X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1086072808000

Well Details

Well ID: 1086072808000
Loading map...
Location: 00/08-28-108-07W6/0
Location Alias: 00/08-28-08-07 W6M
Location Alias 2: 00/08-28-108-07 W6/00
Country: Canada
Province: Alberta
Township: 108
Meridian: 6
Range: 07
Section: 28
County/Municipality: Mackenzie County
Well Name: HUSKY MOBIL RAINBOW 8-28-108-7
Operator Name: Husky Oil Operations Limited
License Number: 0030870
License Date: 1966-08-25
License Status: Suspension
Spud Date: 1966-09-06
Final Drill Date: 1966-10-12
Well Total Depth: 2040.30 m
Surface Hole Latitude: 58.403501
Surface Hole Longitude: -119.093531

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-08-25 Obtained License
1966-10-01 Drill Stem Test Performed
1966-10-12 Finished Drilling
1966-10-12 Well Mode changed to Drilled and Cased
1966-10-13 Well Log Performed
1966-10-14 Drill Stem Test Performed
1966-10-15 Liner Casing Operation Performed
1966-10-18 Perforation Treatment Performed - Jet Perforation
1966-10-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-10-22 Well Began Production
1966-10-22 Well Fluid changed to Crude Oil
1966-10-22 Well Mode changed to Flowing
1966-12-02 Well Fluid changed to Crude Oil
1966-12-02 Well Mode changed to Suspended
1968-05-03 Well Fluid changed to Crude Oil
1968-05-03 Well Mode changed to Flowing
1983-04-10 Perforation Treatment Performed - Cement Squeeze
1983-04-14 Perforation Treatment Performed - Jet Perforation
1983-04-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-09-26 Perforation Treatment Performed - Jet Perforation
1985-09-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-02-02 Perforation Treatment Performed - Cement Squeeze
1987-02-05 Perforation Treatment Performed - Jet Perforation
1987-02-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-11-06 Perforation Treatment Performed - Cement Squeeze
1988-11-09 Perforation Treatment Performed - Jet Perforation
1988-11-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-11-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-05-18 Perforation Treatment Performed - Jet Perforation
1991-05-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-05-19 Perforation Treatment Performed - Jet Perforation
1991-05-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-05-21 Perforation Treatment Performed - Cement Squeeze
1991-05-24 Perforation Treatment Performed - Cement Squeeze
1991-05-27 Perforation Treatment Performed - Jet Perforation
1991-05-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-05-28 Perforation Treatment Performed - Jet Perforation
1991-05-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-09-03 Well Fluid changed to Crude Oil
1991-09-03 Well Mode changed to Flowing
1997-10-01 Well Fluid changed to Crude Oil
1997-10-01 Well Mode changed to Suspended
2003-10-18 Well Log Performed
2007-09-25 Well Log Performed
2009-05-26 Well Log Performed
2013-06-04 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-10-18 Perforation 1860.80 1863.90 7
1987-02-05 Perforation 1841.00 1845.00 13
1987-02-08 Acid Treatment 1837.00 1845.00 0
1988-11-06 Cement Squeeze 1837.00 1845.00 0
1988-11-09 Perforation 1839.00 1842.00 13
1988-11-10 Acid Treatment 1839.00 1842.00 0
1988-11-12 Acid Treatment 1839.00 1842.00 0
1991-05-18 Perforation 1808.00 1810.00 13
1991-05-18 Perforation 1785.00 1787.00 13
1991-05-19 Perforation 1794.00 1796.00 13
1991-05-19 Acid Treatment 1794.00 1796.00 0
1966-10-19 Acid Treatment 1860.80 1863.90 0
1991-05-20 Acid Treatment 1785.00 1796.00 0
1991-05-21 Cement Squeeze 1785.00 1796.00 0
1991-05-24 Cement Squeeze 1808.00 1810.00 0
1991-05-27 Perforation 1794.00 1797.00 13
1991-05-27 Perforation 1785.00 1787.00 13
1991-05-28 Acid Treatment 1785.00 1842.00 0
1991-05-28 Perforation 1808.00 1812.00 13
1991-05-30 Acid Treatment 1808.00 1812.00 0
1983-04-10 Cement Squeeze 1860.80 1863.90 0
1983-04-14 Perforation 1847.90 1851.00 13
1983-04-16 Acid Treatment 1847.90 1851.00 0
1985-09-26 Perforation 1841.00 1844.00 13
1985-09-28 Acid Treatment 1841.00 1851.00 0
1987-02-02 Cement Squeeze 1841.00 1851.00 0
1987-02-05 Perforation 1837.00 1839.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1966 0 0.0 0.0 0.0
1968 2499 0.0 0.0 0.0
1969 5479 0.0 0.0 0.0
1970 5942 0.0 0.0 0.0
1971 6613 0.0 0.0 0.0
1972 8460 0.0 0.0 0.0
1973 8171 0.0 0.0 0.0
1974 7718 0.0 0.0 0.0
1975 7609 0.0 0.0 0.0
1976 7789 0.0 0.0 0.0
1977 6902 0.0 0.0 0.0
1978 6444 0.0 0.0 0.0
1979 7666 0.0 0.0 0.0
1980 8412 0.0 0.0 0.0
1981 7956 0.0 0.0 0.0
1982 8022 0.0 0.0 0.0
1983 8315 0.0 0.0 0.0
1984 7982 0.0 0.0 0.0
1985 7890 0.0 0.0 0.0
1986 4710 0.0 0.0 0.0
1987 7157 0.0 0.0 0.0
1988 5422 0.0 0.0 0.0
1989 8451 0.0 0.0 0.0
1990 7775 0.0 0.0 0.0
1991 6445 0.0 0.0 0.0
1992 4100 0.0 0.0 0.0
1993 912 0.0 0.0 0.0
1996 24 0.0 0.0 0.0

For data sources see[5]

References