If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 1086082711000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":58.407204,"lon":-119.245386,"icon":""}]} |
Location: 00/11-27-108-08W6/0 | |
Location Alias: 00/11-27-08-08 W6M | |
Location Alias 2: 00/11-27-108-08 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 108 | |
Meridian: 6 | |
Range: 08 | |
Section: 27 | |
County/Municipality: Mackenzie County | |
Well Name: HUSKY MOBIL RAINBOW WEST 11-27-108-8 | |
Operator Name: Husky Oil Operations Limited | |
License Number: 0028940 | |
License Date: 1965-09-10 | |
License Status: Issued | |
Spud Date: 1965-09-12 | |
Final Drill Date: 1965-10-15 | |
Well Total Depth: 1894.60 m | |
Surface Hole Latitude: 58.407204 | |
Surface Hole Longitude: -119.245386 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1965-09-10 | Obtained License |
1965-10-06 | Well Log Performed |
1965-10-07 | Drill Stem Test Performed |
1965-10-09 | Liner Casing Operation Performed |
1965-10-15 | Finished Drilling |
1965-10-19 | Drill Stem Test Performed |
1965-10-19 | Well Log Performed |
1965-10-20 | Drill Stem Test Performed |
1965-10-21 | Drill Stem Test Performed |
1965-10-27 | Perforation Treatment Performed - Jet Perforation |
1965-10-28 | Drill Stem Test Performed |
1965-10-29 | Drill Stem Test Performed |
1965-10-30 | Drill Stem Test Performed |
1965-10-30 | Perforation Treatment Performed - Jet Perforation |
1965-10-31 | Drill Stem Test Performed |
1965-10-31 | Perforation Treatment Performed - Jet Perforation |
1965-11-01 | Drill Stem Test Performed |
1965-11-01 | Perforation Treatment Performed - Jet Perforation |
1965-11-02 | Drill Stem Test Performed |
1965-11-03 | Drill Stem Test Performed |
1965-11-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1966-01-19 | Perforation Treatment Performed - Acid Wash - No Pressure |
1966-01-19 | Perforation Treatment Performed - Cement Plug |
1966-02-08 | Perforation Treatment Performed - Cement Plug |
1966-02-08 | Perforation Treatment Performed - Jet Perforation |
1966-02-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1966-03-10 | Perforation Treatment Performed - Jet Perforation |
1966-03-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1966-03-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1966-03-22 | Perforation Treatment Performed - Jet Perforation |
1966-08-15 | Well Mode changed to Drilled and Cased |
1968-10-08 | Well Began Production |
1968-10-08 | Well Fluid changed to Gas |
1968-10-08 | Well Mode changed to Flowing |
1975-11-06 | Perforation Treatment Performed - Cement Squeeze |
1975-11-06 | Perforation Treatment Performed - Jet Perforation |
1975-11-07 | Perforation Treatment Performed - Acid Wash - No Pressure |
1975-11-07 | Perforation Treatment Performed - Jet Perforation |
1975-11-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1975-11-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1982-07-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1987-03-01 | Well Fluid changed to Gas |
1987-03-01 | Well Mode changed to Suspended |
1987-09-14 | Well Fluid changed to Gas |
1987-09-14 | Well Mode changed to Flowing |
1991-03-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1991-03-19 | Perforation Treatment Performed - Jet Perforation |
