X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1086100112003

Well Details

Well ID: 1086100112003
Loading map...
Location: 00/12-01-108-10W6/3
Location Alias: 00/12-01-08-10 W6M
Location Alias 2: 00/12-01-108-10 W6/03
Country: Canada
Province: Alberta
Township: 108
Meridian: 6
Range: 10
Section: 01
County/Municipality: Mackenzie County
Well Name: HUSKY MOBIL RAINBOW 12-1-108-10
Operator Name: Husky Oil Operations Limited
License Number: 0033128
License Date: 1967-11-28
License Status: Suspension
Spud Date: 1967-12-05
Final Drill Date: 1968-01-08
Well Total Depth: 2127.50 m
Surface Hole Latitude: 58.349657
Surface Hole Longitude: -119.529398

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1967-11-28 Obtained License
1967-12-05 Direction Drilling Operation Performed - 98
1968-01-08 Finished Drilling
1968-01-08 Well Mode changed to Drilled and Cased
1968-01-10 Drill Stem Test Performed
1968-01-11 Drill Stem Test Performed
1968-01-13 Liner Casing Operation Performed
1968-01-18 Perforation Treatment Performed - Jet Perforation
1968-01-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-10-14 Perforation Treatment Performed - Cement Squeeze
1978-10-15 Perforation Treatment Performed - Jet Perforation
1978-10-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-10-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-10-04 Plug Back Performed
1988-10-05 Perforation Treatment Performed - Jet Perforation
1988-10-06 Perforation Treatment Performed - Jet Perforation
1988-10-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-10-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-10-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-10-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-10-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-03-30 Perforation Treatment Performed - Jet Perforation
2011-04-12 Well Log Performed
2011-04-13 Perforation Treatment Performed - Jet Perforation
2011-04-13 Well Log Performed
2011-04-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-04-16 Well Log Performed
2011-08-24 Well Began Injection
2011-08-24 Well Fluid changed to Water
2011-08-24 Well Type changed to Injection
2015-06-10 Well Fluid changed to Water
2015-06-10 Well Mode changed to Suspended
2015-06-10 Well Type changed to Injection

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1967-12-05 1393.20 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-01-18 Perforation 1971.40 1975.70 7
1988-10-04 Packing Device Capped w/Cement 1938.00 1945.00 0
1988-10-05 Perforation 1918.00 1921.50 13
1988-10-05 Perforation 1910.00 1916.00 13
1988-10-05 Perforation 1908.00 1909.50 13
1988-10-05 Perforation 1899.00 1902.00 13
1988-10-05 Perforation 1896.50 1897.50 13
1988-10-05 Perforation 1893.50 1895.20 13
1988-10-05 Perforation 1890.50 1892.50 13
1988-10-05 Perforation 1886.50 1889.00 13
1988-10-05 Perforation 1883.00 1885.00 13
1968-01-19 Acid Treatment 1971.40 1975.70 0
1988-10-05 Perforation 1877.50 1881.00 13
1988-10-06 Perforation 1869.50 1870.50 13
1988-10-06 Perforation 1862.00 1864.00 13
1988-10-06 Perforation 1855.40 1861.00 13
1988-10-06 Perforation 1852.20 1854.40 13
1988-10-06 Perforation 1844.00 1845.00 13
1988-10-06 Perforation 1838.50 1841.50 13
1988-10-06 Perforation 1824.00 1825.00 13
1988-10-06 Perforation 1821.50 1822.50 1
1988-10-09 Acid Treatment 1908.00 1921.50 0
1978-10-14 Cement Squeeze 1971.40 1975.70 0
1988-10-11 Acid Treatment 1869.50 1902.00 0
1988-10-13 Acid Treatment 1852.20 1864.00 0
1988-10-14 Acid Treatment 1821.50 1845.00 0
1988-10-16 Acid Treatment 1869.50 1902.00 0
2011-03-30 Perforation 1954.40 1955.00 7
2011-03-30 Perforation 1957.70 1958.60 7
2011-03-30 Perforation 1959.60 1961.10 7
2011-03-30 Perforation 1963.50 1964.70 7
2011-03-30 Perforation 1965.60 1966.00 7
2011-04-13 Perforation 1996.00 2006.00 13
1978-10-15 Perforation 1954.40 1955.00 0
2011-04-14 Acid Treatment 1996.00 2006.00 0
1978-10-15 Perforation 1957.70 1958.60 0
1978-10-15 Perforation 1959.60 1961.10 0
1978-10-15 Perforation 1963.50 1964.70 0
1978-10-15 Perforation 1965.60 1966.00 0
1978-10-16 Acid Treatment 1954.40 1966.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0

For data sources see[6]

References