 | |
License Status: Suspension | |
Spud Date: 1967-06-23 | |
Final Drill Date: 1967-08-03 | |
Well Total Depth: 2130.60 m | |
Surface Hole Latitude: 58.367972 | |
Surface Hole Longitude: -119.559058 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1967-06-22 | Obtained License |
1967-06-23 | Direction Drilling Operation Performed - 98 |
1967-07-16 | Drill Stem Test Performed |
1967-07-21 | Drill Stem Test Performed |
1967-08-01 | Drill Stem Test Performed |
1967-08-03 | Finished Drilling |
1967-08-03 | Well Mode changed to Drilled and Cased |
1967-08-04 | Liner Casing Operation Performed |
1967-08-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1967-08-12 | Perforation Treatment Performed - Jet Perforation |
1983-02-07 | Perforation Treatment Performed - Jet Perforation |
1983-02-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1983-02-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1983-09-28 | Perforation Treatment Performed - Jet Perforation |
1983-09-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-10-24 | Perforation Treatment Performed - Jet Perforation |
1986-11-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-11-07 | Perforation Treatment Performed - Remedial Casing |
1986-11-12 | Perforation Treatment Performed - Jet Perforation |
1986-11-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-11-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1991-02-14 | Perforation Treatment Performed - Cement Squeeze |
1991-02-20 | Perforation Treatment Performed - Jet Perforation |
1991-03-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2006-04-01 | Well Log Performed |
2006-04-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-04-02 | Plug Back Performed |
2006-04-03 | Perforation Treatment Performed - Jet Perforation |
2006-06-16 | Perforation Treatment Performed - Fractured |
2006-08-10 | Well Began Production |
2006-08-10 | Well Fluid changed to Gas |
2006-08-10 | Well Mode changed to Flowing |
2018-11-05 | Well Fluid changed to Gas |
2018-11-05 | Well Mode changed to Suspended |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1967-06-23 | 1175.30 | Conversion |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1967-08-12 | Perforation | 1907.40 | 1911.10 | 3 |
1986-11-07 | Remedial Casing Cementing | 440.00 | 442.00 | 0 |
1986-11-12 | Perforation | 1881.20 | 1885.60 | 13 |
1986-11-14 | Acid Treatment | 1881.20 | 1885.60 | 0 |
1986-11-17 | Acid Treatment | 1881.20 | 1885.60 | 0 |
1991-02-14 | Cement Squeeze | 1881.20 | 1911.10 | 0 |
1991-02-20 | Perforation | 1927.00 | 1936.00 | 13 |
1991-03-02 | Acid Treatment | 1927.00 | 1936.00 | 0 |
2006-04-02 | Packing Device Capped w/Cement | 1897.00 | 1905.00 | 0 |
2006-04-02 | Packing Device Capped w/Cement | 1807.00 | 1815.00 | 0 |
2006-04-03 | Perforation | 455.30 | 460.30 | 13 |
1967-08-12 | Acid Treatment | 1907.40 | 1911.10 | 0 |
2006-06-16 | Fracture | 455.30 | 460.30 | 0 |
1983-02-07 | Perforation | 1881.80 | 1885.50 | 13 |
1983-02-08 | Acid Treatment | 1881.80 | 1885.50 | 0 |
1983-02-13 | Acid Treatment | 1881.80 | 1885.50 | 0 |
1983-09-28 | Perforation | 1881.80 | 1885.50 | 13 |
1983-09-29 | Acid Treatment | 1881.80 | 1885.50 | 0 |
1986-10-24 | Perforation | 440.00 | 442.00 | 13 |
1986-11-04 | Acid Treatment | 440.00 | 442.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 3480 | 0.0 | 0.0 | 0.0 |
2007 | 8759 | 0.0 | 0.0 | 0.0 |
2008 | 8024 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 7895 | 0.0 | 0.0 | 0.0 |
2011 | 7853 | 0.0 | 0.0 | 0.0 |
2012 | 8411 | 0.0 | 0.0 | 0.0 |
2013 | 8271 | 0.0 | 0.0 | 0.0 |
2014 | 7504 | 0.0 | 0.0 | 0.0 |
2015 | 7965 | 0.0 | 0.0 | 0.0 |
2016 | 8502 | 0.0 | 0.0 | 0.0 |
2017 | 7614 | 0.0 | 0.0 | 0.0 |
2018 | 3150 | 0.0 | 0.0 | 0.0 |
For data sources see[6]