X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1086100201000

Well Details

Well ID: 1086100201000
Loading map...
Location: 00/01-02-108-10W6/0
Location Alias: 00/01-02-08-10 W6M
Location Alias 2: 00/01-02-108-10 W6/00
Country: Canada
Province: Alberta
Township: 108
Meridian: 6
Range: 10
Section: 02
County/Municipality: Mackenzie County
Well Name: HUSKY MOBIL RAINBOWS 1-2-108-10
Operator Name: Husky Oil Operations Limited
License Number: 0031200
License Date: 1966-10-26
License Status: Issued
Spud Date: 1966-10-28
Final Drill Date: 1966-12-07
Well Total Depth: 2139.70 m
Surface Hole Latitude: 58.340360
Surface Hole Longitude: -119.536170

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-10-26 Obtained License
1966-11-19 Drill Stem Test Performed
1966-11-24 Drill Stem Test Performed
1966-12-07 Finished Drilling
1966-12-07 Well Mode changed to Drilled and Cased
1966-12-09 Drill Stem Test Performed
1966-12-10 Liner Casing Operation Performed
1966-12-24 Perforation Treatment Performed - Jet Perforation
1966-12-24 Well Began Production
1966-12-24 Well Fluid changed to Crude Oil
1966-12-24 Well Mode changed to Flowing
1966-12-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-08-21 Perforation Treatment Performed - Cement Squeeze
1974-08-22 Perforation Treatment Performed - Cement Squeeze
1974-08-26 Perforation Treatment Performed - Jet Perforation
1974-08-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-10-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-10-27 Perforation Treatment Performed - Cement Plug
1977-10-27 Perforation Treatment Performed - Jet Perforation
1978-08-25 Well Fluid changed to Crude Oil
1978-08-25 Well Mode changed to Pumping
1992-01-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-01-16 Plug Back Performed
1992-01-16 Well Fluid changed to Crude Oil
1992-01-16 Well Log Performed
1992-01-16 Well Mode changed to Abandoned Zone
1992-01-17 Perforation Treatment Performed - Jet Perforation
1992-01-19 Perforation Treatment Performed - Jet Perforation
1992-01-19 Well Log Performed
1992-01-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-01-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-01-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-01-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-02-01 Perforation Treatment Performed - Cement Squeeze
1992-02-04 Perforation Treatment Performed - Jet Perforation
1992-02-04 Well Log Performed
1992-02-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-02-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-02-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-11-18 Perforation Treatment Performed - Jet Perforation
1997-11-21 Perforation Treatment Performed - Chemical Squeeze
1997-11-22 Perforation Treatment Performed - Cement Squeeze
1997-11-27 Perforation Treatment Performed - Cement Squeeze
1997-11-30 Perforation Treatment Performed - Jet Perforation
1997-11-30 Well Log Performed
1997-12-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-12-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-12-05 Perforation Treatment Performed - Cement Squeeze
1997-12-05 Well Log Performed
1997-12-08 Perforation Treatment Performed - Jet Perforation
1997-12-08 Well Log Performed
1997-12-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-01-04 Well Fluid changed to Crude Oil
1998-01-04 Well Mode changed to Flowing
2012-01-23 Well Fluid changed to Crude Oil
2012-01-23 Well Mode changed to Gas Lift
2013-08-08 Perforation Treatment Performed - Chemical Squeeze
2014-03-04 Perforation Treatment Performed - Chemical Squeeze
2015-06-28 Perforation Treatment Performed - Chemical Squeeze

