X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1086082913004

Well Details

Well ID: 1086082913004
Loading map...
Location: 00/13-29-108-08W6/4
Location Alias: 00/13-29-08-08 W6M
Location Alias 2: 00/13-29-108-08 W6/04
Country: Canada
Province: Alberta
Township: 108
Meridian: 6
Range: 08
Section: 29
County/Municipality: Mackenzie County
Well Name: HUSKY MOBIL RAIN 13-29-108-8
Operator Name: Husky Oil Operations Limited
License Number: 0042129
License Date: 1972-02-16
License Status: Suspension
Spud Date: 1972-03-10
Final Drill Date: 1994-11-11
Well Total Depth: 2455.00 m
Surface Hole Latitude: 58.407429
Surface Hole Longitude: -119.301530

For data sources see[1][2]

Well History

Date Event
1972-02-16 Obtained License
1994-10-05 Well Log Performed
1994-10-06 Well Log Performed
1994-11-01 Direction Drilling Operation Performed - Horizontal
1994-11-11 Finished Drilling
1994-11-11 Well Log Performed
1994-11-11 Well Mode changed to Drilled and Cased
1994-11-15 Liner Casing Operation Performed
1994-11-15 Perforation Treatment Performed - Open-Hole Completion
1994-11-16 Rig Released
1994-11-22 Well Log Performed
1994-12-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-12-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-01-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-01-13 Perforation Treatment Performed - Jet Perforation
1995-01-13 Well Log Performed
1995-01-14 Perforation Treatment Performed - Jet Perforation
1995-01-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-01-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-01-21 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-03-25 Perforation Treatment Performed - Jet Perforation
2002-03-25 Well Log Performed
2002-03-29 Well Log Performed
2005-05-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-05-14 Plug Back Performed
2005-05-15 Perforation Treatment Performed - Jet Perforation
2005-05-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-05-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-05-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-05-21 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1994-11-01 1780.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-11-15 Open Hole/Barefoot Completion 2172.00 2455.00 0
1995-01-19 Acid Treatment 2025.00 2031.00 0
1995-01-21 Acid Treatment 2172.00 2455.00 0
2002-03-25 Perforation 2001.00 2006.00 13
2002-03-25 Perforation 1984.00 1988.00 13
2002-03-25 Perforation 1967.00 1976.00 13
2005-05-14 Packing Device Capped w/Cement 1941.00 1949.00 0
2005-05-15 Perforation 1734.50 1736.00 13
2005-05-15 Perforation 1667.00 1675.00 13
2005-05-17 Acid Treatment 1734.50 1736.00 0
2005-05-18 Acid Treatment 1734.50 1736.00 0
1994-12-18 Acid Treatment 2412.40 2455.00 0
2005-05-19 Acid Treatment 1667.00 1675.00 0
2005-05-19 Acid Treatment 1667.00 1675.00 0
2005-05-21 Acid Treatment 1734.50 1736.00 0
1994-12-21 Acid Treatment 2380.00 2405.00 0
1995-01-10 Acid Treatment 2172.00 2455.00 0
1995-01-13 Perforation 2137.00 2139.00 20
1995-01-13 Perforation 2036.00 2040.00 20
1995-01-14 Perforation 2025.00 2031.00 20
1995-01-17 Acid Treatment 2137.00 2139.00 0
1995-01-19 Acid Treatment 2036.00 2040.00 0

For data sources see[5]



References