X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1086092702000

Well Details

Well ID: 1086092702000
Loading map...
Location: 00/02-27-108-09W6/0
Location Alias: 00/02-27-08-09 W6M
Location Alias 2: 00/02-27-108-09 W6/00
Country: Canada
Province: Alberta
Township: 108
Meridian: 6
Range: 09
Section: 27
County/Municipality: Mackenzie County
Well Name: HUSKY MOBIL RAINBOW 2-27-108-9
Operator Name: Husky Oil Operations Limited
License Number: 0031087
License Date: 1966-10-03
License Status: Suspension
Spud Date: 1966-10-08
Final Drill Date: 1966-11-13
Well Total Depth: 2118.40 m
Surface Hole Latitude: 58.399883
Surface Hole Longitude: -119.406233

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-10-03 Obtained License
1966-10-25 Drill Stem Test Performed
1966-10-26 Drill Stem Test Performed
1966-10-28 Drill Stem Test Performed
1966-11-02 Drill Stem Test Performed
1966-11-09 Drill Stem Test Performed
1966-11-13 Finished Drilling
1966-11-13 Well Mode changed to Drilled and Cased
1966-11-16 Drill Stem Test Performed
1966-11-18 Liner Casing Operation Performed
1966-12-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-12-07 Perforation Treatment Performed - Jet Perforation
1966-12-20 Perforation Treatment Performed - Jet Perforation
1966-12-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-12-23 Well Began Production
1966-12-23 Well Fluid changed to Crude Oil
1966-12-23 Well Mode changed to Flowing
1967-06-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-06-04 Perforation Treatment Performed - Jet Perforation
1971-12-14 Perforation Treatment Performed - Cement Squeeze
1971-12-15 Perforation Treatment Performed - Jet Perforation
1971-12-22 Well Began Injection
1971-12-22 Well Fluid changed to Water
1971-12-22 Well Type changed to Injection
1978-04-15 Perforation Treatment Performed - Jet Perforation
1978-04-18 Perforation Treatment Performed - Cement Squeeze
1978-04-19 Perforation Treatment Performed - Cement Squeeze
1978-04-20 Perforation Treatment Performed - Acid Wash - No Pressure
1978-04-20 Perforation Treatment Performed - Cement Squeeze
1978-05-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-09-02 Perforation Treatment Performed - Jet Perforation
1981-09-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-09-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-05-17 Perforation Treatment Performed - Cement Squeeze
1982-05-22 Perforation Treatment Performed - Cement Squeeze
1982-05-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-05-25 Perforation Treatment Performed - Jet Perforation
1982-05-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-05-28 Perforation Treatment Performed - Cement Squeeze
1982-06-03 Perforation Treatment Performed - Jet Perforation
1987-03-31 Perforation Treatment Performed - Jet Perforation
1987-04-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-04-28 Perforation Treatment Performed - Cement Squeeze
1987-04-28 Plug Back Performed
1987-05-02 Perforation Treatment Performed - Jet Perforation
1987-05-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-05-08 Perforation Treatment Performed - Cement Squeeze
1992-05-20 Perforation Treatment Performed - Cement Squeeze
1992-05-23 Well Log Performed
1992-05-25 Perforation Treatment Performed - Jet Perforation
1992-05-25 Well Log Performed