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-12-24 Perforation 1934.00 1937.00 7
1977-10-27 Cement Plug 1889.40 1890.70 0
1977-10-27 Perforation 1866.90 1871.80 7
1977-10-27 Perforation 1873.60 1875.40 7
1977-10-27 Perforation 1876.70 1877.30 7
1977-10-27 Perforation 1880.30 1881.80 7
1977-10-27 Acid Treatment 1866.90 1881.80 0
1992-01-16 Packing Device Capped w/Cement 1866.30 1869.30 0
1992-01-17 Perforation 1856.20 1857.20 14
1992-01-17 Perforation 1842.20 1843.20 14
1992-01-17 Perforation 1819.00 1820.00 14
1966-12-25 Acid Treatment 1934.00 1937.00 0
1992-01-19 Perforation 1852.90 1854.90 13
1992-01-19 Perforation 1848.30 1849.30 13
1992-01-19 Perforation 1846.00 1847.00 13
1992-01-19 Perforation 1844.00 1845.00 13
1992-01-19 Perforation 1838.20 1839.70 13
1992-01-19 Perforation 1831.50 1836.50 13
1992-01-19 Perforation 1825.80 1827.80 13
1992-01-19 Perforation 1823.60 1824.60 13
1992-01-21 Acid Treatment 1819.00 1852.90 0
1992-01-22 Acid Treatment 1819.00 1857.20 0
1974-08-21 Cement Squeeze 1934.00 1937.00 0
1992-01-26 Acid Treatment 1831.50 1836.50 0
1992-01-28 Acid Treatment 1819.00 1827.80 0
1992-02-01 Cement Squeeze 1819.00 1836.50 0
1992-02-04 Perforation 1852.90 1854.90 13
1992-02-04 Perforation 1856.20 1857.20 13
1992-02-04 Perforation 1842.20 1843.20 13
1992-02-04 Perforation 1844.00 1845.00 13
1992-02-04 Perforation 1846.20 1847.20 13
1992-02-04 Perforation 1848.30 1849.30 13
1992-02-04 Perforation 1836.20 1839.70 13
1974-08-22 Cement Squeeze 1934.00 1937.00 0
1992-02-04 Perforation 1831.50 1836.50 13
1992-02-05 Acid Treatment 1852.90 1857.20 0
1992-02-06 Acid Treatment 1842.20 1849.30 0
1992-02-07 Acid Treatment 1831.50 1839.70 0
1997-11-18 Perforation 1866.90 1871.80 7
1997-11-18 Perforation 1873.60 1875.40 7
1997-11-18 Perforation 1876.70 1877.30 7
1997-11-18 Perforation 1880.30 1881.80 7
1997-11-18 Perforation 1884.30 1887.30 7
1997-11-18 Perforation 1891.60 1894.60 7
1974-08-26 Perforation 1884.30 1887.30 7
1997-11-18 Perforation 1910.50 1921.50 7
1997-11-21 Chemical Squeeze 1884.30 1887.30 0
1997-11-21 Chemical Squeeze 1880.30 1881.80 0
1997-11-21 Chemical Squeeze 1876.70 1877.30 0
1997-11-21 Chemical Squeeze 1873.60 1875.40 0
1997-11-21 Chemical Squeeze 1866.90 1871.80 0
1997-11-22 Cement Squeeze 1910.50 1921.50 0
1997-11-22 Cement Squeeze 1891.60 1894.60 0
1997-11-22 Cement Squeeze 1884.30 1887.30 0
1997-11-22 Cement Squeeze 1880.30 1881.80 0
1974-08-26 Perforation 1891.60 1894.60 7
1997-11-22 Cement Squeeze 1876.70 1877.30 0
1997-11-22 Cement Squeeze 1873.60 1875.40 0
1997-11-22 Cement Squeeze 1866.90 1871.80 0
1997-11-27 Cement Squeeze 1856.20 1857.20 0
1997-11-27 Cement Squeeze 1852.90 1854.90 0
1997-11-27 Cement Squeeze 1848.30 1849.30 0
1997-11-27 Cement Squeeze 1846.00 1847.00 0
1997-11-27 Cement Squeeze 1844.00 1845.00 0
1997-11-27 Cement Squeeze 1842.20 1843.20 0
1997-11-27 Cement Squeeze 1838.20 1839.70 0
1974-08-26 Perforation 1910.50 1921.50 7
1997-11-27 Cement Squeeze 1836.20 1839.70 0
1997-11-27 Cement Squeeze 1831.50 1836.50 0
1997-11-30 Perforation 1910.50 1911.70 13
1997-11-30 Perforation 1901.30 1902.50 13
1997-11-30 Perforation 1892.80 1894.00 13
1997-11-30 Perforation 1885.50 1886.70 13
1997-11-30 Perforation 1870.80 1872.00 13
1997-12-01 Acid Treatment 1910.50 1911.70 0
1997-12-02 Acid Treatment 1901.30 1902.50 0
1997-12-02 Acid Treatment 1892.80 1894.00 0
1974-08-27 Acid Treatment 1910.50 1921.50 0
1997-12-02 Acid Treatment 1885.50 1886.70 0
1997-12-02 Acid Treatment 1870.80 1872.00 0
1997-12-05 Cement Squeeze 1910.50 1911.70 0
1997-12-05 Cement Squeeze 1901.30 1902.50 0
1997-12-05 Cement Squeeze 1892.80 1894.00 0
1997-12-08 Perforation 1910.50 1911.70 13
1997-12-08 Perforation 1901.30 1902.50 13
1997-12-08 Perforation 1892.80 1894.00 13
1997-12-09 Acid Treatment 1892.80 1894.00 0
1997-12-09 Acid Treatment 1885.50 1886.70 0
1974-08-27 Acid Treatment 1884.30 1894.60 0
1997-12-09 Acid Treatment 1870.80 1872.00 0
2013-08-08 Chemical Squeeze 1870.80 1911.70 0
2014-03-04 Chemical Squeeze 1870.80 1911.70 0
2015-06-28 Chemical Squeeze 1870.80 1911.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 4340 0.0 0.0 0.0
1969 5985 0.0 0.0 0.0
1970 6056 0.0 0.0 0.0
1971 7803 0.0 0.0 0.0
1972 7646 0.0 0.0 0.0
1973 3161 0.0 0.0 0.0
1974 7048 0.0 0.0 0.0
1975 7481 0.0 0.0 0.0
1976 7191 0.0 0.0 0.0
1977 639 0.0 0.0 0.0
1978 2577 0.0 0.0 0.0
1979 8380 0.0 0.0 0.0
1980 7451 0.0 0.0 0.0
1985 180 0.0 0.0 0.0
1986 2166 0.0 0.0 0.0
1998 7808 0.0 0.0 0.0
1999 7300 0.0 0.0 0.0
2000 8137 0.0 0.0 0.0
2001 3210 0.0 0.0 0.0
2002 8123 0.0 0.0 0.0
2003 8713 0.0 0.0 0.0
2004 2943 0.0 0.0 0.0
2005 3123 0.0 0.0 0.0
2006 2224 0.0 0.0 0.0
2007 2558 0.0 0.0 0.0
2008 1397 0.0 0.0 0.0
2010 8023 0.0 0.0 0.0
2011 3906 0.0 0.0 0.0
2012 4366 0.0 0.0 0.0
2013 7823 0.0 0.0 0.0
2014 5661 0.0 0.0 0.0
2015 6394 0.0 0.0 0.0
2016 7814 0.0 0.0 0.0
2017 1745 0.0 0.0 0.0
2018 595 0.0 0.0 0.0
2020 321 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-08-08 No Incident Encountered 0.00 0.00
2014-03-04 No Incident Encountered 0.00 0.00
2015-06-28 No Incident Encountered 0.00 0.00

For data sources see[6]

References