X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1086100208022

Well Details

Well ID: 1086100208022
Loading map...
Location: 02/08-02-108-10W6/2
Location Alias: 02/08-02-08-10 W6M
Location Alias 2: 02/08-02-108-10 W6/02
Country: Canada
Province: Alberta
Township: 108
Meridian: 6
Range: 10
Section: 02
County/Municipality: Mackenzie County
Well Name: HUSKY MOBIL 102 RAINS 8-2-108-10
Operator Name: Husky Oil Operations Limited
License Number: 0149621
License Date: 1991-08-01
License Status: Suspension
Spud Date: 1991-08-20
Final Drill Date: 1991-09-09
Well Total Depth: 1935.00 m
Surface Hole Latitude: 58.344561
Surface Hole Longitude: -119.538097

For data sources see[1][2]

Well History

Date Event
1991-08-01 Obtained License
1991-08-21 Surface Casing Operation Performed
1991-08-30 Direction Drilling Operation Performed - Deviate
1991-09-06 Well Log Performed
1991-09-07 Well Log Performed
1991-09-08 Intermediate Casing Operation Performed
1991-09-09 Finished Drilling
1991-09-09 Well Mode changed to Drilled and Cased
1991-09-10 Lost Circulation Occurred
1991-09-10 Well Log Performed
1991-09-11 Liner Casing Operation Performed
1991-09-11 Well Log Performed
1991-09-12 Rig Released
1991-09-30 Perforation Treatment Performed - Jet Perforation
1991-09-30 Well Log Performed
1991-10-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-10-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-10-03 Perforation Treatment Performed - Cement Squeeze
1991-10-03 Plug Back Performed
1991-10-07 Perforation Treatment Performed - Jet Perforation
1991-10-08 Perforation Treatment Performed - Jet Perforation
1991-10-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-10-10 Perforation Treatment Performed - Cement Squeeze
1991-10-10 Plug Back Performed
1991-10-16 Perforation Treatment Performed - Jet Perforation
1991-10-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-10-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-10-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-10-25 Perforation Treatment Performed - Cement Squeeze
1991-10-25 Plug Back Performed
1991-10-28 Perforation Treatment Performed - Jet Perforation
1991-10-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-10-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-10-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-02-22 Well Log Performed
1994-03-31 Well Log Performed
1994-04-01 Well Log Performed
1994-04-02 Well Log Performed
1994-04-11 Well Log Performed
1994-04-18 Well Log Performed
1994-07-16 Perforation Treatment Performed - Jet Perforation
1994-07-16 Well Log Performed
1994-07-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-07-20 Perforation Treatment Performed - Cement Squeeze
1994-07-24 Perforation Treatment Performed - Jet Perforation
1994-07-24 Well Log Performed
1994-07-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-07-27 Well Log Performed
1994-07-29 Perforation Treatment Performed - Jet Perforation
1994-07-29 Well Log Performed
1994-08-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-08-01 Well Began Production
1994-08-01 Well Fluid changed to Crude Oil
1994-08-01 Well Mode changed to Flowing
1994-08-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-07-19 Well Log Performed
1995-12-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-12-05 Perforation Treatment Performed - Chemical Squeeze
1995-12-14 Well Log Performed
1995-12-15 Perforation Treatment Performed - Cement Squeeze
1995-12-15 Plug Back Performed
1995-12-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-12-20 Well Fluid changed to Crude Oil
1995-12-20 Well Mode changed to Pumping
2000-11-03 Perforation Treatment Performed - Cement Squeeze
2000-11-03 Plug Back Performed
2000-11-04 Perforation Treatment Performed - Cement Squeeze
2000-11-04 Plug Back Performed
2000-11-04 Well Fluid changed to Crude Oil
2000-11-04 Well Mode changed to Abandoned and Whipstocked
2000-11-08 Well Log Performed
2006-05-11 Well Log Performed
2006-05-16 Well Log Performed
2010-07-14 Well Log Performed
2010-07-23 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1991-08-30 1374.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1991-09-30 Perforation 1878.00 1880.00 14
1991-10-07 Perforation 1924.50 1926.50 14
1991-10-08 Perforation 1875.00 1880.00 14
1991-10-08 Perforation 1884.50 1887.50 14
1991-10-09 Acid Treatment 1924.50 1926.50 0
1991-10-09 Acid Treatment 1917.00 1920.50 0
1991-10-10 Cement Squeeze 1875.00 1909.00 0
1991-10-16 Perforation 1875.00 1880.00 14
1991-10-16 Perforation 1884.50 1887.50 14
1991-10-16 Perforation 1894.00 1897.00 14
1991-10-16 Perforation 1903.00 1909.00 14
1991-09-30 Perforation 1903.00 1905.00 14
1991-10-17 Acid Treatment 1903.00 1909.00 0
1991-10-18 Acid Treatment 1884.50 1897.00 0
1991-10-20 Acid Treatment 1875.00 1880.00 0
1991-10-25 Cement Squeeze 1875.00 1909.00 0
1991-10-28 Perforation 1875.00 1880.00 14
1991-10-28 Perforation 1884.50 1887.50 14
1991-10-28 Perforation 1894.00 1897.00 14
1991-10-29 Acid Treatment 1894.00 1897.00 0
1991-10-30 Acid Treatment 1884.50 1887.50 0
1991-10-31 Acid Treatment 1875.00 1880.00 0
1991-09-30 Perforation 1924.50 1926.50 14
1994-07-16 Perforation 1903.00 1906.00 13
1994-07-17 Acid Treatment 1884.50 1906.00 0
1994-07-20 Cement Squeeze 1875.00 1887.50 0
1994-07-24 Perforation 1875.00 1880.00 13
1994-07-24 Perforation 1884.50 1887.50 13
1994-07-25 Acid Treatment 1875.00 1897.00 0
1994-07-29 Perforation 1832.00 1838.00 13
1994-07-29 Perforation 1839.50 1841.50 13
1994-07-29 Perforation 1843.50 1850.00 13
1994-07-29 Perforation 1852.00 1858.00 13
1991-10-01 Acid Treatment 1878.00 1880.00 0
1994-08-01 Acid Treatment 1852.00 1858.00 0
1994-08-02 Acid Treatment 1843.50 1850.00 0
1994-08-02 Acid Treatment 1832.00 1838.00 0
1995-12-04 Acid Treatment 1875.00 1880.00 0
1995-12-05 Chemical Squeeze 1875.00 1880.00 0
1995-12-15 Cement Squeeze 1875.00 1909.00 0
1995-12-16 Acid Treatment 1832.00 1858.00 0
2000-11-03 Cement Squeeze 1917.00 1926.50 0
2000-11-04 Cement Squeeze 1832.00 1858.00 0
1991-10-02 Acid Treatment 1903.00 1905.00 0
1991-10-03 Cement Squeeze 1878.00 1926.50 0
1991-10-07 Perforation 1894.00 1897.00 14
1991-10-07 Perforation 1903.00 1909.00 14
1991-10-07 Perforation 1917.00 1920.50 14

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 2953 0.0 0.0 0.0
1995 5993 0.0 0.0 0.0
1996 8246 0.0 0.0 0.0
1997 7957 0.0 0.0 0.0
1998 8274 0.0 0.0 0.0
1999 6821 0.0 0.0 0.0
2000 5132 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1991-09-10 Lost Circulation 1935.00 1935.00

For data sources see[7]

References