1991-03-19 | Plug Back Performed |
1991-03-19 | Well Fluid changed to Gas |
1991-03-19 | Well Mode changed to Abandoned Zone |
1991-03-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1991-03-20 | Perforation Treatment Performed - Jet Perforation |
1991-03-21 | Perforation Treatment Performed - Jet Perforation |
1991-03-22 | Perforation Treatment Performed - Cement Squeeze |
1991-03-24 | Perforation Treatment Performed - Jet Perforation |
1991-03-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1991-03-25 | Perforation Treatment Performed - Cement Squeeze |
1991-03-27 | Perforation Treatment Performed - Jet Perforation |
1991-03-28 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1965-10-27 | Perforation | 1814.80 | 1817.20 | 7 |
1966-02-19 | Acid Treatment | 1757.80 | 1760.20 | 0 |
1966-03-10 | Perforation | 1742.80 | 1744.40 | 7 |
1966-03-11 | Acid Treatment | 1742.80 | 1744.40 | 0 |
1966-03-14 | Acid Treatment | 1742.80 | 1744.40 | 0 |
1966-03-22 | Perforation | 1768.80 | 1770.30 | 7 |
1975-11-06 | Cement Squeeze | 1794.70 | 1796.20 | 0 |
1975-11-06 | Perforation | 1756.30 | 1757.50 | 7 |
1975-11-07 | Perforation | 1709.30 | 1711.10 | 7 |
1975-11-07 | Perforation | 1790.40 | 1792.50 | 7 |
1975-11-07 | Acid Wash | 1756.30 | 1792.50 | 0 |
1965-10-30 | Perforation | 1805.90 | 1808.40 | 7 |
1975-11-08 | Acid Treatment | 1756.30 | 1792.50 | 0 |
1975-11-08 | Acid Treatment | 1742.80 | 1770.30 | 0 |
1975-11-09 | Acid Treatment | 1756.30 | 1792.50 | 0 |
1982-07-14 | Packing Device Capped w/Cement | 1787.00 | 1787.00 | 0 |
1991-03-19 | Packing Device Capped w/Cement | 1726.00 | 1734.00 | 0 |
1991-03-19 | Packing Device Capped w/Cement | 1682.00 | 1690.00 | 0 |
1991-03-19 | Perforation | 444.00 | 445.00 | 13 |
1991-03-20 | Perforation | 404.00 | 405.00 | 13 |
1991-03-20 | Acid Treatment | 404.00 | 405.00 | 0 |
1991-03-21 | Perforation | 433.00 | 434.00 | 13 |
1965-10-31 | Perforation | 1794.70 | 1796.20 | 7 |
1991-03-22 | Cement Squeeze | 404.50 | 445.00 | 0 |
1991-03-24 | Perforation | 415.00 | 416.00 | 13 |
1991-03-24 | Perforation | 432.00 | 434.00 | 13 |
1991-03-25 | Acid Treatment | 415.00 | 416.00 | 0 |
1991-03-25 | Cement Squeeze | 415.00 | 434.00 | 0 |
1991-03-27 | Perforation | 433.00 | 437.00 | 13 |
1991-03-28 | Fracture | 433.00 | 437.00 | 0 |
1965-11-01 | Perforation | 1768.80 | 1770.30 | 7 |
1965-11-05 | Packing Device Capped w/Cement | 1802.90 | 1802.90 | 0 |
1966-01-19 | Acid Wash | 1794.70 | 1796.20 | 0 |
1966-01-19 | Cement Plug | 1794.70 | 1796.20 | 0 |
1966-02-08 | Cement Plug | 1768.80 | 1770.30 | 0 |
1966-02-08 | Perforation | 1757.80 | 1760.20 | 7 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1968 | 425 | 0.0 | 0.0 | 0.0 |
1969 | 4185 | 0.0 | 0.0 | 0.0 |
1970 | 1574 | 0.0 | 0.0 | 0.0 |
1971 | 1407 | 0.0 | 0.0 | 0.0 |
1972 | 154 | 0.0 | 0.0 | 0.0 |
1973 | 2256 | 0.0 | 0.0 | 0.0 |
1974 | 7248 | 0.0 | 0.0 | 0.0 |
1975 | 3956 | 0.0 | 0.0 | 0.0 |
1976 | 2827 | 0.0 | 0.0 | 0.0 |
1977 | 2122 | 0.0 | 0.0 | 0.0 |
1978 | 1193 | 0.0 | 0.0 | 0.0 |
1979 | 2362 | 0.0 | 0.0 | 0.0 |
1981 | 1229 | 0.0 | 0.0 | 0.0 |
1982 | 174 | 0.0 | 0.0 | 0.0 |
1987 | 2539 | 0.0 | 0.0 | 0.0 |
1988 | 2310 | 0.0 | 0.0 | 0.0 |
For data sources see[5]