X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1086081704000

Well Details

Well ID: 1086081704000
Loading map...
Location: 00/04-17-108-08W6/0
Location Alias: 00/04-17-08-08 W6M
Location Alias 2: 00/04-17-108-08 W6/00
Country: Canada
Province: Alberta
Township: 108
Meridian: 6
Range: 08
Section: 17
County/Municipality: Mackenzie County
Well Name: HUSKY ET AL RAINBOW SOUTH 4-17-108-8
Operator Name: Husky Oil Operations Limited
License Number: 0119898
License Date: 1985-11-29
License Status: Amended
Spud Date: 1985-12-05
Final Drill Date: 1985-12-20
Well Total Depth: 1908.00 m
Surface Hole Latitude: 58.371269
Surface Hole Longitude: -119.305684

For data sources see[1][2]

Well History

Date Event
1985-11-29 Obtained License
1985-12-07 Surface Casing Operation Performed
1985-12-20 Finished Drilling
1985-12-20 Well Mode changed to Drilled and Cased
1985-12-21 Drill Stem Test Performed
1985-12-21 Well Log Performed
1985-12-22 Drill Stem Test Performed
1985-12-24 Production Casing Operation Performed
1985-12-24 Rig Released
1986-02-01 Well Log Performed
1986-02-02 Perforation Treatment Performed - Jet Perforation
1986-02-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-02-07 Well Log Performed
1986-02-08 Perforation Treatment Performed - Jet Perforation
1986-02-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-02-14 Well Log Performed
1986-02-15 Perforation Treatment Performed - Jet Perforation
1986-02-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-03-14 Well Began Production
1986-03-14 Well Fluid changed to Crude Oil
1986-03-14 Well Mode changed to Pumping
1987-12-14 Well Log Performed
1987-12-15 Perforation Treatment Performed - Jet Perforation
1987-12-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-09-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-02-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-02-06 Plug Back Performed
2003-02-06 Well Fluid changed to Crude Oil
2003-02-06 Well Log Performed
2003-02-06 Well Mode changed to Abandoned Zone
2006-11-17 Perforation Treatment Performed - Jet Perforation
2006-11-18 Well Log Performed
2006-11-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-11-21 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-11-24 Well Log Performed
2006-11-25 Perforation Treatment Performed - Cement Squeeze
2006-12-03 Perforation Treatment Performed - Jet Perforation
2006-12-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-12-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-12-11 Well Log Performed
2007-08-15 Well Began Injection
2007-08-15 Well Fluid changed to Water
2007-08-15 Well Type changed to Injection
2008-10-10 Well Log Performed
2012-10-29 Well Log Performed
2013-03-15 Perforation Treatment Performed - Jet Perforation
2013-03-15 Well Log Performed
2013-03-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-03-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-03-19 Well Log Performed
2013-03-20 Perforation Treatment Performed - Jet Perforation
2013-03-21 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-03-29 Well Log Performed
2016-09-27 Well Log Performed
2017-06-12 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-02-02 Perforation 1886.00 1889.00 13
1986-02-10 Acid Treatment 1810.50 1825.00 0
1986-02-15 Perforation 1796.60 1798.00 13
1986-02-15 Perforation 1798.20 1799.60 13
1986-02-15 Perforation 1801.70 1803.20 13
1986-02-17 Acid Treatment 1796.60 1803.20 0
1987-12-15 Perforation 1837.50 1842.50 13
1987-12-16 Acid Treatment 1837.50 1842.50 0
1990-09-15 Acid Treatment 1796.60 1889.00 0
2003-02-06 Packing Device Capped w/Cement 1782.00 1790.00 0
2006-11-17 Perforation 1886.00 1889.00 13
1986-02-02 Perforation 1871.00 1873.00 13
2006-11-17 Perforation 1871.00 1873.00 13
2006-11-17 Perforation 1837.50 1842.50 13
2006-11-17 Perforation 1823.00 1825.00 13
2006-11-17 Perforation 1817.00 1819.00 13
2006-11-17 Perforation 1813.00 1814.50 13
2006-11-17 Perforation 1810.50 1812.00 13
2006-11-17 Perforation 1801.70 1803.20 13
2006-11-17 Perforation 1798.20 1799.60 13
2006-11-17 Perforation 1796.60 1798.00 13
2006-11-20 Acid Treatment 1886.00 1889.00 0
1986-02-04 Acid Treatment 1871.00 1889.00 0
2006-11-20 Acid Treatment 1871.00 1873.00 0
2006-11-21 Acid Treatment 1796.60 1798.00 0
2006-11-21 Acid Treatment 1798.20 1799.60 0
2006-11-21 Acid Treatment 1801.70 1803.20 0
2006-11-25 Cement Squeeze 1796.60 1842.50 0
2006-12-03 Perforation 1801.70 1803.20 13
2006-12-03 Perforation 1796.60 1798.00 13
2006-12-03 Perforation 1798.20 1799.60 13
2006-12-05 Acid Treatment 1796.60 1798.00 0
2006-12-05 Acid Treatment 1798.20 1799.60 0
1986-02-04 Acid Treatment 1871.00 1873.00 0
2006-12-05 Acid Treatment 1801.70 1803.20 0
2006-12-06 Acid Treatment 1796.60 1798.00 0
2006-12-06 Acid Treatment 1798.20 1799.60 0
2006-12-06 Acid Treatment 1801.70 1803.20 0
2013-03-15 Perforation 1837.50 1842.50 13
2013-03-15 Perforation 1823.00 1825.00 13
2013-03-15 Perforation 1817.00 1819.00 13
2013-03-15 Perforation 1813.00 1814.50 13
2013-03-15 Perforation 1810.50 1812.00 13
2013-03-17 Acid Treatment 1871.00 1873.00 0
1986-02-08 Perforation 1810.50 1812.00 13
2013-03-17 Acid Treatment 1886.00 1889.00 0
2013-03-18 Acid Treatment 1837.50 1842.50 0
2013-03-20 Perforation 1798.20 1799.60 13
2013-03-20 Perforation 1796.60 1798.00 13
2013-03-20 Perforation 1886.00 1889.00 13
2013-03-20 Perforation 1871.00 1873.00 13
2013-03-20 Perforation 1801.70 1803.20 13
2013-03-21 Acid Treatment 1886.00 1889.00 0
2013-03-21 Acid Treatment 1871.00 1873.00 0
2017-06-12 Acid Treatment 1837.50 1842.50 0
1986-02-08 Perforation 1813.00 1814.50 13
2017-06-12 Acid Treatment 1871.00 1873.00 0
2017-06-12 Acid Treatment 1886.00 1889.00 0
1986-02-08 Perforation 1817.00 1819.00 13
1986-02-08 Perforation 1823.00 1825.00 13
1986-02-10 Acid Treatment 1810.50 1825.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 5621 0.0 0.0 0.0
1987 8162 0.0 0.0 0.0
1988 7727 0.0 0.0 0.0
1989 6760 0.0 0.0 0.0
1990 7817 0.0 0.0 0.0
1991 4970 0.0 0.0 0.0
1992 5693 0.0 0.0 0.0
1993 7014 0.0 0.0 0.0
1994 6740 0.0 0.0 0.0
1995 7929 0.0 0.0 0.0
1996 8149 0.0 0.0 0.0
1997 7387 0.0 0.0 0.0
1998 4011 0.0 0.0 0.0
1999 2637 0.0 0.0 0.0
2000 6304 0.0 0.0 0.0
2001 3340 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-03-30 No Incident Encountered 0.00 0.00
2017-06-24 No Incident Encountered 0.00 0.00

For data sources see[6]

References