X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1086100114030

Well Details

Well ID: 1086100114030
Loading map...
Location: 03/14-01-108-10W6/0
Location Alias: 03/14-01-08-10 W6M
Location Alias 2: 03/14-01-108-10 W6/00
Country: Canada
Province: Alberta
Township: 108
Meridian: 6
Range: 10
Section: 01
County/Municipality: Mackenzie County
Well Name: HUSKY MOBIL 103 RAINBOW 14-01-108-10
Operator Name: Husky Oil Operations Limited
License Number: 0201300
License Date: 1997-05-14
License Status: Amended
Spud Date: 1997-06-03
Final Drill Date: 1997-06-19
Well Total Depth: 2023.00 m
Surface Hole Latitude: 58.354966
Surface Hole Longitude: -119.527255

For data sources see[1][2]

Well History

Date Event
1997-05-14 Obtained License
1997-06-06 Surface Casing Operation Performed
1997-06-09 Direction Drilling Operation Performed - Deviate
1997-06-16 Intermediate Casing Operation Performed
1997-06-19 Finished Drilling
1997-06-19 Kick Occurred
1997-06-19 Well Log Performed
1997-06-19 Well Mode changed to Drilled and Cased
1997-06-22 Kick Occurred
1997-06-22 Liner Casing Operation Performed
1997-06-22 Perforation Treatment Performed - Slotted Liner or Casing
1997-06-26 Well Log Performed
1997-06-27 Rig Released
1997-07-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-07-07 Perforation Treatment Performed - Open-Hole Completion
1997-07-07 Well Log Performed
1997-07-08 Perforation Treatment Performed - Jet Perforation
1997-07-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-07-11 Well Log Performed
1997-07-12 Perforation Treatment Performed - Jet Perforation
1997-07-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-07-13 Well Log Performed
1997-08-06 Well Began Production
1997-08-06 Well Fluid changed to Crude Oil
1997-08-06 Well Mode changed to Flowing
1999-08-01 Perforation Treatment Performed - Jet Perforation
1999-08-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-08-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-08-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-08-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-08-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-08-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-08-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-08-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-08-14 Perforation Treatment Performed - Cement Squeeze
1999-08-20 Perforation Treatment Performed - Jet Perforation
1999-08-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-08-22 Perforation Treatment Performed - Acid Wash - No Pressure
1999-08-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-08-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-08-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-08-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-08-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-08-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-08-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-08-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-09-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-11-17 Perforation Treatment Performed - Chemical Squeeze
2001-12-18 Well Log Performed
2002-01-07 Well Began Injection
2002-01-07 Well Fluid changed to Solvent
2002-01-07 Well Type changed to Injection
2006-10-05 Well Log Performed
2008-10-17 Well Fluid changed to Crude Oil
2008-10-17 Well Mode changed to Flowing
2012-11-20 Well Fluid changed to Crude Oil
2012-11-20 Well Mode changed to Suspended
2016-08-11 Well Type changed to Observation

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-06-09 952.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-06-22 Slotted Liner 1848.00 2023.00 0
1999-08-01 Perforation 1936.00 1941.00 13
1999-08-01 Perforation 1926.00 1930.00 13
1999-08-01 Perforation 1919.00 1922.00 13
1999-08-01 Perforation 1912.00 1915.00 13
1999-08-03 Acid Treatment 1936.00 1941.00 0
1999-08-04 Acid Treatment 1936.00 1941.00 0
1999-08-05 Acid Treatment 1926.00 1930.00 0
1999-08-06 Acid Treatment 1926.00 1930.00 0
1999-08-07 Acid Treatment 1926.00 1930.00 0
1999-08-08 Acid Treatment 1912.00 1920.00 0
1997-07-07 Open Hole/Barefoot Completion 1848.00 2023.00 0
1999-08-09 Acid Treatment 1936.00 1941.00 0
1999-08-10 Acid Treatment 1936.00 1941.00 0
1999-08-14 Cement Squeeze 1909.00 1941.00 0
1999-08-14 Cement Squeeze 1858.00 1909.00 0
1999-08-20 Perforation 1936.00 1941.00 13
1999-08-20 Perforation 1926.50 1930.00 13
1999-08-20 Perforation 1919.00 1921.50 13
1999-08-20 Perforation 1912.00 1914.50 13
1999-08-20 Perforation 1905.50 1907.50 13
1999-08-20 Perforation 1897.50 1899.50 13
1997-07-07 Acid Treatment 1848.00 2023.00 0
1999-08-20 Perforation 1889.00 1891.00 13
1999-08-20 Perforation 1858.00 1860.00 13
1999-08-22 Acid Wash 1858.00 1941.00 0
1999-08-22 Acid Treatment 1936.00 1941.00 0
1999-08-23 Acid Treatment 1926.50 1930.00 0
1999-08-25 Acid Treatment 1912.00 1921.50 0
1999-08-26 Acid Treatment 1936.00 1941.00 0
1999-08-27 Acid Treatment 1936.00 1941.00 0
1999-08-28 Acid Treatment 1926.50 1930.00 0
1999-08-29 Acid Treatment 1926.50 1930.00 0
1997-07-08 Perforation 1881.50 1883.00 13
1999-08-30 Acid Treatment 1905.50 1930.00 0
1999-08-31 Acid Treatment 1897.50 1907.50 0
1999-09-01 Acid Treatment 1858.00 1914.50 0
2001-11-17 Chemical Squeeze 1858.00 1941.00 0
1997-07-08 Perforation 1889.00 1891.00 13
1997-07-08 Perforation 1897.50 1899.50 13
1997-07-09 Acid Treatment 1881.50 1899.50 0
1997-07-12 Perforation 1905.50 1907.50 13
1997-07-13 Acid Treatment 1858.00 1860.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 2716 0.0 0.0 0.0
1998 5011 0.0 0.0 0.0
1999 3148 0.0 0.0 0.0
2000 5459 0.0 0.0 0.0
2001 1707 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2008 727 0.0 0.0 0.0
2010 2315 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1997-06-19 Kick 2023.00 2023.00
1997-06-22 Kick 2023.00 2023.00

For data sources see[7]

References