If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 1086092702000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":58.399883,"lon":-119.406233,"icon":""}]} |
Location: 00/02-27-108-09W6/0 | |
Location Alias: 00/02-27-08-09 W6M | |
Location Alias 2: 00/02-27-108-09 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 108 | |
Meridian: 6 | |
Range: 09 | |
Section: 27 | |
County/Municipality: Mackenzie County | |
Well Name: HUSKY MOBIL RAINBOW 2-27-108-9 | |
Operator Name: Husky Oil Operations Limited | |
License Number: 0031087 | |
License Date: 1966-10-03 | |
License Status: Suspension | |
Spud Date: 1966-10-08 | |
Final Drill Date: 1966-11-13 | |
Well Total Depth: 2118.40 m | |
Surface Hole Latitude: 58.399883 | |
Surface Hole Longitude: -119.406233 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1966-10-03 | Obtained License |
1966-10-25 | Drill Stem Test Performed |
1966-10-26 | Drill Stem Test Performed |
1966-10-28 | Drill Stem Test Performed |
1966-11-02 | Drill Stem Test Performed |
1966-11-09 | Drill Stem Test Performed |
1966-11-13 | Finished Drilling |
1966-11-13 | Well Mode changed to Drilled and Cased |
1966-11-16 | Drill Stem Test Performed |
1966-11-18 | Liner Casing Operation Performed |
1966-12-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1966-12-07 | Perforation Treatment Performed - Jet Perforation |
1966-12-20 | Perforation Treatment Performed - Jet Perforation |
1966-12-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1966-12-23 | Well Began Production |
1966-12-23 | Well Fluid changed to Crude Oil |
1966-12-23 | Well Mode changed to Flowing |
1967-06-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1967-06-04 | Perforation Treatment Performed - Jet Perforation |
1971-12-14 | Perforation Treatment Performed - Cement Squeeze |
1971-12-15 | Perforation Treatment Performed - Jet Perforation |
1971-12-22 | Well Began Injection |
1971-12-22 | Well Fluid changed to Water |
1971-12-22 | Well Type changed to Injection |
1978-04-15 | Perforation Treatment Performed - Jet Perforation |
1978-04-18 | Perforation Treatment Performed - Cement Squeeze |
1978-04-19 | Perforation Treatment Performed - Cement Squeeze |
1978-04-20 | Perforation Treatment Performed - Acid Wash - No Pressure |
1978-04-20 | Perforation Treatment Performed - Cement Squeeze |
1978-05-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1981-09-02 | Perforation Treatment Performed - Jet Perforation |
1981-09-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1981-09-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1982-05-17 | Perforation Treatment Performed - Cement Squeeze |
1982-05-22 | Perforation Treatment Performed - Cement Squeeze |
1982-05-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1982-05-25 | Perforation Treatment Performed - Jet Perforation |
1982-05-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1982-05-28 | Perforation Treatment Performed - Cement Squeeze |
1982-06-03 | Perforation Treatment Performed - Jet Perforation |
1987-03-31 | Perforation Treatment Performed - Jet Perforation |
