X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1086071310022

Well Details

Well ID: 1086071310022
Loading map...
Location: 02/10-13-108-07W6/2
Location Alias: 02/10-13-08-07 W6M
Location Alias 2: 02/10-13-108-07 W6/02
Country: Canada
Province: Alberta
Township: 108
Meridian: 6
Range: 07
Section: 13
County/Municipality: Mackenzie County
Well Name: SLE RAINBOW 10-13-108-7
Operator Name: SanLing Energy Ltd.
License Number: 0123012
License Date: 1986-03-17
License Status: Issued
Spud Date: 1986-03-01
Final Drill Date: 1986-03-22
Well Total Depth: 1876.00 m
Surface Hole Latitude: 58.377197
Surface Hole Longitude: -119.018124

For data sources see[1][2]

Well History

Date Event
1986-03-03 Surface Casing Operation Performed
1986-03-05 Lost Circulation Occurred
1986-03-07 Intermediate Casing Operation Performed
1986-03-17 Obtained License
1986-03-22 Finished Drilling
1986-03-22 Well Log Performed
1986-03-22 Well Mode changed to Drilled and Cased
1986-03-24 Well Log Performed
1986-03-25 Drill Stem Test Performed
1986-03-26 Drill Stem Test Performed
1986-03-27 Drill Stem Test Performed
1986-03-28 Drill Stem Test Performed
1986-03-30 Liner Casing Operation Performed
1986-03-30 Rig Released
1986-03-31 Well Log Performed
1986-08-31 Perforation Treatment Performed - Jet Perforation
1986-08-31 Well Log Performed
1986-09-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-01-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-03-14 Perforation Treatment Performed - Chemical Squeeze
1997-03-28 Well Log Performed
1997-03-29 Well Log Performed
1997-04-02 Well Log Performed
1997-04-05 Well Log Performed
1997-07-30 Well Began Production
1997-07-30 Well Fluid changed to Gas
1997-07-30 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-08-31 Perforation 1831.50 1834.00 13
1986-09-02 Acid Treatment 1831.50 1834.00 0
1990-01-28 Acid Treatment 1831.50 1834.00 0
1991-03-14 Chemical Squeeze 1831.50 1834.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 3666 0.0 0.0 0.0
1998 7954 0.0 0.0 0.0
1999 8203 0.0 0.0 0.0
2000 8180 0.0 0.0 0.0
2001 6830 0.0 0.0 0.0
2002 8279 0.0 0.0 0.0
2003 8252 0.0 0.0 0.0
2004 8434 0.0 0.0 0.0
2005 8463 0.0 0.0 0.0
2006 8357 0.0 0.0 0.0
2007 8284 0.0 0.0 0.0
2008 8170 0.0 0.0 0.0
2009 7379 0.0 0.0 0.0
2010 7478 0.0 0.0 0.0
2011 7778 0.0 0.0 0.0
2012 5278 0.0 0.0 0.0
2013 7016 0.0 0.0 0.0
2014 7860 0.0 0.0 0.0
2015 8108 0.0 0.0 0.0
2016 7302 0.0 0.0 0.0
2017 7880 0.0 0.0 0.0
2018 4027 0.0 0.0 0.0
2019 5160 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1986-03-05 Lost Circulation 304.00 304.00

For data sources see[6]

References