X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1086092707002

Well Details

Well ID: 1086092707002
Loading map...
Location: 00/07-27-108-09W6/2
Location Alias: 00/07-27-08-09 W6M
Location Alias 2: 00/07-27-108-09 W6/02
Country: Canada
Province: Alberta
Township: 108
Meridian: 6
Range: 09
Section: 27
County/Municipality: Mackenzie County
Well Name: HUSKY MOBIL TEHZE 7-27-108-9
Operator Name: Husky Oil Operations Limited
License Number: 0059914
License Date: 1976-08-25
License Status: Suspension
Spud Date: 1976-09-12
Final Drill Date: 1976-10-02
Well Total Depth: 2023.00 m
Surface Hole Latitude: 58.402959
Surface Hole Longitude: -119.406139

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-08-25 Obtained License
1976-10-02 Finished Drilling
1976-10-02 Well Mode changed to Drilled and Cased
1976-10-11 Production Casing Operation Performed
1976-11-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-11-16 Perforation Treatment Performed - Jet Perforation
1985-08-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-08-25 Plug Back Performed
1985-08-26 Perforation Treatment Performed - Jet Perforation
1985-08-27 Perforation Treatment Performed - Acid Wash - No Pressure
1985-09-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-09-01 Perforation Treatment Performed - Cement Squeeze
1985-09-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-09-11 Perforation Treatment Performed - Fractured
1985-09-21 Well Began Production
1985-09-21 Well Fluid changed to Crude Oil
1985-09-21 Well Mode changed to Pumping
1987-04-01 Well Fluid changed to Crude Oil
1987-04-01 Well Mode changed to Suspended
1987-08-05 Perforation Treatment Performed - Jet Perforation
1987-08-06 Perforation Treatment Performed - Jet Perforation
1987-08-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-08-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-08-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-08-10 Perforation Treatment Performed - Acid Wash - No Pressure
1987-08-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-09-09 Well Began Injection
1987-09-09 Well Fluid changed to Water
1987-09-09 Well Type changed to Injection
1994-11-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-11-30 Well Log Performed
1994-12-01 Well Log Performed
1994-12-02 Perforation Treatment Performed - Jet Perforation
1994-12-03 Perforation Treatment Performed - Remedial Casing
1994-12-07 Perforation Treatment Performed - Remedial Casing
1994-12-11 Well Log Performed
2004-07-13 Well Log Performed
2004-07-30 Perforation Treatment Performed - Jet Perforation
2004-08-01 Perforation Treatment Performed - Remedial Casing
2004-08-06 Well Log Performed
2004-08-08 Well Log Performed
2004-08-09 Well Log Performed
2006-07-05 Well Log Performed
2010-12-15 Well Log Performed
2010-12-16 Well Log Performed
2010-12-17 Perforation Treatment Performed - Jet Perforation
2010-12-18 Perforation Treatment Performed - Jet Perforation
2011-01-10 Well Log Performed
2011-01-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-01-18 Perforation Treatment Performed - Cement Squeeze
2011-01-26 Perforation Treatment Performed - Jet Perforation
2011-01-26 Well Log Performed
2011-01-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-02-05 Well Log Performed
2011-02-07 Well Log Performed
2012-08-25 Well Fluid changed to Water
2012-08-25 Well Mode changed to Suspended
2012-08-25 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-11-16 Perforation 1965.40 1967.20 7
1985-09-01 Cement Squeeze 1875.70 1882.10 0
1985-09-09 Acid Treatment 1884.30 1888.80 0
1985-09-11 Fracture 1867.20 1870.90 0
1987-08-05 Perforation 1875.70 1882.10 13
1987-08-05 Perforation 1889.80 1896.50 13
1987-08-05 Perforation 1902.00 1910.50 13
1987-08-05 Perforation 1916.00 1919.00 13
1987-08-06 Perforation 1786.10 1788.00 13
1987-08-06 Perforation 1791.00 1795.30 13
1987-08-06 Perforation 1797.70 1800.00 13
1976-11-16 Perforation 1971.10 1975.10 7
1987-08-06 Perforation 1804.10 1807.50 13
1987-08-06 Perforation 1808.10 1813.60 13
1987-08-06 Perforation 1814.80 1819.00 13
1987-08-06 Perforation 1823.30 1828.80 13
1987-08-06 Perforation 1830.30 1836.40 13
1987-08-06 Perforation 1840.10 1841.60 13
1987-08-06 Perforation 1842.50 1850.10 13
1987-08-06 Perforation 1852.00 1855.60 13
1987-08-06 Perforation 1857.80 1859.90 13
1987-08-06 Perforation 1862.00 1864.20 13
1976-11-16 Acid Treatment 1965.40 1975.10 0
1987-08-07 Acid Treatment 1875.70 1919.00 0
1987-08-08 Acid Treatment 1857.80 1864.20 0
1987-08-08 Acid Treatment 1840.10 1855.60 0
1987-08-08 Acid Treatment 1823.30 1836.40 0
1987-08-10 Acid Wash 1804.10 1819.00 0
1987-08-10 Acid Treatment 1786.00 1819.00 0
1987-08-11 Acid Treatment 1786.10 1819.00 0
1994-11-29 Acid Treatment 1786.10 1919.00 0
1994-12-02 Perforation 483.00 484.00 13
1994-12-03 Remedial Casing Cementing 483.00 484.00 0
1985-08-25 Packing Device Capped w/Cement 1942.00 1950.00 0
1994-12-07 Remedial Casing Cementing 483.00 484.00 0
2004-07-30 Perforation 483.00 484.00 13
2004-08-01 Remedial Casing Cementing 483.00 484.00 0
2010-12-17 Perforation 1772.00 1778.00 13
2010-12-18 Perforation 1764.50 1768.00 13
2010-12-18 Perforation 1761.00 1764.50 13
2011-01-12 Acid Treatment 1772.00 1778.00 0
2011-01-12 Acid Treatment 1764.50 1768.00 0
2011-01-12 Acid Treatment 1761.00 1764.50 0
2011-01-18 Cement Squeeze 1814.80 1819.00 0
1985-08-26 Perforation 1884.30 1888.80 13
2011-01-18 Cement Squeeze 1808.10 1813.60 0
2011-01-18 Cement Squeeze 1804.10 1807.50 0
2011-01-18 Cement Squeeze 1797.70 1800.00 0
2011-01-18 Cement Squeeze 1791.00 1795.30 0
2011-01-18 Cement Squeeze 1786.10 1788.00 0
2011-01-26 Perforation 1761.00 1768.00 13
2011-01-27 Acid Treatment 1761.00 1768.00 0
1985-08-26 Perforation 1875.70 1882.10 13
1985-08-26 Perforation 1867.20 1870.90 13
1985-08-27 Acid Wash 1867.20 1888.80 0
1985-09-01 Acid Treatment 1875.70 1882.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 2118 0.0 0.0 0.0
1986 5201 0.0 0.0 0.0
1987 315 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0

For data sources see[5]

References