If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 1086100113040 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":58.354966,"lon":-119.527358,"icon":""}]} |
Location: 04/13-01-108-10W6/0 | |
Location Alias: 04/13-01-08-10 W6M | |
Location Alias 2: 04/13-01-108-10 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 108 | |
Meridian: 6 | |
Range: 10 | |
Section: 01 | |
County/Municipality: Mackenzie County | |
Well Name: HUSKY MOBIL 13D RAINS 13-1-108-10 | |
Operator Name: Husky Oil Operations Limited | |
License Number: 0186805 | |
License Date: 1996-03-14 | |
License Status: Issued | |
Spud Date: 1996-05-19 | |
Final Drill Date: 1996-06-03 | |
Well Total Depth: 2020.60 m | |
Surface Hole Latitude: 58.354966 | |
Surface Hole Longitude: -119.527358 |
Date | Event |
---|---|
1996-03-14 | Obtained License |
1996-05-21 | Surface Casing Operation Performed |
1996-05-25 | Direction Drilling Operation Performed - Deviate |
1996-05-25 | Well Log Performed |
1996-06-01 | Intermediate Casing Operation Performed |
1996-06-03 | Finished Drilling |
1996-06-03 | Lost Circulation Occurred |
1996-06-03 | Well Mode changed to Drilled and Cased |
1996-06-04 | Well Log Performed |
1996-06-06 | Liner Casing Operation Performed |
1996-06-06 | Well Log Performed |
1996-06-07 | Rig Released |
1996-06-15 | Well Log Performed |
1996-06-16 | Well Log Performed |
1996-06-17 | Perforation Treatment Performed - Jet Perforation |
1996-06-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1996-06-19 | Well Log Performed |
1996-06-20 | Perforation Treatment Performed - Jet Perforation |
1996-06-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1996-06-21 | Well Log Performed |
1996-06-23 | Perforation Treatment Performed - Cement Squeeze |
1996-06-25 | Well Log Performed |
1996-06-26 | Perforation Treatment Performed - Jet Perforation |
1996-06-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1996-07-01 | Well Began Production |
1996-07-01 | Well Fluid changed to Crude Oil |
1996-07-01 | Well Mode changed to Flowing |
1996-07-24 | Well Log Performed |
2002-07-12 | Perforation Treatment Performed - Jet Perforation |
2002-07-13 | Perforation Treatment Performed - Jet Perforation |
2002-07-13 | Well Log Performed |
2002-07-16 | Well Log Performed |
2002-07-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2002-07-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2002-07-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2002-07-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2002-07-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2002-07-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2002-07-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2002-07-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2002-07-27 | Perforation Treatment Performed - Jet Perforation |
2002-07-27 | Well Log Performed |
2002-07-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2002-07-29 | Perforation Treatment Performed - Chemical Squeeze |
2002-07-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2002-07-30 | Perforation Treatment Performed - Chemical Squeeze |
2002-08-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2002-08-02 | Perforation Treatment Performed - Chemical Squeeze |
2002-08-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2002-08-03 | Perforation Treatment Performed - Chemical Squeeze |
2002-08-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2002-08-04 | Perforation Treatment Performed - Chemical Squeeze |
2002-08-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2002-08-05 | Perforation Treatment Performed - Chemical Squeeze |
2002-08-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2002-08-06 | Perforation Treatment Performed - Chemical Squeeze |
2002-08-07 | Well Log Performed |
2017-03-30 | Well Fluid changed to Crude Oil |
2017-03-30 | Well Mode changed to Suspended |
2017-09-01 | Well Fluid changed to Crude Oil |
2017-09-01 | Well Mode changed to Flowing |
2017-12-20 | Well Fluid changed to Crude Oil |
2017-12-20 | Well Mode changed to Gas Lift |
2019-04-30 | Well Fluid changed to Crude Oil |
2019-04-30 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1996-05-25 | 1123.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1996-06-17 | Perforation | 1863.00 | 1864.00 | 13 |
