If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 1086100114020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":58.353141,"lon":-119.519744,"icon":""}]} |
Location: 02/14-01-108-10W6/0 | |
Location Alias: 02/14-01-08-10 W6M | |
Location Alias 2: 02/14-01-108-10 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 108 | |
Meridian: 6 | |
Range: 10 | |
Section: 01 | |
County/Municipality: Mackenzie County | |
Well Name: HUSKY MOBIL RAINS 14-1MG-108-10 | |
Operator Name: Husky Oil Operations Limited | |
License Number: 0117168 | |
License Date: 1985-08-23 | |
License Status: Suspension | |
Spud Date: 1985-09-15 | |
Final Drill Date: 1985-10-22 | |
Well Total Depth: 2015.00 m | |
Surface Hole Latitude: 58.353141 | |
Surface Hole Longitude: -119.519744 |
Date | Event |
---|---|
1985-08-23 | Obtained License |
1985-09-16 | Surface Casing Operation Performed |
1985-09-22 | Direction Drilling Operation Performed - Deviate |
1985-10-14 | Well Log Performed |
1985-10-15 | Well Log Performed |
1985-10-16 | Drill Stem Test Performed |
1985-10-19 | Production Casing Operation Performed |
1985-10-22 | Finished Drilling |
1985-10-22 | Lost Circulation Occurred |
1985-10-22 | Perforation Treatment Performed - Open-Hole Completion |
1985-10-22 | Well Mode changed to Drilled and Cased |
1985-10-23 | Well Log Performed |
1985-10-24 | Drill Stem Test Performed |
1985-10-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1985-10-26 | Rig Released |
1985-11-27 | Perforation Treatment Performed - Jet Perforation |
1985-12-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1985-12-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1985-12-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1985-12-09 | Perforation Treatment Performed - Cement Squeeze |
1986-01-13 | Well Began Production |
1986-01-13 | Well Fluid changed to Crude Oil |
1986-01-13 | Well Mode changed to Pumping |
1986-03-18 | Well Log Performed |
1988-10-26 | Perforation Treatment Performed - Jet Perforation |
1988-10-27 | Perforation Treatment Performed - Jet Perforation |
1988-10-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-10-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-10-31 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-11-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-11-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-12-20 | Perforation Treatment Performed - Jet Perforation |
1989-12-20 | Well Log Performed |
1989-12-21 | Perforation Treatment Performed - Remedial Casing |
1990-01-20 | Well Began Injection |
1990-01-20 | Well Fluid changed to Water |
1990-01-20 | Well Type changed to Injection |
1995-04-27 | Well Log Performed |
2000-10-22 | Well Log Performed |
2000-10-24 | Well Log Performed |
2001-03-17 | Well Log Performed |
2001-04-13 | Well Log Performed |
2006-04-16 | Well Log Performed |
2012-10-12 | Well Log Performed |
2019-06-21 | Well Fluid changed to Water |
2019-06-21 | Well Mode changed to Suspended |
