If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 1086100114030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":58.354966,"lon":-119.527255,"icon":""}]} |
Location: 03/14-01-108-10W6/0 | |
Location Alias: 03/14-01-08-10 W6M | |
Location Alias 2: 03/14-01-108-10 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 108 | |
Meridian: 6 | |
Range: 10 | |
Section: 01 | |
County/Municipality: Mackenzie County | |
Well Name: HUSKY MOBIL 103 RAINBOW 14-01-108-10 | |
Operator Name: Husky Oil Operations Limited | |
License Number: 0201300 | |
License Date: 1997-05-14 | |
License Status: Amended | |
Spud Date: 1997-06-03 | |
Final Drill Date: 1997-06-19 | |
Well Total Depth: 2023.00 m | |
Surface Hole Latitude: 58.354966 | |
Surface Hole Longitude: -119.527255 |
Date | Event |
---|---|
1997-05-14 | Obtained License |
1997-06-06 | Surface Casing Operation Performed |
1997-06-09 | Direction Drilling Operation Performed - Deviate |
1997-06-16 | Intermediate Casing Operation Performed |
1997-06-19 | Finished Drilling |
1997-06-19 | Kick Occurred |
1997-06-19 | Well Log Performed |
1997-06-19 | Well Mode changed to Drilled and Cased |
1997-06-22 | Kick Occurred |
1997-06-22 | Liner Casing Operation Performed |
1997-06-22 | Perforation Treatment Performed - Slotted Liner or Casing |
1997-06-26 | Well Log Performed |
1997-06-27 | Rig Released |
1997-07-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1997-07-07 | Perforation Treatment Performed - Open-Hole Completion |
1997-07-07 | Well Log Performed |
1997-07-08 | Perforation Treatment Performed - Jet Perforation |
1997-07-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1997-07-11 | Well Log Performed |
1997-07-12 | Perforation Treatment Performed - Jet Perforation |
1997-07-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1997-07-13 | Well Log Performed |
1997-08-06 | Well Began Production |
1997-08-06 | Well Fluid changed to Crude Oil |
1997-08-06 | Well Mode changed to Flowing |
1999-08-01 | Perforation Treatment Performed - Jet Perforation |
1999-08-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-08-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-08-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-08-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-08-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-08-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-08-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-08-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-08-14 | Perforation Treatment Performed - Cement Squeeze |
1999-08-20 | Perforation Treatment Performed - Jet Perforation |
1999-08-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-08-22 | Perforation Treatment Performed - Acid Wash - No Pressure |
1999-08-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-08-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-08-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-08-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-08-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-08-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-08-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-08-31 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-09-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2001-11-17 | Perforation Treatment Performed - Chemical Squeeze |
2001-12-18 | Well Log Performed |
