X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1086093512000

Well Details

Well ID: 1086093512000
Loading map...
Location: 00/12-35-108-09W6/0
Location Alias: 00/12-35-08-09 W6M
Location Alias 2: 00/12-35-108-09 W6/00
Country: Canada
Province: Alberta
Township: 108
Meridian: 6
Range: 09
Section: 35
County/Municipality: Mackenzie County
Well Name: HUSKY RAINBOW 12-35-108-09
Operator Name: Husky Oil Operations Limited
License Number: 0035559
License Date: 1969-01-03
License Status: Abandoned
Spud Date: 1969-01-10
Final Drill Date: 1969-01-31
Well Total Depth: 1915.70 m
Surface Hole Latitude: 58.421715
Surface Hole Longitude: -119.391092

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1969-01-03 Obtained License
1969-01-31 Finished Drilling
1969-02-02 Drill Stem Test Performed
1969-02-03 Drill Stem Test Performed
1969-02-05 Drill Stem Test Performed
1969-02-06 Drill Stem Test Performed
1969-02-07 Production Casing Operation Performed
1969-02-21 Perforation Treatment Performed - Jet Perforation
1969-02-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-02-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-03-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1969-03-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-03-02 Perforation Treatment Performed - Jet Perforation
1969-03-06 Perforation Treatment Performed - Cement Squeeze
1969-03-08 Perforation Treatment Performed - Jet Perforation
1969-03-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1969-03-13 Perforation Treatment Performed - Jet Perforation
1969-03-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-03-17 Perforation Treatment Performed - Cement Squeeze
1970-03-06 Well Mode changed to Drilled and Cased
1980-01-20 Perforation Treatment Performed - Jet Perforation
1980-01-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-03-10 Well Began Production
1985-03-10 Well Fluid changed to Crude Oil
1985-03-10 Well Mode changed to Flowing
1985-03-20 Well Fluid changed to Crude Oil
1985-03-20 Well Mode changed to Suspended
2003-03-15 Well Log Performed
2003-03-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-03-16 Plug Back Performed
2003-03-16 Well Fluid changed to Crude Oil
2003-03-16 Well Log Performed
2003-03-16 Well Mode changed to Abandoned Zone
2003-03-18 Well Log Performed
2003-03-21 Well Log Performed
2003-03-22 Perforation Treatment Performed - Jet Perforation
2003-03-22 Well Log Performed
2003-03-29 Perforation Treatment Performed - Jet Perforation
2003-04-03 Perforation Treatment Performed - Jet Perforation
2003-04-03 Well Log Performed
2003-04-05 Perforation Treatment Performed - Cement Plug
2003-04-05 Plug Back Performed
2003-04-09 Well Log Performed
2003-04-10 Perforation Treatment Performed - Remedial Casing
2003-04-11 Perforation Treatment Performed - Cement Plug
2003-04-11 Plug Back Performed
2003-04-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-04-13 Perforation Treatment Performed - Remedial Casing
2003-04-13 Plug Back Performed
2003-04-14 Well Log Performed
2003-04-16 Well Fluid changed to Crude Oil
2003-04-16 Well Mode changed to Abandoned
2004-02-02 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1969-02-21 Perforation 1877.60 1880.00 7
1969-03-02 Acid Treatment 1820.00 1842.80 0
1969-03-06 Cement Squeeze 1820.00 1842.80 0
1969-03-08 Perforation 1831.20 1834.30 7
1969-03-13 Packing Device Capped w/Cement 1829.10 1829.10 0
1969-03-13 Perforation 1821.20 1822.40 7
1969-03-14 Acid Treatment 1821.20 1822.40 0
1969-03-17 Cement Squeeze 1821.20 1822.40 0
1980-01-20 Perforation 1839.70 1842.70 13
1980-01-21 Acid Treatment 1831.20 1842.70 0
2003-03-16 Packing Device Capped w/Cement 1808.50 1816.50 0
1969-02-21 Perforation 1881.80 1887.60 7
2003-03-22 Perforation 714.00 716.00 13
2003-03-29 Perforation 459.00 461.00 17
2003-04-03 Perforation 1781.50 1783.50 17
2003-04-05 Cement Plug 1645.60 1787.20 0
2003-04-10 Remedial Casing Cementing 714.00 716.00 0
2003-04-11 Cement Plug 598.00 710.50 0
2003-04-13 Remedial Casing Cementing 459.00 461.00 0
2003-04-13 Packing Device Capped w/Cement 420.00 445.00 0
1969-02-21 Perforation 1888.50 1890.10 7
1969-02-22 Acid Treatment 1877.60 1890.10 0
1969-02-26 Acid Treatment 1877.60 1890.10 0
1969-03-01 Packing Device Capped w/Cement 1867.20 1867.20 0
1969-03-02 Perforation 1820.00 1828.20 7
1969-03-02 Perforation 1831.20 1834.30 7
1969-03-02 Perforation 1839.80 1842.80 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 54 0.0 0.0 0.0

For data sources see[5]

References