X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1086073110000

Well Details

Well ID: 1086073110000
Loading map...
Location: 00/10-31-108-07W6/0
Location Alias: 00/10-31-08-07 W6M
Location Alias 2: 00/10-31-108-07 W6/00
Country: Canada
Province: Alberta
Township: 108
Meridian: 6
Range: 07
Section: 31
County/Municipality: Mackenzie County
Well Name: HUSKY MOBIL RAINBOW 10-31-108-7
Operator Name: Husky Oil Operations Limited
License Number: 0030384
License Date: 1966-05-11
License Status: Suspension
Spud Date: 1966-05-16
Final Drill Date: 1966-06-06
Well Total Depth: 1917.80 m
Surface Hole Latitude: 58.422043
Surface Hole Longitude: -119.153896

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-05-11 Obtained License
1966-06-06 Blowout Occurred
1966-06-06 Finished Drilling
1966-06-06 Perforation Treatment Performed - Open-Hole Completion
1966-06-06 Well Mode changed to Drilled and Cased
1966-07-02 Perforation Treatment Performed - Acid Wash - No Pressure
1966-07-04 Well Began Production
1966-07-04 Well Fluid changed to Crude Oil
1966-07-04 Well Mode changed to Flowing
1966-09-22 Perforation Treatment Performed - Open-Hole Completion
1967-01-15 Perforation Treatment Performed - Open-Hole Completion
1967-01-15 Perforation Treatment Performed - Resin-Gypsum Squeeze Or Plug
1967-01-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-10-19 Perforation Treatment Performed - Cement Plug
1982-10-19 Perforation Treatment Performed - Open-Hole Completion
1984-01-27 Perforation Treatment Performed - Jet Perforation
1984-01-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-09-29 Tie-Back Casing Operation Performed
1986-10-03 Perforation Treatment Performed - Jet Perforation
1986-10-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-06-22 Perforation Treatment Performed - Cement Squeeze
1989-06-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-06-25 Perforation Treatment Performed - Jet Perforation
1989-06-30 Perforation Treatment Performed - Cement Squeeze
1989-07-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-07-03 Perforation Treatment Performed - Jet Perforation
1989-07-05 Perforation Treatment Performed - Jet Perforation
1989-07-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-07-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-07-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-07-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-02-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-01-20 Perforation Treatment Performed - Open-Hole Completion
2003-02-02 Well Log Performed
2003-02-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-02-05 Well Log Performed
2009-07-25 Well Fluid changed to Crude Oil
2009-07-25 Well Mode changed to Suspended
2019-12-15 Well Type changed to Observation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-06-06 Open Hole/Barefoot Completion 1831.20 1836.40 0
1984-01-30 Acid Treatment 1804.10 1838.40 0
1986-10-03 Perforation 1826.00 1829.50 13
1986-10-05 Acid Treatment 1826.00 1829.50 0
1989-06-22 Cement Squeeze 1804.10 1829.50 0
1989-06-25 Perforation 1816.50 1818.50 13
1989-06-25 Perforation 1823.30 1825.30 13
1989-06-25 Acid Treatment 1816.50 1825.30 0
1989-06-30 Cement Squeeze 1816.50 1825.30 0
1989-07-03 Perforation 1816.50 1818.50 13
1989-07-03 Perforation 1804.10 1805.60 13
1966-07-02 Acid Wash 1831.20 1836.40 0
1989-07-03 Acid Treatment 1816.50 1818.50 0
1989-07-05 Perforation 1823.30 1825.30 13
1989-07-06 Acid Treatment 1823.30 1825.30 0
1989-07-07 Acid Treatment 1823.30 1825.30 0
1989-07-08 Acid Treatment 1823.30 1825.30 0
1989-07-10 Acid Treatment 1823.30 1825.30 0
1993-02-07 Acid Treatment 1816.50 1818.50 0
2003-01-20 Open Hole/Barefoot Completion 1838.40 1879.60 0
2003-02-03 Acid Treatment 1816.50 1879.60 0
1966-09-22 Open Hole/Barefoot Completion 1831.20 1917.80 0
1967-01-15 Resin-Gypsum Squeeze or Plug 1869.00 1911.70 0
1967-01-15 Open Hole/Barefoot Completion 1831.20 1869.00 0
1967-01-16 Acid Treatment 1831.20 1869.00 0
1982-10-19 Cement Plug 1838.40 1869.00 0
1982-10-19 Open Hole/Barefoot Completion 1831.20 1838.40 0
1984-01-27 Perforation 1804.10 1805.60 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1966 0 0.0 0.0 0.0
1967 159 0.0 0.0 0.0
1968 6369 0.0 0.0 0.0
1969 5384 0.0 0.0 0.0
1970 5745 0.0 0.0 0.0
1971 6721 0.0 0.0 0.0
1972 8158 0.0 0.0 0.0
1973 8092 0.0 0.0 0.0
1974 7968 0.0 0.0 0.0
1975 6886 0.0 0.0 0.0
1976 7630 0.0 0.0 0.0
1977 8245 0.0 0.0 0.0
1978 7688 0.0 0.0 0.0
1979 8557 0.0 0.0 0.0
1980 7512 0.0 0.0 0.0
1981 2978 0.0 0.0 0.0
1982 4217 0.0 0.0 0.0
1983 1381 0.0 0.0 0.0
1984 7269 0.0 0.0 0.0
1985 7693 0.0 0.0 0.0
1986 7263 0.0 0.0 0.0
1987 7943 0.0 0.0 0.0
1988 8048 0.0 0.0 0.0
1989 7820 0.0 0.0 0.0
1990 8737 0.0 0.0 0.0
1991 7203 0.0 0.0 0.0
1992 8450 0.0 0.0 0.0
1993 7662 0.0 0.0 0.0
1994 4795 0.0 0.0 0.0
1995 8451 0.0 0.0 0.0
1996 6435 0.0 0.0 0.0
1997 6995 0.0 0.0 0.0
1998 7993 0.0 0.0 0.0
1999 8448 0.0 0.0 0.0
2000 8346 0.0 0.0 0.0
2001 8302 0.0 0.0 0.0
2002 954 0.0 0.0 0.0
2003 6684 0.0 0.0 0.0
2004 8653 0.0 0.0 0.0
2005 8629 0.0 0.0 0.0
2006 1361 0.0 0.0 0.0
2007 422 0.0 0.0 0.0
2008 3 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1966-06-06 Blowout 1836.40 1836.40

For data sources see[6]

References