2002-01-07 | Well Began Injection |
2002-01-07 | Well Fluid changed to Solvent |
2002-01-07 | Well Type changed to Injection |
2006-10-05 | Well Log Performed |
2008-10-17 | Well Fluid changed to Crude Oil |
2008-10-17 | Well Mode changed to Flowing |
2012-11-20 | Well Fluid changed to Crude Oil |
2012-11-20 | Well Mode changed to Suspended |
2016-08-11 | Well Type changed to Observation |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1997-06-09 | 952.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1997-06-22 | Slotted Liner | 1848.00 | 2023.00 | 0 |
1999-08-01 | Perforation | 1936.00 | 1941.00 | 13 |
1999-08-01 | Perforation | 1926.00 | 1930.00 | 13 |
1999-08-01 | Perforation | 1919.00 | 1922.00 | 13 |
1999-08-01 | Perforation | 1912.00 | 1915.00 | 13 |
1999-08-03 | Acid Treatment | 1936.00 | 1941.00 | 0 |
1999-08-04 | Acid Treatment | 1936.00 | 1941.00 | 0 |
1999-08-05 | Acid Treatment | 1926.00 | 1930.00 | 0 |
1999-08-06 | Acid Treatment | 1926.00 | 1930.00 | 0 |
1999-08-07 | Acid Treatment | 1926.00 | 1930.00 | 0 |
1999-08-08 | Acid Treatment | 1912.00 | 1920.00 | 0 |
1997-07-07 | Open Hole/Barefoot Completion | 1848.00 | 2023.00 | 0 |
1999-08-09 | Acid Treatment | 1936.00 | 1941.00 | 0 |
1999-08-10 | Acid Treatment | 1936.00 | 1941.00 | 0 |
1999-08-14 | Cement Squeeze | 1909.00 | 1941.00 | 0 |
1999-08-14 | Cement Squeeze | 1858.00 | 1909.00 | 0 |
1999-08-20 | Perforation | 1936.00 | 1941.00 | 13 |
1999-08-20 | Perforation | 1926.50 | 1930.00 | 13 |
1999-08-20 | Perforation | 1919.00 | 1921.50 | 13 |
1999-08-20 | Perforation | 1912.00 | 1914.50 | 13 |
1999-08-20 | Perforation | 1905.50 | 1907.50 | 13 |
1999-08-20 | Perforation | 1897.50 | 1899.50 | 13 |
1997-07-07 | Acid Treatment | 1848.00 | 2023.00 | 0 |
1999-08-20 | Perforation | 1889.00 | 1891.00 | 13 |
1999-08-20 | Perforation | 1858.00 | 1860.00 | 13 |
1999-08-22 | Acid Wash | 1858.00 | 1941.00 | 0 |
1999-08-22 | Acid Treatment | 1936.00 | 1941.00 | 0 |
1999-08-23 | Acid Treatment | 1926.50 | 1930.00 | 0 |
1999-08-25 | Acid Treatment | 1912.00 | 1921.50 | 0 |
1999-08-26 | Acid Treatment | 1936.00 | 1941.00 | 0 |
1999-08-27 | Acid Treatment | 1936.00 | 1941.00 | 0 |
1999-08-28 | Acid Treatment | 1926.50 | 1930.00 | 0 |
1999-08-29 | Acid Treatment | 1926.50 | 1930.00 | 0 |
1997-07-08 | Perforation | 1881.50 | 1883.00 | 13 |
1999-08-30 | Acid Treatment | 1905.50 | 1930.00 | 0 |
1999-08-31 | Acid Treatment | 1897.50 | 1907.50 | 0 |
1999-09-01 | Acid Treatment | 1858.00 | 1914.50 | 0 |
2001-11-17 | Chemical Squeeze | 1858.00 | 1941.00 | 0 |
1997-07-08 | Perforation | 1889.00 | 1891.00 | 13 |
1997-07-08 | Perforation | 1897.50 | 1899.50 | 13 |
1997-07-09 | Acid Treatment | 1881.50 | 1899.50 | 0 |
1997-07-12 | Perforation | 1905.50 | 1907.50 | 13 |
1997-07-13 | Acid Treatment | 1858.00 | 1860.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1997 | 2716 | 0.0 | 0.0 | 0.0 |
1998 | 5011 | 0.0 | 0.0 | 0.0 |
1999 | 3148 | 0.0 | 0.0 | 0.0 |
2000 | 5459 | 0.0 | 0.0 | 0.0 |
2001 | 1707 | 0.0 | 0.0 | 0.0 |
2002 | 0 | 0.0 | 0.0 | 0.0 |
2003 | 0 | 0.0 | 0.0 | 0.0 |
2004 | 0 | 0.0 | 0.0 | 0.0 |
2005 | 0 | 0.0 | 0.0 | 0.0 |
2006 | 0 | 0.0 | 0.0 | 0.0 |
2008 | 727 | 0.0 | 0.0 | 0.0 |
2010 | 2315 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1997-06-19 | Kick | 2023.00 | 2023.00 |
1997-06-22 | Kick | 2023.00 | 2023.00 |
For data sources see[7]