X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1086073116000

Well Details

Well ID: 1086073116000
Loading map...
Location: 00/16-31-108-07W6/0
Location Alias: 00/16-31-08-07 W6M
Location Alias 2: 00/16-31-108-07 W6/00
Country: Canada
Province: Alberta
Township: 108
Meridian: 6
Range: 07
Section: 31
County/Municipality: Mackenzie County
Well Name: HUSKY MOBIL RAINBOW 16-31-108-7
Operator Name: Husky Oil Operations Limited
License Number: 0190586
License Date: 1996-08-19
License Status: Issued
Spud Date: 1996-09-16
Final Drill Date: 1996-09-27
Well Total Depth: 1907.00 m
Surface Hole Latitude: 58.424629
Surface Hole Longitude: -119.147555

For data sources see[1][2]

Well History

Date Event
1996-08-19 Obtained License
1996-09-18 Surface Casing Operation Performed
1996-09-25 Intermediate Casing Operation Performed
1996-09-26 Lost Circulation Occurred
1996-09-27 Finished Drilling
1996-09-27 Well Log Performed
1996-09-27 Well Mode changed to Drilled and Cased
1996-09-28 Plug Back Performed
1996-09-30 Liner Casing Operation Performed
1996-10-01 Rig Released
1996-10-01 Well Began Production
1996-10-01 Well Fluid changed to Crude Oil
1996-10-01 Well Mode changed to Flowing
1996-10-06 Well Log Performed
1996-10-07 Perforation Treatment Performed - Jet Perforation
1996-10-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-10-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-10-11 Well Log Performed
1996-10-12 Perforation Treatment Performed - Cement Squeeze
1996-10-12 Well Log Performed
1996-10-13 Perforation Treatment Performed - Cement Squeeze
1996-10-16 Perforation Treatment Performed - Jet Perforation
1996-10-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-10-17 Well Log Performed
1996-10-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-10-20 Perforation Treatment Performed - Cement Squeeze
1996-10-23 Perforation Treatment Performed - Jet Perforation
1996-10-23 Well Log Performed
1996-10-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-10-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-10-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-10-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-10-30 Perforation Treatment Performed - Jet Perforation
1996-10-30 Well Log Performed
1996-10-31 Perforation Treatment Performed - Remedial Casing
1996-11-03 Well Log Performed
2002-09-10 Perforation Treatment Performed - Cement Squeeze
2002-09-17 Perforation Treatment Performed - Jet Perforation
2002-09-17 Well Log Performed
2002-09-19 Well Log Performed
2010-12-09 Well Fluid changed to Crude Oil
2010-12-09 Well Mode changed to Suspended
2011-07-22 Perforation Treatment Performed - Cement Squeeze
2011-07-28 Perforation Treatment Performed - Jet Perforation
2011-07-28 Well Log Performed
2011-07-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-07-30 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-07-31 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-08-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-08-02 Perforation Treatment Performed - Jet Perforation
2011-08-02 Well Log Performed
2011-08-03 Perforation Treatment Performed - Jet Perforation
2011-08-03 Well Log Performed
2011-08-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-08-05 Well Log Performed
2011-08-06 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-14 Well Fluid changed to Crude Oil
2012-02-14 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-10-07 Perforation 1808.00 1813.50 13
1996-10-16 Perforation 1822.00 1825.00 13
1996-10-16 Perforation 1828.50 1829.50 13
1996-10-16 Perforation 1831.50 1832.50 13
1996-10-17 Acid Treatment 1831.50 1832.50 0
1996-10-19 Acid Treatment 1808.00 1829.50 0
1996-10-20 Cement Squeeze 1822.00 1829.50 0
1996-10-23 Perforation 1822.00 1825.00 13
1996-10-23 Perforation 1828.50 1829.50 13
1996-10-23 Perforation 1831.50 1832.50 13
1996-10-24 Acid Treatment 1828.50 1829.50 0
1996-10-07 Perforation 1815.50 1818.00 13
1996-10-25 Acid Treatment 1828.50 1829.50 0
1996-10-27 Acid Treatment 1822.00 1825.00 0
1996-10-28 Acid Treatment 1822.00 1832.50 0
1996-10-30 Perforation 910.00 911.00 13
1996-10-31 Remedial Casing Cementing 910.00 911.00 0
2002-09-10 Cement Squeeze 1822.00 1832.50 0
2002-09-17 Perforation 1844.00 1850.00 14
2002-09-17 Perforation 1858.00 1862.00 14
2002-09-17 Perforation 1868.00 1873.00 14
2002-09-17 Perforation 1878.00 1883.00 14
1996-10-07 Perforation 1822.00 1825.50 13
2011-07-22 Cement Squeeze 1878.00 1883.00 0
2011-07-22 Cement Squeeze 1868.00 1873.00 0
2011-07-22 Cement Squeeze 1858.00 1862.00 0
2011-07-22 Cement Squeeze 1844.00 1850.00 0
2011-07-22 Cement Squeeze 1808.00 1813.50 0
2011-07-28 Perforation 1879.00 1882.00 13
2011-07-28 Perforation 1869.00 1872.00 13
2011-07-28 Perforation 1862.00 1863.00 13
2011-07-29 Acid Treatment 1879.00 1882.00 0
2011-07-30 Acid Treatment 1869.00 1872.00 0
1996-10-07 Perforation 1828.50 1829.50 13
2011-07-31 Acid Treatment 1862.00 1863.00 0
2011-08-02 Perforation 1829.00 1831.00 13
2011-08-02 Acid Treatment 1829.00 1831.00 0
2011-08-03 Perforation 1829.00 1833.00 13
2011-08-04 Acid Treatment 1829.00 1833.00 0
2011-08-06 Multi-Stage Fracture 1873.40 1873.50 0
2011-08-06 Multi-Stage Fracture 1864.30 1864.40 0
1996-10-07 Perforation 1831.50 1832.50 13
1996-10-08 Acid Treatment 1828.50 1832.50 0
1996-10-09 Acid Treatment 1808.00 1825.50 0
1996-10-12 Cement Squeeze 1828.50 1829.50 0
1996-10-13 Cement Squeeze 1815.50 1825.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 882 0.0 0.0 0.0
1997 8305 0.0 0.0 0.0
1998 8526 0.0 0.0 0.0
1999 8490 0.0 0.0 0.0
2000 8769 0.0 0.0 0.0
2001 8665 0.0 0.0 0.0
2002 2991 0.0 0.0 0.0
2003 8521 0.0 0.0 0.0
2004 8595 0.0 0.0 0.0
2005 8636 0.0 0.0 0.0
2006 5196 0.0 0.0 0.0
2007 7287 0.0 0.0 0.0
2008 6641 0.0 0.0 0.0
2009 3056 0.0 0.0 0.0
2012 4263 0.0 0.0 0.0
2013 5130 0.0 0.0 0.0
2014 2600 0.0 0.0 0.0
2015 3169 0.0 0.0 0.0
2016 2122 0.0 0.0 0.0
2017 7762 0.0 0.0 0.0
2018 8099 0.0 0.0 0.0
2019 7775 0.0 0.0 0.0
2020 2031 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1996-09-26 Lost Circulation 1792.00 1907.00

For data sources see[6]

References