If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 1086070513002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":58.353268,"lon":-119.141567,"icon":""}]} |
Location: 00/13-05-108-07W6/2 | |
Location Alias: 00/13-05-08-07 W6M | |
Location Alias 2: 00/13-05-108-07 W6/02 | |
Country: Canada | |
Province: Alberta | |
Township: 108 | |
Meridian: 6 | |
Range: 07 | |
Section: 05 | |
County/Municipality: Mackenzie County | |
Well Name: CABOT ENERGY RAINBOW 13-5-108-7 | |
Operator Name: Cabot Energy Inc. | |
License Number: 0031897 | |
License Date: 1967-03-02 | |
License Status: Amended | |
Spud Date: 1967-03-06 | |
Final Drill Date: 1967-04-22 | |
Well Total Depth: 2080.60 m | |
Surface Hole Latitude: 58.353268 | |
Surface Hole Longitude: -119.141567 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1967-03-02 | Obtained License |
1967-03-19 | Drill Stem Test Performed |
1967-03-25 | Drill Stem Test Performed |
1967-03-27 | Drill Stem Test Performed |
1967-04-08 | Drill Stem Test Performed |
1967-04-22 | Finished Drilling |
1967-04-22 | Well Mode changed to Drilled and Cased |
1967-04-25 | Liner Casing Operation Performed |
1967-04-28 | Perforation Treatment Performed - Jet Perforation |
1967-04-29 | Perforation Treatment Performed - Cement Squeeze |
1967-05-02 | Perforation Treatment Performed - Jet Perforation |
1967-05-03 | Perforation Treatment Performed - Cement Squeeze |
1967-05-05 | Perforation Treatment Performed - Jet Perforation |
1967-05-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1967-05-09 | Perforation Treatment Performed - Jet Perforation |
1967-08-06 | Perforation Treatment Performed - Jet Perforation |
1967-08-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1967-08-13 | Perforation Treatment Performed - Cement Squeeze |
1967-08-15 | Perforation Treatment Performed - Jet Perforation |
1967-08-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1967-08-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1967-08-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1967-08-29 | Well Began Production |
1967-08-29 | Well Fluid changed to Crude Oil |
1967-08-29 | Well Mode changed to Flowing |
1968-08-10 | Perforation Treatment Performed - Cement Squeeze |
1968-08-14 | Perforation Treatment Performed - Jet Perforation |
1968-08-17 | Perforation Treatment Performed - Jet Perforation |
1968-08-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1968-08-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1968-08-20 | Perforation Treatment Performed - Jet Perforation |
1968-08-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1968-08-21 | Well Fluid changed to Crude Oil |
1968-08-21 | Well Mode changed to Flowing |
1969-06-10 | Well Fluid changed to Crude Oil |
1969-06-10 | Well Mode changed to Suspended |
1974-11-15 | Perforation Treatment Performed - Jet Perforation |
1974-11-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1975-03-26 | Perforation Treatment Performed - Jet Perforation |
1975-03-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1975-03-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1975-03-31 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-11-16 | Perforation Treatment Performed - Jet Perforation |
1990-11-16 | Well Log Performed |
1990-11-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-11-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1991-07-12 | Well Fluid changed to Gas |
1991-07-12 | Well Mode changed to Flowing |
1996-05-28 | Perforation Treatment Performed - Jet Perforation |
1996-06-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-06-04 | Perforation Treatment Performed - Jet Perforation |
1996-06-04 | Well Log Performed |
1996-06-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1996-06-08 | Perforation Treatment Performed - Cement Squeeze |
1996-06-08 | Well Fluid changed to Gas |
1996-06-08 | Well Mode changed to Suspended |
