If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 1076103612000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":58.334697,"lon":-119.529931,"icon":""}]} |
Location: 00/12-36-107-10W6/0 | |
Location Alias: 00/12-36-07-10 W6M | |
Location Alias 2: 00/12-36-107-10 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 107 | |
Meridian: 6 | |
Range: 10 | |
Section: 36 | |
County/Municipality: Mackenzie County | |
Well Name: HUSKY RAINBOW SOUTH 12-36-107-10 | |
Operator Name: Husky Oil Operations Limited | |
License Number: 0031559 | |
License Date: 1967-01-03 | |
License Status: Issued | |
Spud Date: 1967-01-04 | |
Final Drill Date: 1967-02-06 | |
Well Total Depth: 2004.10 m | |
Surface Hole Latitude: 58.334697 | |
Surface Hole Longitude: -119.529931 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1967-01-03 | Obtained License |
1967-01-20 | Drill Stem Test Performed |
1967-01-21 | Drill Stem Test Performed |
1967-01-22 | Drill Stem Test Performed |
1967-02-06 | Finished Drilling |
1967-02-06 | Well Mode changed to Drilled and Cased |
1967-02-09 | Liner Casing Operation Performed |
1967-02-21 | Perforation Treatment Performed - Cement Squeeze |
1967-02-21 | Perforation Treatment Performed - Jet Perforation |
1967-02-22 | Perforation Treatment Performed - Cement Squeeze |
1967-02-24 | Perforation Treatment Performed - Cement Squeeze |
1967-02-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1967-02-25 | Perforation Treatment Performed - Cement Squeeze |
1967-02-25 | Perforation Treatment Performed - Jet Perforation |
1967-03-01 | Perforation Treatment Performed - Jet Perforation |
1967-03-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1967-03-03 | Well Began Production |
1967-03-03 | Well Fluid changed to Crude Oil |
1967-03-03 | Well Mode changed to Flowing |
1967-06-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1967-06-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1968-12-20 | Perforation Treatment Performed - Jet Perforation |
1968-12-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1969-02-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1969-02-27 | Perforation Treatment Performed - Jet Perforation |
1969-04-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1973-05-12 | Well Fluid changed to Crude Oil |
1973-05-12 | Well Mode changed to Pumping |
1974-09-02 | Perforation Treatment Performed - Cement Squeeze |
1974-09-03 | Perforation Treatment Performed - Jet Perforation |
1974-09-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1978-12-20 | Perforation Treatment Performed - Jet Perforation |
1989-06-27 | Well Fluid changed to Crude Oil |
1989-06-27 | Well Mode changed to Flowing |
1989-09-02 | Perforation Treatment Performed - Cement Squeeze |
1989-09-05 | Perforation Treatment Performed - Jet Perforation |
1989-09-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-09-10 | Perforation Treatment Performed - Cement Squeeze |
1989-09-13 | Perforation Treatment Performed - Jet Perforation |