2019-06-21 | Well Type changed to Injection |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1985-09-22 | 1200.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1985-10-22 | Open Hole/Barefoot Completion | 1965.50 | 2015.00 | 0 |
1985-12-09 | Cement Squeeze | 1815.80 | 1817.00 | 0 |
1988-10-26 | Perforation | 1932.00 | 1933.00 | 13 |
1988-10-26 | Perforation | 1920.00 | 1921.00 | 13 |
1988-10-26 | Perforation | 1907.00 | 1909.50 | 13 |
1988-10-26 | Perforation | 1904.00 | 1905.00 | 13 |
1988-10-26 | Perforation | 1901.00 | 1903.00 | 13 |
1988-10-26 | Perforation | 1898.50 | 1900.00 | 13 |
1988-10-26 | Perforation | 1893.50 | 1895.50 | 13 |
1988-10-26 | Perforation | 1889.00 | 1890.00 | 13 |
1988-10-26 | Perforation | 1883.50 | 1886.00 | 13 |
1985-10-25 | Packing Device Capped w/Cement | 1954.00 | 1962.00 | 0 |
1988-10-27 | Perforation | 1880.50 | 1882.00 | 13 |
1988-10-27 | Perforation | 1878.60 | 1879.60 | 13 |
1988-10-27 | Perforation | 1875.50 | 1877.00 | 13 |
1988-10-27 | Perforation | 1873.00 | 1874.30 | 13 |
1988-10-27 | Perforation | 1868.00 | 1870.00 | 13 |
1988-10-27 | Perforation | 1860.00 | 1866.00 | 13 |
1988-10-27 | Perforation | 1857.50 | 1858.50 | 13 |
1988-10-27 | Perforation | 1851.00 | 1854.00 | 13 |
1988-10-27 | Perforation | 1848.00 | 1849.50 | 13 |
1988-10-29 | Acid Treatment | 1920.00 | 1933.00 | 0 |
1985-11-27 | Perforation | 1924.00 | 1925.80 | 13 |
1988-10-30 | Acid Treatment | 1889.00 | 1909.50 | 0 |
1988-10-31 | Acid Treatment | 1873.00 | 1886.00 | 0 |
1988-11-01 | Acid Treatment | 1857.50 | 1870.00 | 0 |
1988-11-02 | Acid Treatment | 1842.00 | 1870.00 | 0 |
1989-12-20 | Perforation | 460.00 | 461.00 | 13 |
1989-12-21 | Remedial Casing Cementing | 460.00 | 461.00 | 0 |
1985-11-27 | Perforation | 1844.50 | 1847.00 | 13 |
1985-11-27 | Perforation | 1842.00 | 1844.00 | 13 |
1985-11-27 | Perforation | 1815.80 | 1817.00 | 13 |
1985-12-01 | Acid Treatment | 1844.50 | 1847.00 | 0 |
1985-12-03 | Acid Treatment | 1842.00 | 1844.00 | 0 |
1985-12-04 | Acid Treatment | 1815.80 | 1817.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1986 | 7089 | 0.0 | 0.0 | 0.0 |
1987 | 3859 | 0.0 | 0.0 | 0.0 |
1988 | 3195 | 0.0 | 0.0 | 0.0 |
1989 | 2541 | 0.0 | 0.0 | 0.0 |
1990 | 0 | 0.0 | 0.0 | 0.0 |
1991 | 0 | 0.0 | 0.0 | 0.0 |
1992 | 0 | 0.0 | 0.0 | 0.0 |
1993 | 0 | 0.0 | 0.0 | 0.0 |
1994 | 0 | 0.0 | 0.0 | 0.0 |
1995 | 0 | 0.0 | 0.0 | 0.0 |
1996 | 0 | 0.0 | 0.0 | 0.0 |
1997 | 0 | 0.0 | 0.0 | 0.0 |
1998 | 0 | 0.0 | 0.0 | 0.0 |
1999 | 0 | 0.0 | 0.0 | 0.0 |
2000 | 0 | 0.0 | 0.0 | 0.0 |
2001 | 0 | 0.0 | 0.0 | 0.0 |
2002 | 0 | 0.0 | 0.0 | 0.0 |
2003 | 0 | 0.0 | 0.0 | 0.0 |
2004 | 0 | 0.0 | 0.0 | 0.0 |
2005 | 0 | 0.0 | 0.0 | 0.0 |
2006 | 0 | 0.0 | 0.0 | 0.0 |
2007 | 0 | 0.0 | 0.0 | 0.0 |
2008 | 0 | 0.0 | 0.0 | 0.0 |
2009 | 0 | 0.0 | 0.0 | 0.0 |
2010 | 0 | 0.0 | 0.0 | 0.0 |
2011 | 0 | 0.0 | 0.0 | 0.0 |
2012 | 0 | 0.0 | 0.0 | 0.0 |
2013 | 0 | 0.0 | 0.0 | 0.0 |
2014 | 0 | 0.0 | 0.0 | 0.0 |
2015 | 0 | 0.0 | 0.0 | 0.0 |
2016 | 0 | 0.0 | 0.0 | 0.0 |
2017 | 0 | 0.0 | 0.0 | 0.0 |
2018 | 0 | 0.0 | 0.0 | 0.0 |
2019 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1985-10-22 | Lost Circulation | 2015.00 | 2015.00 |
For data sources see[7]