1987-04-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1987-04-28 | Perforation Treatment Performed - Cement Squeeze |
1987-04-28 | Plug Back Performed |
1987-05-02 | Perforation Treatment Performed - Jet Perforation |
1987-05-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1987-05-08 | Perforation Treatment Performed - Cement Squeeze |
1992-05-20 | Perforation Treatment Performed - Cement Squeeze |
1992-05-23 | Well Log Performed |
1992-05-25 | Perforation Treatment Performed - Jet Perforation |
1992-05-25 | Well Log Performed |
1992-05-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1992-05-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1992-05-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1992-05-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1992-05-31 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1992-06-02 | Well Log Performed |
1992-06-14 | Well Fluid changed to Crude Oil |
1992-06-14 | Well Mode changed to Flowing |
1995-01-25 | Well Fluid changed to Crude Oil |
1995-01-25 | Well Mode changed to Pumping |
1995-04-02 | Well Log Performed |
1995-04-03 | Perforation Treatment Performed - Jet Perforation |
1995-04-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1995-04-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1996-02-21 | Well Log Performed |
1999-05-12 | Perforation Treatment Performed - Jet Perforation |
1999-05-12 | Well Log Performed |
1999-05-16 | Perforation Treatment Performed - Cement Squeeze |
2014-09-02 | Well Type changed to Observation |
2017-03-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2017-03-10 | Well Mode changed to Suspended |
2017-03-10 | Well Type changed to Observation |
2017-03-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2017-03-12 | Well Log Performed |
2017-03-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2017-03-13 | Perforation Treatment Performed - Jet Perforation |
2017-03-13 | Well Log Performed |
2017-03-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2017-03-22 | Perforation Treatment Performed - Remedial Casing |
2017-03-23 | Perforation Treatment Performed - Jet Perforation |
2017-03-23 | Well Log Performed |
2017-03-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2017-03-25 | Perforation Treatment Performed - Remedial Casing |
2017-09-14 | Well Log Performed |
2017-09-16 | Well Log Performed |
2017-09-19 | Well Log Performed |
2017-09-22 | Well Log Performed |
2018-06-23 | Well Log Performed |
2018-06-24 | Perforation Treatment Performed - Jet Perforation |
2018-06-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2018-06-26 | Perforation Treatment Performed - Cement Plug |
2018-06-26 | Perforation Treatment Performed - Jet Perforation |
2018-06-26 | Perforation Treatment Performed - Remedial Casing |
2018-07-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2018-07-01 | Perforation Treatment Performed - Cement Plug |
2018-07-01 | Perforation Treatment Performed - Remedial Casing |
2018-07-02 | Perforation Treatment Performed - Jet Perforation |
2018-07-02 | Well Log Performed |