1992-05-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-05-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-05-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-05-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-05-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-06-02 Well Log Performed
1992-06-14 Well Fluid changed to Crude Oil
1992-06-14 Well Mode changed to Flowing
1995-01-25 Well Fluid changed to Crude Oil
1995-01-25 Well Mode changed to Pumping
1995-04-02 Well Log Performed
1995-04-03 Perforation Treatment Performed - Jet Perforation
1995-04-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-04-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-02-21 Well Log Performed
1999-05-12 Perforation Treatment Performed - Jet Perforation
1999-05-12 Well Log Performed
1999-05-16 Perforation Treatment Performed - Cement Squeeze
2014-09-02 Well Type changed to Observation
2017-03-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-03-10 Well Mode changed to Suspended
2017-03-10 Well Type changed to Observation
2017-03-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-03-12 Well Log Performed
2017-03-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-03-13 Perforation Treatment Performed - Jet Perforation
2017-03-13 Well Log Performed
2017-03-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-03-22 Perforation Treatment Performed - Remedial Casing
2017-03-23 Perforation Treatment Performed - Jet Perforation
2017-03-23 Well Log Performed
2017-03-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-03-25 Perforation Treatment Performed - Remedial Casing
2017-09-14 Well Log Performed
2017-09-16 Well Log Performed
2017-09-19 Well Log Performed
2017-09-22 Well Log Performed
2018-06-23 Well Log Performed
2018-06-24 Perforation Treatment Performed - Jet Perforation
2018-06-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-06-26 Perforation Treatment Performed - Cement Plug
2018-06-26 Perforation Treatment Performed - Jet Perforation
2018-06-26 Perforation Treatment Performed - Remedial Casing
2018-07-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-07-01 Perforation Treatment Performed - Cement Plug
2018-07-01 Perforation Treatment Performed - Remedial Casing
2018-07-02 Perforation Treatment Performed - Jet Perforation
2018-07-02 Well Log Performed
2018-07-06 Perforation Treatment Performed - Cement Plug
2018-07-07 Perforation Treatment Performed - Jet Perforation
2018-07-07 Well Log Performed
2018-07-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-07-08 Perforation Treatment Performed - Cement Plug
2018-07-08 Perforation Treatment Performed - Remedial Casing
2018-07-09 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-12-07 Perforation 1956.80 1959.90 7
1978-04-15 Perforation 1821.20 1823.60 7
1978-04-18 Cement Squeeze 1956.80 1959.90 0
1978-04-19 Cement Squeeze 1877.60 1895.90 0
1978-04-20 Acid Wash 1821.20 1823.60 0
1978-04-20 Cement Squeeze 1821.20 1823.60 0
1978-05-06 Acid Treatment 2039.10 2046.40 0
1981-09-02 Perforation 1889.70 1895.90 13
1981-09-03 Acid Treatment 1889.70 1895.90 0
1981-09-04 Acid Treatment 1889.70 1895.90 0
1982-05-17 Cement Squeeze 1821.20 1823.60 0
1966-12-07 Acid Treatment 1956.80 1959.90 0
1982-05-22 Cement Squeeze 1889.70 1895.90 0
1982-05-25 Perforation 1889.70 1895.90 13
1982-05-25 Acid Treatment 1889.70 1895.90 0
1982-05-27 Packing Device Capped w/Cement 2014.50 2026.00 0
1982-05-28 Cement Squeeze 1889.70 1895.90 0
1982-06-03 Perforation 1889.80 1896.00 13
1982-06-03 Perforation 1886.00 1889.80 13
