X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1086072403002

Well Details

Well ID: 1086072403002
Loading map...
Location: 00/03-24-108-07W6/2
Location Alias: 00/03-24-08-07 W6M
Location Alias 2: 00/03-24-108-07 W6/02
Country: Canada
Province: Alberta
Township: 108
Meridian: 6
Range: 07
Section: 24
County/Municipality: Mackenzie County
Well Name: CABOT ENERGY RAINBOW 3-24-108-7
Operator Name: Cabot Energy Inc.
License Number: 0143009
License Date: 1990-01-29
License Status: Suspension
Spud Date: 1990-02-10
Final Drill Date: 1990-03-13
Well Total Depth: 1953.00 m
Surface Hole Latitude: 58.386183
Surface Hole Longitude: -119.025707

For data sources see[1][2]

Well History

Date Event
1990-01-29 Obtained License
1990-02-11 Surface Casing Operation Performed
1990-02-13 Kick Occurred
1990-02-14 Kick Occurred
1990-02-14 Lost Circulation Occurred
1990-02-25 Well Log Performed
1990-03-03 Well Log Performed
1990-03-04 Well Log Performed
1990-03-06 Intermediate Casing Operation Performed
1990-03-13 Finished Drilling
1990-03-13 Well Mode changed to Drilled and Cased
1990-03-14 Well Log Performed
1990-03-15 Liner Casing Operation Performed
1990-03-17 Rig Released
1990-03-17 Well Log Performed
1990-03-27 Perforation Treatment Performed - Jet Perforation
1990-03-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-03-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-11-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-11-11 Perforation Treatment Performed - Jet Perforation
1992-11-11 Well Log Performed
1992-11-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-11-15 Perforation Treatment Performed - Jet Perforation
1992-11-15 Well Log Performed
1992-11-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-11-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-11-02 Plug Back Performed
1996-11-02 Well Log Performed
1996-12-15 Well Began Production
1996-12-15 Well Fluid changed to Gas
1996-12-15 Well Mode changed to Flowing
2001-08-08 Perforation Treatment Performed - Jet Perforation
2002-03-14 Perforation Treatment Performed - Cement Squeeze
2002-03-14 Plug Back Performed
2002-03-14 Well Fluid changed to Gas
2002-03-14 Well Mode changed to Abandoned Zone
2002-05-30 Well Fluid changed to Gas
2002-05-30 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-03-27 Perforation 1899.00 1904.00 13
1996-11-02 Packing Device Capped w/Cement 1837.00 1845.00 0
2001-08-08 Perforation 602.00 605.00 17
2002-03-14 Cement Squeeze 602.00 605.00 0
1990-03-28 Acid Treatment 1899.00 1904.00 0
1990-03-30 Acid Treatment 1899.00 1904.00 0
1992-11-11 Packing Device Capped w/Cement 1894.00 1897.00 0
1992-11-11 Perforation 1885.00 1890.00 13
1992-11-14 Packing Device Capped w/Cement 1875.00 1883.00 0
1992-11-15 Perforation 1855.00 1859.00 13
1992-11-15 Perforation 1865.00 1869.00 13
1992-11-16 Acid Treatment 1855.00 1869.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 448 0.0 0.0 0.0
1997 6985 0.0 0.0 0.0
1998 331 0.0 0.0 0.0
1999 3459 0.0 0.0 0.0
2000 7898 0.0 0.0 0.0
2001 5977 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1990-02-13 Kick 610.00 610.00
1990-02-14 Lost Circulation 661.00 1238.00
1990-02-14 Kick 661.00 661.00

For data sources see[6]

References