2018-07-06 | Perforation Treatment Performed - Cement Plug |
2018-07-07 | Perforation Treatment Performed - Jet Perforation |
2018-07-07 | Well Log Performed |
2018-07-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2018-07-08 | Perforation Treatment Performed - Cement Plug |
2018-07-08 | Perforation Treatment Performed - Remedial Casing |
2018-07-09 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1966-12-07 | Perforation | 1956.80 | 1959.90 | 7 |
1978-04-15 | Perforation | 1821.20 | 1823.60 | 7 |
1978-04-18 | Cement Squeeze | 1956.80 | 1959.90 | 0 |
1978-04-19 | Cement Squeeze | 1877.60 | 1895.90 | 0 |
1978-04-20 | Acid Wash | 1821.20 | 1823.60 | 0 |
1978-04-20 | Cement Squeeze | 1821.20 | 1823.60 | 0 |
1978-05-06 | Acid Treatment | 2039.10 | 2046.40 | 0 |
1981-09-02 | Perforation | 1889.70 | 1895.90 | 13 |
1981-09-03 | Acid Treatment | 1889.70 | 1895.90 | 0 |
1981-09-04 | Acid Treatment | 1889.70 | 1895.90 | 0 |
1982-05-17 | Cement Squeeze | 1821.20 | 1823.60 | 0 |
1966-12-07 | Acid Treatment | 1956.80 | 1959.90 | 0 |
1982-05-22 | Cement Squeeze | 1889.70 | 1895.90 | 0 |
1982-05-25 | Perforation | 1889.70 | 1895.90 | 13 |
1982-05-25 | Acid Treatment | 1889.70 | 1895.90 | 0 |
1982-05-27 | Packing Device Capped w/Cement | 2014.50 | 2026.00 | 0 |
1982-05-28 | Cement Squeeze | 1889.70 | 1895.90 | 0 |
1982-06-03 | Perforation | 1889.80 | 1896.00 | 13 |
1982-06-03 | Perforation | 1886.00 | 1889.80 | 13 |
1987-03-31 | Perforation | 1778.80 | 1786.10 | 13 |
1987-04-02 | Acid Treatment | 1778.80 | 1786.10 | 0 |
1987-04-28 | Cement Squeeze | 1778.80 | 1786.10 | 0 |
1966-12-20 | Perforation | 1892.80 | 1895.90 | 7 |
1987-05-02 | Perforation | 1871.50 | 1880.60 | 13 |
1987-05-03 | Acid Treatment | 1871.50 | 1880.60 | 0 |
1987-05-08 | Cement Squeeze | 1778.80 | 1786.10 | 0 |
1992-05-20 | Cement Squeeze | 1871.50 | 1896.00 | 0 |
1992-05-25 | Perforation | 1816.50 | 1819.50 | 13 |
1992-05-25 | Perforation | 1823.50 | 1826.50 | 13 |
1992-05-25 | Perforation | 1919.00 | 1922.00 | 13 |
1992-05-25 | Perforation | 1959.80 | 1962.80 | 13 |
1992-05-26 | Acid Treatment | 1816.50 | 1922.00 | 0 |
1992-05-27 | Acid Treatment | 1919.00 | 1922.00 | 0 |
1966-12-21 | Acid Treatment | 1892.80 | 1895.90 | 0 |
1992-05-28 | Acid Treatment | 1816.50 | 1826.50 | 0 |
1992-05-29 | Acid Treatment | 1816.50 | 1819.50 | 0 |
1992-05-31 | Acid Treatment | 1959.80 | 1962.80 | 0 |
1995-04-03 | Perforation | 1811.50 | 1813.50 | 13 |
1995-04-03 | Perforation | 1814.50 | 1815.50 | 13 |
1995-04-04 | Acid Treatment | 1814.50 | 1815.50 | 0 |
1995-04-05 | Acid Treatment | 1811.50 | 1815.50 | 0 |
1999-05-12 | Perforation | 419.00 | 419.50 | 13 |
1999-05-16 | Cement Squeeze | 419.00 | 419.50 | 0 |
2017-03-10 | Packing Device Capped w/Cement | 1795.50 | 1803.50 | 0 |
1967-06-04 | Perforation | 1877.60 | 1879.40 | 7 |
2017-03-11 | Packing Device Capped w/Cement | 1735.00 | 1743.00 | 0 |
2017-03-13 | Packing Device Capped w/Cement | 1685.00 | 1693.00 | 0 |
2017-03-13 | Perforation | 1060.60 | 1063.60 | 17 |
2017-03-13 | Perforation | 918.30 | 921.30 | 17 |
