X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1086072808002

Well Details

Well ID: 1086072808002
Loading map...
Location: 00/08-28-108-07W6/2
Location Alias: 00/08-28-08-07 W6M
Location Alias 2: 00/08-28-108-07 W6/02
Country: Canada
Province: Alberta
Township: 108
Meridian: 6
Range: 07
Section: 28
County/Municipality: Mackenzie County
Well Name: HUSKY MOBIL RAINBOW 8-28-108-7
Operator Name: Husky Oil Operations Limited
License Number: 0030870
License Date: 1966-08-25
License Status: Suspension
Spud Date: 1966-09-06
Final Drill Date: 1966-10-12
Well Total Depth: 2040.30 m
Surface Hole Latitude: 58.403501
Surface Hole Longitude: -119.093531

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-08-25 Obtained License
1966-10-01 Drill Stem Test Performed
1966-10-12 Finished Drilling
1966-10-12 Well Mode changed to Drilled and Cased
1966-10-13 Well Log Performed
1966-10-14 Drill Stem Test Performed
1966-10-15 Liner Casing Operation Performed
1966-10-18 Perforation Treatment Performed - Jet Perforation
1966-10-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-04-10 Perforation Treatment Performed - Cement Squeeze
1983-04-14 Perforation Treatment Performed - Jet Perforation
1983-04-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-09-26 Perforation Treatment Performed - Jet Perforation
1985-09-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-02-02 Perforation Treatment Performed - Cement Squeeze
1987-02-05 Perforation Treatment Performed - Jet Perforation
1987-02-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-11-06 Perforation Treatment Performed - Cement Squeeze
1988-11-09 Perforation Treatment Performed - Jet Perforation
1988-11-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-11-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-05-18 Perforation Treatment Performed - Jet Perforation
1991-05-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-05-19 Perforation Treatment Performed - Jet Perforation
1991-05-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-05-21 Perforation Treatment Performed - Cement Squeeze
1991-05-24 Perforation Treatment Performed - Cement Squeeze
1991-05-27 Perforation Treatment Performed - Jet Perforation
1991-05-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-05-28 Perforation Treatment Performed - Jet Perforation
1991-05-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-09-03 Well Began Injection
1991-09-03 Well Fluid changed to Gas
1991-09-03 Well Type changed to Injection
2000-03-14 Well Fluid changed to Solvent
2000-03-14 Well Type changed to Injection
2003-10-18 Well Log Performed
2007-09-25 Well Log Performed
2009-05-26 Well Log Performed
2013-06-04 Well Log Performed
2014-08-06 Well Fluid changed to Solvent
2014-08-06 Well Mode changed to Suspended
2014-08-06 Well Type changed to Injection
2017-12-19 Well Type changed to Observation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-10-18 Perforation 1860.80 1863.90 7
1987-02-05 Perforation 1841.00 1845.00 13
1987-02-08 Acid Treatment 1837.00 1845.00 0
1988-11-06 Cement Squeeze 1837.00 1845.00 0
1988-11-09 Perforation 1839.00 1842.00 13
1988-11-10 Acid Treatment 1839.00 1842.00 0
1988-11-12 Acid Treatment 1839.00 1842.00 0
1991-05-18 Perforation 1808.00 1810.00 13
1991-05-18 Perforation 1785.00 1787.00 13
1991-05-19 Perforation 1794.00 1796.00 13
1991-05-19 Acid Treatment 1794.00 1796.00 0
1966-10-19 Acid Treatment 1860.80 1863.90 0
1991-05-20 Acid Treatment 1785.00 1796.00 0
1991-05-21 Cement Squeeze 1785.00 1796.00 0
1991-05-24 Cement Squeeze 1808.00 1810.00 0
1991-05-27 Perforation 1794.00 1797.00 13
1991-05-27 Perforation 1785.00 1787.00 13
1991-05-28 Acid Treatment 1785.00 1842.00 0
1991-05-28 Perforation 1808.00 1812.00 13
1991-05-30 Acid Treatment 1808.00 1812.00 0
1983-04-10 Cement Squeeze 1860.80 1863.90 0
1983-04-14 Perforation 1847.90 1851.00 13
1983-04-16 Acid Treatment 1847.90 1851.00 0
1985-09-26 Perforation 1841.00 1844.00 13
1985-09-28 Acid Treatment 1841.00 1851.00 0
1987-02-02 Cement Squeeze 1841.00 1851.00 0
1987-02-05 Perforation 1837.00 1839.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0

For data sources see[5]

References