X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1086100114002

Well Details

Well ID: 1086100114002
Loading map...
Location: 00/14-01-108-10W6/2
Location Alias: 00/14-01-08-10 W6M
Location Alias 2: 00/14-01-108-10 W6/02
Country: Canada
Province: Alberta
Township: 108
Meridian: 6
Range: 10
Section: 01
County/Municipality: Mackenzie County
Well Name: HUSKY MOBIL RAINS 14-1-108-10
Operator Name: Husky Oil Operations Limited
License Number: 0051969
License Date: 1974-11-22
License Status: Suspension
Spud Date: 1974-11-30
Final Drill Date: 1974-12-27
Well Total Depth: 2015.00 m
Surface Hole Latitude: 58.352740
Surface Hole Longitude: -119.524870

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-11-22 Obtained License
1974-12-22 Production Casing Operation Performed
1974-12-27 Finished Drilling
1974-12-27 Well Mode changed to Drilled and Cased
1975-02-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-02-11 Perforation Treatment Performed - Open-Hole Completion
1975-02-16 Perforation Treatment Performed - Open-Hole Completion
1975-02-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-12-21 Well Log Performed
1992-05-09 Well Log Performed
1995-04-06 Well Log Performed
1995-04-07 Perforation Treatment Performed - Jet Perforation
1995-04-07 Well Log Performed
1995-04-09 Perforation Treatment Performed - Cement Plug
1995-04-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-04-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-04-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-04-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-04-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-04-18 Well Log Performed
1995-04-20 Perforation Treatment Performed - Cement Squeeze
1995-04-27 Well Log Performed
1995-05-15 Well Began Production
1995-05-15 Well Fluid changed to Crude Oil
1995-05-15 Well Mode changed to Pumping
1999-05-28 Well Log Performed
2000-10-22 Perforation Treatment Performed - Jet Perforation
2000-10-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-10-25 Well Log Performed
2000-10-26 Perforation Treatment Performed - Cement Squeeze
2000-10-26 Plug Back Performed
2000-10-26 Well Fluid changed to Crude Oil
2000-10-26 Well Mode changed to Abandoned Zone
2001-09-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-08-30 Well Log Performed
2002-08-31 Well Log Performed
2003-09-16 Perforation Treatment Performed - Cement Squeeze
2003-09-18 Perforation Treatment Performed - Jet Perforation
2003-09-18 Well Log Performed
2003-09-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-09-21 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-09-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-09-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-09-27 Perforation Treatment Performed - Jet Perforation
2003-09-27 Well Log Performed
2003-09-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-10-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-10-02 Perforation Treatment Performed - Jet Perforation
2003-10-04 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-02-11 Open Hole/Barefoot Completion 1847.70 1871.50 0
1995-04-07 Perforation 1840.00 1841.00 13
1995-04-07 Perforation 1843.00 1846.00 13
1995-04-09 Cement Plug 1847.00 1880.90 0
1995-04-10 Acid Treatment 1843.00 1846.00 0
1995-04-11 Acid Treatment 1834.30 1841.00 0
1995-04-12 Acid Treatment 1820.20 1831.20 0
1995-04-15 Acid Treatment 1820.20 1832.10 0
1995-04-17 Acid Treatment 1794.00 1801.00 0
1995-04-20 Cement Squeeze 1794.00 1801.00 0
2000-10-22 Perforation 1847.70 2015.00 13
1975-02-11 Acid Treatment 1847.70 1871.50 0
2000-10-23 Acid Treatment 1847.70 2015.00 0
2000-10-26 Cement Squeeze 1805.60 1841.00 0
2001-09-09 Acid Treatment 1843.00 2015.00 0
2003-09-16 Cement Squeeze 1843.00 2015.00 0
2003-09-18 Perforation 1951.00 1956.00 13
2003-09-18 Perforation 1938.00 1944.00 13
2003-09-18 Perforation 1925.00 1929.00 13
2003-09-18 Perforation 1920.00 1922.00 13
2003-09-18 Perforation 1914.50 1916.00 13
2003-09-18 Perforation 1908.50 1910.00 13
1975-02-16 Open Hole/Barefoot Completion 1847.70 1880.90 0
2003-09-19 Acid Treatment 1951.00 1956.00 0
2003-09-21 Acid Treatment 1938.00 1944.00 0
2003-09-22 Acid Treatment 1925.00 1929.00 0
2003-09-23 Acid Treatment 1920.00 1922.00 0
2003-09-27 Perforation 1979.00 1985.00 13
2003-09-27 Perforation 1888.00 1890.00 13
2003-09-27 Perforation 1882.00 1886.00 13
2003-09-29 Acid Treatment 1882.00 1890.00 0
2003-10-01 Acid Treatment 1979.00 1985.00 0
2003-10-02 Perforation 1843.50 1845.50 13
1975-02-22 Acid Treatment 1847.70 1880.90 0
1995-04-07 Perforation 1794.00 1801.00 13
1995-04-07 Perforation 1805.60 1810.60 13
1995-04-07 Perforation 1812.30 1817.30 13
1995-04-07 Perforation 1820.20 1831.20 13
1995-04-07 Perforation 1834.30 1836.30 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 5305 0.0 0.0 0.0
1996 8200 0.0 0.0 0.0
1997 6097 0.0 0.0 0.0
1998 8661 0.0 0.0 0.0
1999 3249 0.0 0.0 0.0
2000 5355 0.0 0.0 0.0

For data sources see[5]

References