X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1086082911030

Well Details

Well ID: 1086082911030
Loading map...
Location: 03/11-29-108-08W6/0
Location Alias: 03/11-29-08-08 W6M
Location Alias 2: 03/11-29-108-08 W6/00
Country: Canada
Province: Alberta
Township: 108
Meridian: 6
Range: 08
Section: 29
County/Municipality: Mackenzie County
Well Name: HUSKY MOBIL RAINBOW 11-29-108-8
Operator Name: Husky Oil Operations Limited
License Number: 0145682
License Date: 1990-10-03
License Status: Suspension
Spud Date: 1990-10-13
Final Drill Date: 1990-11-21
Well Total Depth: 2718.00 m
Surface Hole Latitude: 58.405769
Surface Hole Longitude: -119.311890

For data sources see[1][2]

Well History

Date Event
1990-10-03 Obtained License
1990-10-17 Surface Casing Operation Performed
1990-10-27 Direction Drilling Operation Performed - Horizontal
1990-11-02 Well Log Performed
1990-11-05 Production Casing Operation Performed
1990-11-06 Well Log Performed
1990-11-21 Finished Drilling
1990-11-21 Perforation Treatment Performed - Open-Hole Completion
1990-11-21 Well Mode changed to Drilled and Cased
1990-11-23 Well Log Performed
1990-11-26 Well Log Performed
1990-11-28 Rig Released
1990-11-28 Well Log Performed
1990-12-04 Perforation Treatment Performed - Jet Perforation
1990-12-13 Perforation Treatment Performed - Acid Wash - No Pressure
1990-12-13 Perforation Treatment Performed - Cement Squeeze
1990-12-19 Perforation Treatment Performed - Cement Squeeze
1991-01-10 Perforation Treatment Performed - Acid Wash - No Pressure
1991-01-11 Well Began Production
1991-01-11 Well Fluid changed to Crude Oil
1991-01-11 Well Mode changed to Flowing
1991-10-14 Perforation Treatment Performed - Chemical Squeeze
1991-10-15 Perforation Treatment Performed - Chemical Squeeze
1992-03-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-03-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-03-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-03-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-03-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-03-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-03-01 Perforation Treatment Performed - Jet Perforation
1994-03-01 Well Log Performed
1994-03-03 Perforation Treatment Performed - Jet Perforation
1994-03-03 Well Log Performed
1994-03-10 Well Log Performed
1994-03-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-03-19 Well Log Performed
2004-01-20 Well Fluid changed to Crude Oil
2004-01-20 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1990-10-27 1862.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-11-21 Open Hole/Barefoot Completion 2086.00 2718.00 0
1992-03-09 Acid Treatment 2655.00 2680.00 0
1992-03-10 Acid Treatment 2685.00 2710.00 0
1992-03-10 Acid Treatment 2621.00 2646.00 0
1992-03-10 Acid Treatment 2507.00 2532.00 0
1992-03-10 Acid Treatment 2454.00 2479.00 0
1992-03-10 Acid Treatment 2324.00 2349.00 0
1992-03-11 Acid Treatment 2252.00 2277.00 0
1992-03-13 Acid Treatment 2090.00 2115.00 0
1992-03-13 Acid Treatment 2117.00 2142.00 0
1992-03-14 Acid Treatment 2117.00 2142.00 0
1990-12-04 Perforation 425.00 427.00 13
1992-03-14 Acid Treatment 2143.00 2168.00 0
1992-03-14 Acid Treatment 2169.00 2194.00 0
1992-03-14 Acid Treatment 2198.00 2223.00 0
1992-03-15 Acid Treatment 2225.00 2250.00 0
1992-03-15 Acid Treatment 2252.00 2277.00 0
1994-03-01 Perforation 1955.00 1957.00 13
1994-03-03 Perforation 1959.00 1966.00 13
1994-03-03 Perforation 1969.00 1970.00 13
1994-03-03 Perforation 1978.00 1984.00 13
1994-03-03 Perforation 1987.00 1989.00 13
1990-12-04 Perforation 480.00 482.00 13
1994-03-12 Acid Treatment 1955.00 1989.00 0
1990-12-13 Acid Wash 425.00 482.00 0
1990-12-13 Cement Squeeze 480.00 482.00 0
1990-12-19 Cement Squeeze 425.00 427.00 0
1991-01-10 Acid Wash 2086.00 2718.00 0
1991-10-14 Chemical Squeeze 2086.00 2718.00 0
1991-10-15 Chemical Squeeze 2086.00 2718.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 7397 0.0 0.0 0.0
1992 7623 0.0 0.0 0.0
1993 7922 0.0 0.0 0.0
1994 7318 0.0 0.0 0.0
1995 7741 0.0 0.0 0.0
1996 7069 0.0 0.0 0.0
1997 3766 0.0 0.0 0.0
1998 7301 0.0 0.0 0.0
1999 8048 0.0 0.0 0.0
2000 1519 0.0 0.0 0.0
2001 1295 0.0 0.0 0.0

For data sources see[6]

References