1996-06-12 | Perforation Treatment Performed - Jet Perforation |
1996-06-15 | Perforation Treatment Performed - Cement Squeeze |
1996-06-15 | Well Log Performed |
1996-06-18 | Perforation Treatment Performed - Jet Perforation |
1996-06-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1997-10-01 | Perforation Treatment Performed - Cement Plug |
1997-10-01 | Plug Back Performed |
1997-10-01 | Well Fluid changed to Gas |
1997-10-01 | Well Mode changed to Abandoned and Whipstocked |
2003-12-06 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1967-04-28 | Perforation | 1873.60 | 1875.40 | 7 |
1967-08-13 | Cement Squeeze | 1784.60 | 1787.30 | 0 |
1967-08-15 | Perforation | 1763.60 | 1764.20 | 7 |
1967-08-15 | Perforation | 1768.10 | 1769.70 | 7 |
1967-08-15 | Perforation | 1772.10 | 1773.60 | 7 |
1967-08-16 | Acid Treatment | 1763.60 | 1773.60 | 0 |
1967-08-17 | Acid Treatment | 1763.60 | 1773.60 | 0 |
1967-08-24 | Acid Treatment | 1763.60 | 1773.60 | 0 |
1968-08-10 | Cement Squeeze | 1763.60 | 1787.30 | 0 |
1968-08-14 | Perforation | 1862.00 | 1862.90 | 7 |
1968-08-14 | Perforation | 1784.60 | 1787.30 | 7 |
1967-04-29 | Cement Squeeze | 1873.60 | 1875.40 | 0 |
1968-08-17 | Perforation | 1752.90 | 1754.40 | 7 |
1968-08-18 | Acid Treatment | 1752.90 | 1754.40 | 0 |
1968-08-18 | Acid Treatment | 1752.90 | 1754.40 | 0 |
1968-08-19 | Acid Treatment | 1752.90 | 1754.40 | 0 |
1968-08-20 | Perforation | 1755.30 | 1763.90 | 7 |
1968-08-21 | Packing Device Capped w/Cement | 1827.00 | 1831.20 | 0 |
1974-11-15 | Perforation | 1791.60 | 1793.40 | 7 |
1974-11-15 | Perforation | 1804.40 | 1809.30 | 7 |
1974-11-15 | Perforation | 1811.00 | 1813.60 | 7 |
1974-11-21 | Acid Treatment | 1784.60 | 1813.60 | 0 |
1967-05-02 | Perforation | 1865.40 | 1867.20 | 7 |
1975-03-26 | Perforation | 1794.40 | 1795.60 | 13 |
1975-03-26 | Perforation | 1796.50 | 1797.40 | 13 |
1975-03-26 | Perforation | 1814.80 | 1815.70 | 13 |
1975-03-26 | Perforation | 1819.70 | 1820.90 | 13 |
1975-03-27 | Acid Treatment | 1804.40 | 1820.90 | 0 |
1975-03-27 | Acid Treatment | 1811.10 | 1815.70 | 0 |
1975-03-28 | Acid Treatment | 1791.60 | 1797.40 | 0 |
1975-03-31 | Acid Treatment | 1784.60 | 1787.70 | 0 |
1990-11-16 | Perforation | 1751.90 | 1754.30 | 14 |
1990-11-16 | Perforation | 1758.00 | 1760.40 | 14 |
1967-05-03 | Cement Squeeze | 1865.40 | 1867.20 | 0 |
1990-11-16 | Perforation | 1763.50 | 1764.70 | 14 |
1990-11-16 | Perforation | 1768.10 | 1769.30 | 14 |
1990-11-16 | Perforation | 1772.30 | 1773.80 | 14 |
1990-11-16 | Perforation | 1780.00 | 1783.00 | 14 |
1990-11-18 | Acid Treatment | 1780.00 | 1820.90 | 0 |
1990-11-22 | Acid Treatment | 1751.90 | 1773.80 | 0 |
1996-05-28 | Perforation | 1857.10 | 1857.80 | 13 |
1996-05-28 | Perforation | 1862.00 | 1862.90 | 13 |
1996-06-04 | Packing Device Capped w/Cement | 1831.50 | 1839.50 | 0 |
1996-06-04 | Perforation | 1738.00 | 1745.90 | 18 |
1967-05-05 | Perforation | 1857.10 | 1857.80 | 7 |
1996-06-05 | Acid Treatment | 1738.00 | 1745.90 | 0 |
1996-06-08 | Cement Squeeze | 1738.00 | 1745.90 | 0 |
1996-06-12 | Perforation | 1857.10 | 1857.80 | 13 |
1996-06-12 | Perforation | 1862.00 | 1862.90 | 13 |
1996-06-15 | Cement Squeeze | 1857.10 | 1862.90 | 0 |
1996-06-18 | Perforation | 1854.00 | 1855.00 | 13 |
1996-06-20 | Acid Treatment | 1854.00 | 1855.00 | 0 |
1997-10-01 | Cement Plug | 1691.00 | 1750.00 | 0 |
1967-05-08 | Acid Treatment | 1857.10 | 1857.80 | 0 |
1967-05-09 | Perforation | 1857.10 | 1857.80 | 13 |
1967-08-06 | Perforation | 1784.60 | 1787.30 | 7 |
1967-08-11 | Acid Treatment | 1784.60 | 1787.30 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1967 | 0 | 0.0 | 0.0 | 0.0 |
1975 | 120 | 0.0 | 0.0 | 0.0 |
1991 | 2858 | 0.0 | 0.0 | 0.0 |
1992 | 8074 | 0.0 | 0.0 | 0.0 |
1993 | 7753 | 0.0 | 0.0 | 0.0 |
1994 | 7746 | 0.0 | 0.0 | 0.0 |
1995 | 1519 | 0.0 | 0.0 | 0.0 |
For data sources see[5]