1987-03-31 Perforation 1778.80 1786.10 13
1987-04-02 Acid Treatment 1778.80 1786.10 0
1987-04-28 Cement Squeeze 1778.80 1786.10 0
1966-12-20 Perforation 1892.80 1895.90 7
1987-05-02 Perforation 1871.50 1880.60 13
1987-05-03 Acid Treatment 1871.50 1880.60 0
1987-05-08 Cement Squeeze 1778.80 1786.10 0
1992-05-20 Cement Squeeze 1871.50 1896.00 0
1992-05-25 Perforation 1816.50 1819.50 13
1992-05-25 Perforation 1823.50 1826.50 13
1992-05-25 Perforation 1919.00 1922.00 13
1992-05-25 Perforation 1959.80 1962.80 13
1992-05-26 Acid Treatment 1816.50 1922.00 0
1992-05-27 Acid Treatment 1919.00 1922.00 0
1966-12-21 Acid Treatment 1892.80 1895.90 0
1992-05-28 Acid Treatment 1816.50 1826.50 0
1992-05-29 Acid Treatment 1816.50 1819.50 0
1992-05-31 Acid Treatment 1959.80 1962.80 0
1995-04-03 Perforation 1811.50 1813.50 13
1995-04-03 Perforation 1814.50 1815.50 13
1995-04-04 Acid Treatment 1814.50 1815.50 0
1995-04-05 Acid Treatment 1811.50 1815.50 0
1999-05-12 Perforation 419.00 419.50 13
1999-05-16 Cement Squeeze 419.00 419.50 0
2017-03-10 Packing Device Capped w/Cement 1795.50 1803.50 0
1967-06-04 Perforation 1877.60 1879.40 7
2017-03-11 Packing Device Capped w/Cement 1735.00 1743.00 0
2017-03-13 Packing Device Capped w/Cement 1685.00 1693.00 0
2017-03-13 Perforation 1060.60 1063.60 17
2017-03-13 Perforation 918.30 921.30 17
2017-03-22 Remedial Casing Cementing 1060.60 1063.60 0
2017-03-22 Remedial Casing Cementing 918.30 921.30 0
2017-03-22 Packing Device Capped w/Cement 905.40 915.40 0
2017-03-23 Perforation 712.50 715.50 17
2017-03-25 Remedial Casing Cementing 712.50 715.50 0
2017-03-25 Packing Device Capped w/Cement 689.00 708.20 0
1967-06-04 Acid Treatment 1877.60 1879.40 0
2018-06-24 Perforation 589.00 592.00 20
2018-06-24 Perforation 589.00 592.00 17
2018-06-26 Remedial Casing Cementing 589.00 592.00 0
2018-06-26 Cement Plug 583.70 592.00 0
2018-06-26 Packing Device Capped w/Cement 575.70 583.70 0
2018-06-26 Perforation 458.00 461.00 20
2018-06-26 Perforation 458.00 461.00 17
2018-07-01 Remedial Casing Cementing 458.00 461.00 0
2018-07-01 Cement Plug 453.00 461.00 0
2018-07-01 Packing Device Capped w/Cement 445.00 453.00 0
1967-06-04 Acid Treatment 1877.60 1879.40 0
2018-07-02 Perforation 418.00 421.00 20
2018-07-02 Perforation 418.00 421.00 17
2018-07-06 Cement Plug 399.50 440.00 0
2018-07-07 Perforation 342.00 345.00 20
2018-07-08 Remedial Casing Cementing 342.00 345.00 0
2018-07-08 Cement Plug 338.00 345.00 0
2018-07-08 Packing Device Capped w/Cement 326.00 338.00 0
1971-12-14 Cement Squeeze 1877.60 1959.90 0
1971-12-15 Perforation 2039.10 2046.40 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1966 0 0.0 0.0 0.0
1967 403 0.0 0.0 0.0
1968 3181 0.0 0.0 0.0
1969 2260 0.0 0.0 0.0
1970 3814 0.0 0.0 0.0
1971 2845 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 3646 0.0 0.0 0.0
1993 7324 0.0 0.0 0.0
1994 6375 0.0 0.0 0.0
1995 6969 0.0 0.0 0.0
1996 8743 0.0 0.0 0.0
1997 8682 0.0 0.0 0.0
1998 8388 0.0 0.0 0.0
1999 6524 0.0 0.0 0.0
2000 7057 0.0 0.0 0.0
2001 8468 0.0 0.0 0.0
2002 7748 0.0 0.0 0.0
2003 8726 0.0 0.0 0.0
2004 7360 0.0 0.0 0.0
2005 8729 0.0 0.0 0.0
2006 8010 0.0 0.0 0.0
2007 8163 0.0 0.0 0.0
2008 8255 0.0 0.0 0.0
2009 6532 0.0 0.0 0.0
2010 8680 0.0 0.0 0.0
2011 3906 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-03-26 No Incident Encountered 0.00 0.00
2018-07-11 No Incident Encountered 0.00 0.00

For data sources see[6]

References