1989-09-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-09-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1994-07-23 | Well Log Performed |
1994-07-24 | Perforation Treatment Performed - Jet Perforation |
1994-07-24 | Well Log Performed |
1994-07-26 | Perforation Treatment Performed - Cement Squeeze |
1994-08-01 | Well Log Performed |
1994-08-02 | Perforation Treatment Performed - Jet Perforation |
1994-08-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1994-08-03 | Well Log Performed |
1994-08-04 | Well Log Performed |
1994-08-06 | Perforation Treatment Performed - Cement Squeeze |
1994-08-09 | Well Log Performed |
1994-08-10 | Perforation Treatment Performed - Jet Perforation |
1994-08-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1994-08-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1994-08-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1994-08-15 | Well Log Performed |
1995-03-09 | Well Log Performed |
1995-09-06 | Perforation Treatment Performed - Jet Perforation |
1995-09-06 | Well Log Performed |
2010-01-17 | Well Fluid changed to Crude Oil |
2010-01-17 | Well Mode changed to Gas Lift |
2010-06-17 | Perforation Treatment Performed - Remedial Casing |
2010-06-23 | Well Log Performed |
2010-06-27 | Well Log Performed |
2011-04-22 | Well Log Performed |
2013-08-06 | Perforation Treatment Performed - Chemical Squeeze |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1967-02-21 | Perforation | 1976.00 | 1976.30 | 7 |
1967-06-20 | Acid Treatment | 1948.30 | 1951.30 | 7 |
1967-06-21 | Acid Treatment | 1948.30 | 1951.30 | 0 |
1968-12-20 | Perforation | 1933.30 | 1935.80 | 7 |
1968-12-30 | Acid Treatment | 1933.30 | 1935.80 | 0 |
1968-12-30 | Acid Treatment | 1948.30 | 1951.30 | 0 |
1969-02-27 | Perforation | 1958.00 | 1959.60 | 7 |
1969-02-27 | Perforation | 1972.10 | 1975.10 | 7 |
1969-02-27 | Acid Treatment | 1958.00 | 1975.10 | 0 |
1969-04-19 | Acid Treatment | 1958.00 | 1975.10 | 0 |
1974-09-02 | Cement Squeeze | 1958.00 | 1975.10 | 0 |
1967-02-21 | Cement Squeeze | 1976.00 | 1976.30 | 0 |
1974-09-03 | Perforation | 1880.60 | 1889.80 | 7 |
1974-09-03 | Perforation | 1920.80 | 1923.90 | 7 |
1974-09-03 | Perforation | 1928.20 | 1931.20 | 7 |
1974-09-04 | Acid Treatment | 1920.80 | 1931.20 | 0 |
1974-09-04 | Acid Treatment | 1880.60 | 1889.80 | 0 |
1978-12-20 | Perforation | 1906.80 | 1912.50 | 6 |
1978-12-20 | Perforation | 1891.20 | 1895.60 | 6 |
1989-09-02 | Cement Squeeze | 1880.60 | 1951.30 | 0 |
1989-09-05 | Perforation | 1880.60 | 1885.80 | 13 |
1989-09-05 | Perforation | 1885.70 | 1889.20 | 13 |
1967-02-22 | Cement Squeeze | 1976.00 | 1976.30 | 0 |
1989-09-05 | Perforation | 1891.60 | 1895.10 | 13 |
1989-09-06 | Acid Treatment | 1891.60 | 1895.10 | 0 |
1989-09-10 | Cement Squeeze | 1880.60 | 1895.10 | 0 |
1989-09-13 | Perforation | 1881.00 | 1886.00 | 13 |
1989-09-14 | Acid Treatment | 1881.00 | 1886.00 | 0 |
1989-09-16 | Acid Treatment | 1881.00 | 1886.00 | 0 |
1994-07-24 | Perforation | 1892.80 | 1896.50 | 13 |
1994-07-24 | Perforation | 1908.30 | 1912.50 | 13 |
1994-07-26 | Cement Squeeze | 1881.00 | 1912.50 | 0 |
