X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1086100208030

Well Details

Well ID: 1086100208030
Loading map...
Location: 03/08-02-108-10W6/0
Location Alias: 03/08-02-08-10 W6M
Location Alias 2: 03/08-02-108-10 W6/00
Country: Canada
Province: Alberta
Township: 108
Meridian: 6
Range: 10
Section: 02
County/Municipality: Mackenzie County
Well Name: HUSKY MOBIL RAINS 8-2-108-10
Operator Name: Husky Oil Operations Limited
License Number: 0190392
License Date: 1996-08-12
License Status: Suspension
Spud Date: 1996-08-17
Final Drill Date: 1996-09-02
Well Total Depth: 2025.00 m
Surface Hole Latitude: 58.345544
Surface Hole Longitude: -119.537895

For data sources see[1][2]

Well History

Date Event
1996-08-12 Obtained License
1996-08-19 Lost Circulation Occurred
1996-08-19 Surface Casing Operation Performed
1996-08-23 Kick Occurred
1996-08-23 Lost Circulation Occurred
1996-08-27 Direction Drilling Operation Performed - Deviate
1996-08-28 Lost Circulation Occurred
1996-08-31 Intermediate Casing Operation Performed
1996-09-02 Finished Drilling
1996-09-02 Lost Circulation Occurred
1996-09-02 Well Log Performed
1996-09-02 Well Mode changed to Drilled and Cased
1996-09-03 Liner Casing Operation Performed
1996-09-03 Well Log Performed
1996-09-04 Rig Released
1996-09-23 Well Log Performed
1996-09-24 Well Log Performed
1996-09-25 Perforation Treatment Performed - Jet Perforation
1996-09-25 Well Log Performed
1996-09-26 Perforation Treatment Performed - Jet Perforation
1996-09-26 Well Log Performed
1996-09-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-09-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-09-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-10-03 Well Log Performed
1996-10-05 Perforation Treatment Performed - Cement Squeeze
1996-10-10 Perforation Treatment Performed - Jet Perforation
1996-10-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-10-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-10-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-10-14 Well Log Performed
1996-10-16 Perforation Treatment Performed - Cement Squeeze
1996-10-16 Well Log Performed
1996-10-17 Perforation Treatment Performed - Cement Plug
1996-10-17 Perforation Treatment Performed - Jet Perforation
1996-10-17 Plug Back Performed
1996-10-18 Perforation Treatment Performed - Jet Perforation
1996-10-22 Perforation Treatment Performed - Remedial Casing
1996-10-26 Well Log Performed
1996-10-27 Perforation Treatment Performed - Jet Perforation
1996-10-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-10-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-10-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-10-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-11-01 Well Began Production
1996-11-01 Well Fluid changed to Crude Oil
1996-11-01 Well Log Performed
1996-11-01 Well Mode changed to Flowing
1996-11-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-11-02 Perforation Treatment Performed - Jet Perforation
1996-11-03 Well Log Performed
2000-06-10 Perforation Treatment Performed - Jet Perforation
2000-06-10 Well Log Performed
2000-06-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-06-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-06-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-06-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-06-14 Perforation Treatment Performed - Jet Perforation
2000-06-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-06-18 Perforation Treatment Performed - Cement Squeeze
2000-06-20 Perforation Treatment Performed - Cement Squeeze
2000-06-25 Perforation Treatment Performed - Jet Perforation
2000-06-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-06-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-06-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-06-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-06-30 Perforation Treatment Performed - Jet Perforation
