X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1086100114020

Well Details

Well ID: 1086100114020
Loading map...
Location: 02/14-01-108-10W6/0
Location Alias: 02/14-01-08-10 W6M
Location Alias 2: 02/14-01-108-10 W6/00
Country: Canada
Province: Alberta
Township: 108
Meridian: 6
Range: 10
Section: 01
County/Municipality: Mackenzie County
Well Name: HUSKY MOBIL RAINS 14-1MG-108-10
Operator Name: Husky Oil Operations Limited
License Number: 0117168
License Date: 1985-08-23
License Status: Suspension
Spud Date: 1985-09-15
Final Drill Date: 1985-10-22
Well Total Depth: 2015.00 m
Surface Hole Latitude: 58.353141
Surface Hole Longitude: -119.519744

For data sources see[1][2]

Well History

Date Event
1985-08-23 Obtained License
1985-09-16 Surface Casing Operation Performed
1985-09-22 Direction Drilling Operation Performed - Deviate
1985-10-14 Well Log Performed
1985-10-15 Well Log Performed
1985-10-16 Drill Stem Test Performed
1985-10-19 Production Casing Operation Performed
1985-10-22 Finished Drilling
1985-10-22 Lost Circulation Occurred
1985-10-22 Perforation Treatment Performed - Open-Hole Completion
1985-10-22 Well Mode changed to Drilled and Cased
1985-10-23 Well Log Performed
1985-10-24 Drill Stem Test Performed
1985-10-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-10-26 Rig Released
1985-11-27 Perforation Treatment Performed - Jet Perforation
1985-12-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-12-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-12-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-12-09 Perforation Treatment Performed - Cement Squeeze
1986-01-13 Well Began Production
1986-01-13 Well Fluid changed to Crude Oil
1986-01-13 Well Mode changed to Pumping
1986-03-18 Well Log Performed
1988-10-26 Perforation Treatment Performed - Jet Perforation
1988-10-27 Perforation Treatment Performed - Jet Perforation
1988-10-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-10-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-10-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-11-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-11-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-12-20 Perforation Treatment Performed - Jet Perforation
1989-12-20 Well Log Performed
1989-12-21 Perforation Treatment Performed - Remedial Casing
1990-01-20 Well Began Injection
1990-01-20 Well Fluid changed to Water
1990-01-20 Well Type changed to Injection
1995-04-27 Well Log Performed
2000-10-22 Well Log Performed
2000-10-24 Well Log Performed
2001-03-17 Well Log Performed
2001-04-13 Well Log Performed
2006-04-16 Well Log Performed
2012-10-12 Well Log Performed
2019-06-21 Well Fluid changed to Water
2019-06-21 Well Mode changed to Suspended
2019-06-21 Well Type changed to Injection

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1985-09-22 1200.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-10-22 Open Hole/Barefoot Completion 1965.50 2015.00 0
1985-12-09 Cement Squeeze 1815.80 1817.00 0
1988-10-26 Perforation 1932.00 1933.00 13
1988-10-26 Perforation 1920.00 1921.00 13
1988-10-26 Perforation 1907.00 1909.50 13
1988-10-26 Perforation 1904.00 1905.00 13
1988-10-26 Perforation 1901.00 1903.00 13
1988-10-26 Perforation 1898.50 1900.00 13
1988-10-26 Perforation 1893.50 1895.50 13
1988-10-26 Perforation 1889.00 1890.00 13
1988-10-26 Perforation 1883.50 1886.00 13
1985-10-25 Packing Device Capped w/Cement 1954.00 1962.00 0
1988-10-27 Perforation 1880.50 1882.00 13
1988-10-27 Perforation 1878.60 1879.60 13
1988-10-27 Perforation 1875.50 1877.00 13
1988-10-27 Perforation 1873.00 1874.30 13
1988-10-27 Perforation 1868.00 1870.00 13
1988-10-27 Perforation 1860.00 1866.00 13
1988-10-27 Perforation 1857.50 1858.50 13
1988-10-27 Perforation 1851.00 1854.00 13
1988-10-27 Perforation 1848.00 1849.50 13
1988-10-29 Acid Treatment 1920.00 1933.00 0
1985-11-27 Perforation 1924.00 1925.80 13
1988-10-30 Acid Treatment 1889.00 1909.50 0
1988-10-31 Acid Treatment 1873.00 1886.00 0
1988-11-01 Acid Treatment 1857.50 1870.00 0
1988-11-02 Acid Treatment 1842.00 1870.00 0
1989-12-20 Perforation 460.00 461.00 13
1989-12-21 Remedial Casing Cementing 460.00 461.00 0
1985-11-27 Perforation 1844.50 1847.00 13
1985-11-27 Perforation 1842.00 1844.00 13
1985-11-27 Perforation 1815.80 1817.00 13
1985-12-01 Acid Treatment 1844.50 1847.00 0
1985-12-03 Acid Treatment 1842.00 1844.00 0
1985-12-04 Acid Treatment 1815.80 1817.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 7089 0.0 0.0 0.0
1987 3859 0.0 0.0 0.0
1988 3195 0.0 0.0 0.0
1989 2541 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1985-10-22 Lost Circulation 2015.00 2015.00

For data sources see[7]

References