X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1086092215030

Well Details

Well ID: 1086092215030
Loading map...
Location: 03/15-22-108-09W6/0
Location Alias: 03/15-22-08-09 W6M
Location Alias 2: 03/15-22-108-09 W6/00
Country: Canada
Province: Alberta
Township: 108
Meridian: 6
Range: 09
Section: 22
County/Municipality: Mackenzie County
Well Name: HUSKY MOBIL RAINBOW 15-22-108-9
Operator Name: Husky Oil Operations Limited
License Number: 0147973
License Date: 1991-02-14
License Status: Suspension
Spud Date: 1991-02-17
Final Drill Date: 1991-03-09
Well Total Depth: 2015.00 m
Surface Hole Latitude: 58.398761
Surface Hole Longitude: -119.403110

For data sources see[1][2]

Well History

Date Event
1991-02-14 Obtained License
1991-02-17 Lost Circulation Occurred
1991-02-18 Surface Casing Operation Performed
1991-02-26 Direction Drilling Operation Performed - Deviate
1991-03-04 Well Log Performed
1991-03-06 Intermediate Casing Operation Performed
1991-03-09 Finished Drilling
1991-03-09 Lost Circulation Occurred
1991-03-09 Well Mode changed to Drilled and Cased
1991-03-10 Well Log Performed
1991-03-11 Liner Casing Operation Performed
1991-03-12 Rig Released
1991-03-13 Well Log Performed
1991-03-23 Perforation Treatment Performed - Jet Perforation
1991-03-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-03-26 Perforation Treatment Performed - Jet Perforation
1991-03-29 Perforation Treatment Performed - Cement Squeeze
1991-04-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-04-01 Perforation Treatment Performed - Cement Squeeze
1991-04-04 Perforation Treatment Performed - Jet Perforation
1991-04-07 Perforation Treatment Performed - Jet Perforation
1991-04-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-04-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-04-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-04-17 Perforation Treatment Performed - Cement Squeeze
1991-04-20 Perforation Treatment Performed - Jet Perforation
1991-04-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-05-16 Well Began Production
1991-05-16 Well Fluid changed to Crude Oil
1991-05-16 Well Mode changed to Pumping
1995-06-10 Perforation Treatment Performed - Jet Perforation
1995-06-10 Well Log Performed
1995-06-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-06-13 Well Log Performed
2004-08-15 Perforation Treatment Performed - Jet Perforation
2004-08-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-08-21 Well Log Performed
2004-08-22 Well Log Performed
2005-03-04 Well Began Injection
2005-03-04 Well Fluid changed to Water
2005-03-04 Well Type changed to Injection
2006-07-11 Well Log Performed
2008-10-03 Well Log Performed
2015-07-21 Well Fluid changed to Water
2015-07-21 Well Mode changed to Suspended
2015-07-21 Well Type changed to Injection

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1991-02-26 1500.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1991-03-23 Perforation 1952.00 1953.00 13
1991-04-01 Cement Squeeze 1884.00 1889.00 0
1991-04-04 Perforation 1869.00 1874.00 13
1991-04-04 Perforation 1884.00 1886.00 13
1991-04-07 Perforation 1835.00 1839.50 13
1991-04-07 Perforation 1850.50 1856.00 13
1991-04-09 Acid Treatment 1850.50 1856.00 0
1991-04-10 Acid Treatment 1835.00 1839.50 0
1991-04-16 Acid Treatment 1835.00 1839.50 0
1991-04-17 Cement Squeeze 1835.00 1839.50 0
1991-04-20 Perforation 1835.00 1839.50 13
1991-03-23 Perforation 1956.00 1958.00 13
1991-04-21 Acid Treatment 1835.00 1839.50 0
1995-06-10 Perforation 1823.00 1824.50 13
1995-06-10 Perforation 1827.00 1831.00 13
1995-06-11 Acid Treatment 1823.00 1831.00 0
2004-08-15 Perforation 1988.50 1994.50 13
2004-08-17 Acid Treatment 1988.50 1994.50 0
1991-03-24 Acid Treatment 1952.00 1958.00 0
1991-03-26 Perforation 1835.00 1839.50 13
1991-03-26 Perforation 1850.50 1856.00 13
1991-03-26 Perforation 1869.00 1874.00 13
1991-03-26 Perforation 1884.00 1889.00 13
1991-03-29 Cement Squeeze 1835.00 1889.00 0
1991-04-01 Acid Treatment 1884.00 1889.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 3815 0.0 0.0 0.0
1992 7995 0.0 0.0 0.0
1993 2516 0.0 0.0 0.0
1994 48 0.0 0.0 0.0
1995 3168 0.0 0.0 0.0
1996 5184 0.0 0.0 0.0
1997 7284 0.0 0.0 0.0
1998 7712 0.0 0.0 0.0
1999 1612 0.0 0.0 0.0
2000 72 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1991-02-17 Lost Circulation 99.00 99.00
1991-03-09 Lost Circulation 2015.00 2015.00

For data sources see[7]

References