1996-06-26 | Perforation | 1877.00 | 1880.00 | 13 |
1996-06-26 | Perforation | 1898.00 | 1901.00 | 13 |
1996-06-26 | Perforation | 1906.00 | 1908.00 | 13 |
1996-06-26 | Perforation | 1912.50 | 1915.00 | 13 |
1996-06-27 | Acid Treatment | 1877.00 | 1915.00 | 0 |
2002-07-12 | Perforation | 1957.00 | 1958.50 | 14 |
2002-07-12 | Perforation | 1949.50 | 1950.50 | 14 |
2002-07-13 | Perforation | 1941.50 | 1945.50 | 14 |
2002-07-13 | Perforation | 1930.50 | 1935.50 | 14 |
2002-07-13 | Perforation | 1918.00 | 1920.50 | 14 |
1996-06-17 | Perforation | 1877.00 | 1880.00 | 13 |
2002-07-17 | Acid Treatment | 1957.00 | 1958.50 | 0 |
2002-07-17 | Acid Treatment | 1949.50 | 1950.50 | 0 |
2002-07-17 | Acid Treatment | 1941.50 | 1945.50 | 0 |
2002-07-17 | Acid Treatment | 1930.50 | 1935.50 | 0 |
2002-07-17 | Acid Treatment | 1918.00 | 1920.50 | 0 |
2002-07-18 | Acid Treatment | 1912.50 | 1915.00 | 0 |
2002-07-18 | Acid Treatment | 1906.00 | 1908.00 | 0 |
2002-07-18 | Acid Treatment | 1898.00 | 1901.00 | 0 |
2002-07-18 | Acid Treatment | 1877.00 | 1880.00 | 0 |
2002-07-18 | Acid Treatment | 1862.00 | 1865.00 | 0 |
1996-06-17 | Perforation | 1898.00 | 1901.50 | 13 |
2002-07-21 | Acid Treatment | 1957.00 | 1958.50 | 0 |
2002-07-22 | Acid Treatment | 1957.00 | 1958.50 | 0 |
2002-07-23 | Acid Treatment | 1949.50 | 1950.50 | 0 |
2002-07-24 | Acid Treatment | 1949.50 | 1950.50 | 0 |
2002-07-24 | Acid Treatment | 1941.50 | 1945.50 | 0 |
2002-07-25 | Acid Treatment | 1941.50 | 1945.50 | 0 |
2002-07-25 | Acid Treatment | 1949.50 | 1950.50 | 0 |
2002-07-25 | Acid Treatment | 1930.50 | 1935.50 | 0 |
2002-07-26 | Acid Treatment | 1918.00 | 1920.50 | 0 |
2002-07-27 | Perforation | 1954.00 | 1958.50 | 17 |
1996-06-17 | Perforation | 1905.50 | 1908.50 | 13 |
2002-07-27 | Perforation | 1948.00 | 1950.50 | 17 |
2002-07-27 | Perforation | 1941.50 | 1945.50 | 17 |
2002-07-27 | Perforation | 1930.50 | 1935.50 | 17 |
2002-07-28 | Acid Treatment | 1954.00 | 1958.00 | 0 |
2002-07-28 | Acid Treatment | 1948.00 | 1950.50 | 0 |
2002-07-28 | Acid Treatment | 1941.50 | 1945.50 | 0 |
2002-07-28 | Acid Treatment | 1930.50 | 1935.50 | 0 |
2002-07-28 | Acid Treatment | 1954.00 | 1958.50 | 0 |
2002-07-29 | Chemical Squeeze | 1930.50 | 1958.50 | 0 |
2002-07-30 | Acid Treatment | 1930.50 | 1958.50 | 0 |
1996-06-17 | Perforation | 1912.00 | 1915.00 | 13 |
2002-07-30 | Chemical Squeeze | 1930.50 | 1958.50 | 0 |
2002-08-02 | Chemical Squeeze | 1954.00 | 1958.50 | 0 |
2002-08-02 | Acid Treatment | 1954.00 | 1958.50 | 0 |
2002-08-03 | Chemical Squeeze | 1948.00 | 1950.50 | 0 |
2002-08-03 | Acid Treatment | 1948.00 | 1950.50 | 0 |
2002-08-04 | Chemical Squeeze | 1941.50 | 1945.50 | 0 |
2002-08-04 | Chemical Squeeze | 1948.00 | 1950.50 | 0 |
2002-08-04 | Acid Treatment | 1941.50 | 1945.50 | 0 |
2002-08-04 | Acid Treatment | 1948.00 | 1950.50 | 0 |
2002-08-05 | Chemical Squeeze | 1941.50 | 1945.50 | 0 |
1996-06-19 | Acid Treatment | 1863.00 | 1915.00 | 0 |
2002-08-05 | Chemical Squeeze | 1948.00 | 1950.50 | 0 |
2002-08-05 | Acid Treatment | 1941.50 | 1945.50 | 0 |
2002-08-05 | Acid Treatment | 1948.00 | 1950.50 | 0 |
2002-08-06 | Acid Treatment | 1862.00 | 1865.00 | 0 |
2002-08-06 | Chemical Squeeze | 1862.00 | 1865.00 | 0 |
1996-06-20 | Perforation | 1862.00 | 1865.00 | 13 |
1996-06-21 | Acid Treatment | 1862.00 | 1865.00 | 0 |
1996-06-23 | Cement Squeeze | 1877.00 | 1908.50 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1996 | 4151 | 0.0 | 0.0 | 0.0 |
1997 | 6790 | 0.0 | 0.0 | 0.0 |
1998 | 8320 | 0.0 | 0.0 | 0.0 |
1999 | 7413 | 0.0 | 0.0 | 0.0 |
2000 | 1312 | 0.0 | 0.0 | 0.0 |
2001 | 1149 | 0.0 | 0.0 | 0.0 |
2002 | 2962 | 0.0 | 0.0 | 0.0 |
2003 | 6835 | 0.0 | 0.0 | 0.0 |
2004 | 425 | 0.0 | 0.0 | 0.0 |
2005 | 963 | 0.0 | 0.0 | 0.0 |
2006 | 4481 | 0.0 | 0.0 | 0.0 |
2007 | 4761 | 0.0 | 0.0 | 0.0 |
2008 | 7906 | 0.0 | 0.0 | 0.0 |
2009 | 6754 | 0.0 | 0.0 | 0.0 |
2010 | 5034 | 0.0 | 0.0 | 0.0 |
2011 | 7611 | 0.0 | 0.0 | 0.0 |
2012 | 8571 | 0.0 | 0.0 | 0.0 |
2013 | 8350 | 0.0 | 0.0 | 0.0 |
2014 | 3410 | 0.0 | 0.0 | 0.0 |
2015 | 21 | 0.0 | 0.0 | 0.0 |
2017 | 265 | 0.0 | 0.0 | 0.0 |
2018 | 6932 | 0.0 | 0.0 | 0.0 |
2019 | 5801 | 0.0 | 0.0 | 0.0 |
2020 | 2077 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1996-06-03 | Lost Circulation | 2020.60 | 2020.60 |
2002-08-08 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]