1994-08-02 | Perforation | 1881.60 | 1886.00 | 13 |
1967-02-24 | Cement Squeeze | 1976.00 | 1976.30 | 0 |
1994-08-02 | Perforation | 1892.80 | 1896.50 | 13 |
1994-08-02 | Perforation | 1908.30 | 1912.50 | 13 |
1994-08-02 | Perforation | 1920.80 | 1923.90 | 13 |
1994-08-03 | Acid Treatment | 1881.60 | 1923.90 | 0 |
1994-08-06 | Cement Squeeze | 1881.00 | 1923.90 | 0 |
1994-08-10 | Perforation | 1881.60 | 1886.00 | 13 |
1994-08-10 | Perforation | 1892.80 | 1896.50 | 13 |
1994-08-10 | Perforation | 1908.30 | 1912.50 | 13 |
1994-08-10 | Perforation | 1920.80 | 1923.90 | 13 |
1994-08-11 | Acid Treatment | 1881.60 | 1923.90 | 0 |
1967-02-25 | Perforation | 1916.00 | 1916.30 | 7 |
1994-08-12 | Acid Treatment | 1881.60 | 1896.50 | 0 |
1994-08-13 | Acid Treatment | 1892.80 | 1896.50 | 0 |
1995-09-06 | Perforation | 500.00 | 500.30 | 99 |
1995-09-06 | Perforation | 460.00 | 460.30 | 99 |
2010-06-17 | Remedial Casing Cementing | 460.00 | 460.30 | 0 |
2010-06-17 | Remedial Casing Cementing | 500.00 | 500.30 | 0 |
2013-08-06 | Chemical Squeeze | 1881.60 | 1923.90 | 0 |
1967-02-25 | Acid Treatment | 1916.00 | 1916.30 | 0 |
1967-02-25 | Cement Squeeze | 1916.00 | 1916.30 | 0 |
1967-03-01 | Perforation | 1948.30 | 1951.30 | 7 |
1967-03-02 | Acid Treatment | 1948.30 | 1951.30 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1967 | 2544 | 0.0 | 0.0 | 0.0 |
1968 | 6217 | 0.0 | 0.0 | 0.0 |
1969 | 6684 | 0.0 | 0.0 | 0.0 |
1970 | 6810 | 0.0 | 0.0 | 0.0 |
1971 | 7865 | 0.0 | 0.0 | 0.0 |
1972 | 6263 | 0.0 | 0.0 | 0.0 |
1973 | 3740 | 0.0 | 0.0 | 0.0 |
1974 | 6883 | 0.0 | 0.0 | 0.0 |
1975 | 7356 | 0.0 | 0.0 | 0.0 |
1976 | 6420 | 0.0 | 0.0 | 0.0 |
1977 | 5796 | 0.0 | 0.0 | 0.0 |
1978 | 7152 | 0.0 | 0.0 | 0.0 |
1979 | 4125 | 0.0 | 0.0 | 0.0 |
1980 | 8528 | 0.0 | 0.0 | 0.0 |
1981 | 7225 | 0.0 | 0.0 | 0.0 |
1982 | 8332 | 0.0 | 0.0 | 0.0 |
1983 | 8290 | 0.0 | 0.0 | 0.0 |
1984 | 7482 | 0.0 | 0.0 | 0.0 |
1985 | 4596 | 0.0 | 0.0 | 0.0 |
1986 | 7645 | 0.0 | 0.0 | 0.0 |
1987 | 8113 | 0.0 | 0.0 | 0.0 |
1988 | 7624 | 0.0 | 0.0 | 0.0 |
1989 | 5874 | 0.0 | 0.0 | 0.0 |
1990 | 8384 | 0.0 | 0.0 | 0.0 |
1991 | 3412 | 0.0 | 0.0 | 0.0 |
1994 | 4156 | 0.0 | 0.0 | 0.0 |
1995 | 6319 | 0.0 | 0.0 | 0.0 |
1996 | 8709 | 0.0 | 0.0 | 0.0 |
1997 | 8444 | 0.0 | 0.0 | 0.0 |
1998 | 3550 | 0.0 | 0.0 | 0.0 |
1999 | 7421 | 0.0 | 0.0 | 0.0 |
2000 | 6847 | 0.0 | 0.0 | 0.0 |
2001 | 1236 | 0.0 | 0.0 | 0.0 |
2002 | 3406 | 0.0 | 0.0 | 0.0 |
2003 | 7834 | 0.0 | 0.0 | 0.0 |
2004 | 8201 | 0.0 | 0.0 | 0.0 |
2005 | 8446 | 0.0 | 0.0 | 0.0 |
2006 | 7645 | 0.0 | 0.0 | 0.0 |
2007 | 8300 | 0.0 | 0.0 | 0.0 |
2008 | 4565 | 0.0 | 0.0 | 0.0 |
2010 | 1030 | 0.0 | 0.0 | 0.0 |
2011 | 617 | 0.0 | 0.0 | 0.0 |
2012 | 6716 | 0.0 | 0.0 | 0.0 |
2013 | 2707 | 0.0 | 0.0 | 0.0 |
2014 | 1583 | 0.0 | 0.0 | 0.0 |
2015 | 5871 | 0.0 | 0.0 | 0.0 |
2016 | 8113 | 0.0 | 0.0 | 0.0 |
2017 | 7708 | 0.0 | 0.0 | 0.0 |
2018 | 3001 | 0.0 | 0.0 | 0.0 |
2019 | 2068 | 0.0 | 0.0 | 0.0 |
2020 | 920 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-08-06 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]