2017-03-22 | Remedial Casing Cementing | 1060.60 | 1063.60 | 0 |
2017-03-22 | Remedial Casing Cementing | 918.30 | 921.30 | 0 |
2017-03-22 | Packing Device Capped w/Cement | 905.40 | 915.40 | 0 |
2017-03-23 | Perforation | 712.50 | 715.50 | 17 |
2017-03-25 | Remedial Casing Cementing | 712.50 | 715.50 | 0 |
2017-03-25 | Packing Device Capped w/Cement | 689.00 | 708.20 | 0 |
1967-06-04 | Acid Treatment | 1877.60 | 1879.40 | 0 |
2018-06-24 | Perforation | 589.00 | 592.00 | 20 |
2018-06-24 | Perforation | 589.00 | 592.00 | 17 |
2018-06-26 | Remedial Casing Cementing | 589.00 | 592.00 | 0 |
2018-06-26 | Cement Plug | 583.70 | 592.00 | 0 |
2018-06-26 | Packing Device Capped w/Cement | 575.70 | 583.70 | 0 |
2018-06-26 | Perforation | 458.00 | 461.00 | 20 |
2018-06-26 | Perforation | 458.00 | 461.00 | 17 |
2018-07-01 | Remedial Casing Cementing | 458.00 | 461.00 | 0 |
2018-07-01 | Cement Plug | 453.00 | 461.00 | 0 |
2018-07-01 | Packing Device Capped w/Cement | 445.00 | 453.00 | 0 |
1967-06-04 | Acid Treatment | 1877.60 | 1879.40 | 0 |
2018-07-02 | Perforation | 418.00 | 421.00 | 20 |
2018-07-02 | Perforation | 418.00 | 421.00 | 17 |
2018-07-06 | Cement Plug | 399.50 | 440.00 | 0 |
2018-07-07 | Perforation | 342.00 | 345.00 | 20 |
2018-07-08 | Remedial Casing Cementing | 342.00 | 345.00 | 0 |
2018-07-08 | Cement Plug | 338.00 | 345.00 | 0 |
2018-07-08 | Packing Device Capped w/Cement | 326.00 | 338.00 | 0 |
1971-12-14 | Cement Squeeze | 1877.60 | 1959.90 | 0 |
1971-12-15 | Perforation | 2039.10 | 2046.40 | 7 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 403 | 0.0 | 0.0 | 0.0 |
1968 | 3181 | 0.0 | 0.0 | 0.0 |
1969 | 2260 | 0.0 | 0.0 | 0.0 |
1970 | 3814 | 0.0 | 0.0 | 0.0 |
1971 | 2845 | 0.0 | 0.0 | 0.0 |
1972 | 0 | 0.0 | 0.0 | 0.0 |
1973 | 0 | 0.0 | 0.0 | 0.0 |
1974 | 0 | 0.0 | 0.0 | 0.0 |
1975 | 0 | 0.0 | 0.0 | 0.0 |
1976 | 0 | 0.0 | 0.0 | 0.0 |
1977 | 0 | 0.0 | 0.0 | 0.0 |
1978 | 0 | 0.0 | 0.0 | 0.0 |
1979 | 0 | 0.0 | 0.0 | 0.0 |
1980 | 0 | 0.0 | 0.0 | 0.0 |
1981 | 0 | 0.0 | 0.0 | 0.0 |
1982 | 0 | 0.0 | 0.0 | 0.0 |
1983 | 0 | 0.0 | 0.0 | 0.0 |
1984 | 0 | 0.0 | 0.0 | 0.0 |
1985 | 0 | 0.0 | 0.0 | 0.0 |
1986 | 0 | 0.0 | 0.0 | 0.0 |
1987 | 0 | 0.0 | 0.0 | 0.0 |
1988 | 0 | 0.0 | 0.0 | 0.0 |
1989 | 0 | 0.0 | 0.0 | 0.0 |
1990 | 0 | 0.0 | 0.0 | 0.0 |
1991 | 0 | 0.0 | 0.0 | 0.0 |
1992 | 3646 | 0.0 | 0.0 | 0.0 |
1993 | 7324 | 0.0 | 0.0 | 0.0 |
1994 | 6375 | 0.0 | 0.0 | 0.0 |
1995 | 6969 | 0.0 | 0.0 | 0.0 |
1996 | 8743 | 0.0 | 0.0 | 0.0 |
1997 | 8682 | 0.0 | 0.0 | 0.0 |
1998 | 8388 | 0.0 | 0.0 | 0.0 |
1999 | 6524 | 0.0 | 0.0 | 0.0 |
2000 | 7057 | 0.0 | 0.0 | 0.0 |
2001 | 8468 | 0.0 | 0.0 | 0.0 |
2002 | 7748 | 0.0 | 0.0 | 0.0 |
2003 | 8726 | 0.0 | 0.0 | 0.0 |
2004 | 7360 | 0.0 | 0.0 | 0.0 |
2005 | 8729 | 0.0 | 0.0 | 0.0 |
2006 | 8010 | 0.0 | 0.0 | 0.0 |
2007 | 8163 | 0.0 | 0.0 | 0.0 |
2008 | 8255 | 0.0 | 0.0 | 0.0 |
2009 | 6532 | 0.0 | 0.0 | 0.0 |
2010 | 8680 | 0.0 | 0.0 | 0.0 |
2011 | 3906 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-03-26 | No Incident Encountered | 0.00 | 0.00 |
2018-07-11 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]