2000-07-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-07-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-08-01 Well Fluid changed to Crude Oil
2010-08-01 Well Mode changed to Gas Lift
2013-08-01 Perforation Treatment Performed - Chemical Squeeze
2019-03-14 Well Fluid changed to Crude Oil
2019-03-14 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-08-27 1628.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-09-25 Perforation 1899.00 1902.00 13
1996-10-10 Perforation 1890.00 1892.50 13
1996-10-10 Perforation 1899.00 1902.00 13
1996-10-12 Acid Treatment 1899.00 1902.00 0
1996-10-13 Acid Treatment 1899.00 1902.00 0
1996-10-14 Acid Treatment 1883.00 1892.50 0
1996-10-16 Cement Squeeze 1883.00 1902.00 0
1996-10-17 Perforation 1079.00 1080.00 13
1996-10-17 Cement Plug 1073.00 1081.00 13
1996-10-18 Perforation 500.00 501.00 13
1996-10-22 Remedial Casing Cementing 500.00 501.00 13
1996-09-25 Perforation 1907.50 1911.00 13
1996-10-27 Perforation 1899.00 1902.00 13
1996-10-27 Perforation 1907.50 1911.00 13
1996-10-27 Perforation 1883.00 1885.00 13
1996-10-27 Perforation 1890.00 1892.50 13
1996-10-28 Acid Treatment 1907.50 1911.00 0
1996-10-29 Acid Treatment 1899.00 1902.00 0
1996-10-30 Acid Treatment 1890.00 1892.50 0
1996-10-31 Acid Treatment 1883.00 1885.00 13
1996-11-02 Perforation 1866.50 1867.50 13
1996-11-02 Acid Treatment 1866.50 1867.50 0
1996-09-26 Perforation 1883.00 1885.00 13
2000-06-10 Perforation 1951.50 1956.00 13
2000-06-10 Perforation 1938.00 1943.00 13
2000-06-10 Perforation 1930.00 1933.00 13
2000-06-10 Perforation 1923.00 1925.00 13
2000-06-10 Perforation 1915.50 1919.50 13
2000-06-11 Acid Treatment 1951.50 1956.00 0
2000-06-12 Acid Treatment 1951.50 1956.00 0
2000-06-12 Acid Treatment 1938.00 1943.00 0
2000-06-13 Acid Treatment 1938.00 1943.00 0
2000-06-13 Acid Treatment 1930.00 1933.00 0
1996-09-26 Perforation 1890.00 1892.50 13
2000-06-14 Perforation 1923.00 1925.00 0
2000-06-14 Acid Treatment 1915.50 1919.50 0
2000-06-15 Acid Treatment 1915.50 1919.50 0
2000-06-15 Acid Treatment 1923.00 1925.00 0
2000-06-18 Cement Squeeze 1866.50 1956.00 13
2000-06-20 Cement Squeeze 1866.50 1956.00 13
2000-06-25 Perforation 1951.50 1956.00 13
2000-06-25 Perforation 1938.50 1943.00 13
2000-06-25 Perforation 1930.50 1932.50 13
2000-06-25 Perforation 1923.00 1924.00 13
1996-09-28 Acid Treatment 1907.50 1911.00 0
2000-06-25 Perforation 1916.00 1919.50 13
2000-06-25 Perforation 1908.00 1910.50 13
2000-06-25 Perforation 1899.00 1901.50 13
2000-06-25 Perforation 1890.50 1892.50 13
2000-06-26 Acid Treatment 1951.50 1956.00 0
2000-06-27 Acid Treatment 1938.50 1943.00 0
2000-06-27 Acid Treatment 1930.50 1932.50 0
2000-06-28 Acid Treatment 1923.00 1924.50 0
2000-06-28 Acid Treatment 1916.00 1919.50 0
2000-06-29 Acid Treatment 1908.00 1910.50 0
1996-09-29 Acid Treatment 1890.00 1902.00 0
2000-06-30 Perforation 1866.50 1867.50 13
2000-07-01 Acid Treatment 1923.00 1943.00 0
2000-07-01 Acid Treatment 1890.50 1892.50 0
2000-07-02 Acid Treatment 1866.50 1867.50 0
2013-08-01 Chemical Squeeze 1866.50 1956.00 0
1996-09-30 Acid Treatment 1883.00 1885.00 0
1996-10-05 Cement Squeeze 1883.00 1902.00 0
1996-10-10 Perforation 1883.00 1885.00 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 917 0.0 0.0 0.0
1997 8011 0.0 0.0 0.0
1998 7568 0.0 0.0 0.0
1999 7419 0.0 0.0 0.0
2000 7315 0.0 0.0 0.0
2001 24 0.0 0.0 0.0
2002 7121 0.0 0.0 0.0
2003 7934 0.0 0.0 0.0
2004 2737 0.0 0.0 0.0
2005 5743 0.0 0.0 0.0
2006 3540 0.0 0.0 0.0
2007 6709 0.0 0.0 0.0
2008 7542 0.0 0.0 0.0
2009 7232 0.0 0.0 0.0
2010 7041 0.0 0.0 0.0
2011 5296 0.0 0.0 0.0
2012 8454 0.0 0.0 0.0
2013 7739 0.0 0.0 0.0
2014 1278 0.0 0.0 0.0
2015 3546 0.0 0.0 0.0
2016 7996 0.0 0.0 0.0
2017 1808 0.0 0.0 0.0
2018 24 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1996-08-19 Lost Circulation 298.00 305.00
1996-08-23 Kick 1146.00 1146.00
1996-08-23 Lost Circulation 1146.00 1146.00
1996-08-28 Lost Circulation 1728.00 1858.00
1996-09-02 Lost Circulation 1930.00 2005.00
2013-08-01 No Incident Encountered 0.00 0.00

For data sources see[7]

References