X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1076103605000

Well Details

Well ID: 1076103605000
Loading map...
Location: 00/05-36-107-10W6/0
Location Alias: 00/05-36-07-10 W6M
Location Alias 2: 00/05-36-107-10 W6/00
Country: Canada
Province: Alberta
Township: 107
Meridian: 6
Range: 10
Section: 36
County/Municipality: Mackenzie County
Well Name: HUSKY MOCIL RAIN 5-36-107-10
Operator Name: Husky Oil Operations Limited
License Number: 0031205
License Date: 1966-10-28
License Status: Suspension
Spud Date: 1966-11-03
Final Drill Date: 1966-12-16
Well Total Depth: 2148.50 m
Surface Hole Latitude: 58.332181
Surface Hole Longitude: -119.533912

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-10-28 Obtained License
1966-11-26 Drill Stem Test Performed
1966-11-29 Drill Stem Test Performed
1966-12-02 Drill Stem Test Performed
1966-12-03 Drill Stem Test Performed
1966-12-09 Drill Stem Test Performed
1966-12-10 Drill Stem Test Performed
1966-12-12 Drill Stem Test Performed
1966-12-16 Finished Drilling
1966-12-16 Well Mode changed to Drilled and Cased
1966-12-18 Liner Casing Operation Performed
1967-01-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-01-17 Perforation Treatment Performed - Jet Perforation
1967-01-22 Perforation Treatment Performed - Jet Perforation
1967-01-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-01-30 Perforation Treatment Performed - Jet Perforation
1967-01-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-01-31 Perforation Treatment Performed - Jet Perforation
1967-03-02 Well Began Production
1967-03-02 Well Fluid changed to Crude Oil
1967-03-02 Well Mode changed to Flowing
1972-03-19 Perforation Treatment Performed - Cement Squeeze
1972-03-20 Perforation Treatment Performed - Cement Squeeze
1972-03-31 Perforation Treatment Performed - Jet Perforation
1972-04-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-06-01 Well Began Injection
1972-06-01 Well Fluid changed to Water
1972-06-01 Well Type changed to Injection
1991-05-29 Perforation Treatment Performed - Jet Perforation
1991-05-30 Perforation Treatment Performed - Jet Perforation
1991-05-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-06-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-06-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-06-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-06-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-06-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-06-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-06-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-10-17 Well Fluid changed to Water
1991-10-17 Well Type changed to Injection
1993-12-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-06-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-06-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-06-16 Plug Back Performed
1999-06-16 Well Fluid changed to Water
1999-06-16 Well Log Performed
1999-06-16 Well Mode changed to Abandoned Zone
1999-06-16 Well Type changed to Injection
1999-06-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-07-06 Well Log Performed
2008-07-05 Well Log Performed
2008-07-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-07-25 Perforation Treatment Performed - Cement Squeeze

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1967-01-17 Perforation 2011.70 2012.30 3
1967-01-31 Perforation 1857.50 1858.10 7
1967-01-31 Perforation 1860.50 1861.10 7
1967-01-31 Perforation 1866.00 1866.60 7
1967-01-31 Acid Treatment 1857.50 1866.60 0
1972-03-19 Cement Squeeze 2011.70 2012.30 0
1972-03-20 Cement Squeeze 1985.20 1989.10 0
1972-03-20 Cement Squeeze 1924.20 1930.00 0
1972-03-20 Cement Squeeze 1857.50 1866.60 0
1972-03-31 Perforation 2026.30 2035.50 7
1972-04-02 Acid Treatment 2026.30 2035.50 0
1967-01-17 Acid Treatment 2011.70 2012.30 0
1991-05-29 Perforation 1935.00 1937.00 13
1991-05-29 Perforation 1939.50 1940.50 13
1991-05-29 Perforation 1944.00 1952.00 13
1991-05-29 Perforation 1955.00 1957.00 13
1991-05-29 Perforation 1959.00 1961.00 13
1991-05-29 Perforation 1963.50 1965.50 13
1991-05-29 Perforation 1967.50 1971.50 13
1991-05-29 Perforation 1973.50 1974.50 13
1991-05-29 Perforation 1987.00 1989.50 13
1991-05-29 Perforation 1992.00 1993.00 13
1967-01-22 Perforation 1985.20 1985.80 3
1991-05-30 Perforation 1909.50 1911.50 13
1991-05-30 Perforation 1915.00 1917.00 13
1991-05-30 Perforation 1918.00 1921.50 13
1991-05-30 Perforation 1924.50 1933.00 13
1991-05-31 Acid Treatment 1987.00 1993.00 0
1991-06-02 Acid Treatment 1963.50 1993.00 0
1991-06-03 Acid Treatment 1955.00 1961.00 0
1991-06-04 Acid Treatment 1944.00 1952.00 0
1991-06-05 Acid Treatment 1935.00 1940.50 0
1991-06-06 Acid Treatment 1924.50 1933.00 0
1967-01-22 Perforation 1987.90 1989.10 3
1991-06-07 Acid Treatment 1915.00 1921.50 0
1991-06-08 Acid Treatment 1909.50 1911.50 0
1993-12-03 Acid Treatment 1909.50 1911.50 0
1999-06-16 Packing Device Capped w/Cement 2002.00 2010.00 0
1999-06-16 Acid Treatment 1909.50 1974.50 0
1999-06-22 Acid Treatment 1909.50 1974.50 0
2008-07-11 Acid Treatment 1935.00 1937.00 0
2008-07-11 Acid Treatment 1939.50 1940.50 0
2008-07-11 Acid Treatment 1944.00 1952.00 0
2008-07-11 Acid Treatment 1955.00 1957.00 0
1967-01-26 Acid Treatment 1985.20 1989.10 0
2008-07-11 Acid Treatment 1959.00 1961.00 0
2008-07-11 Acid Treatment 1963.50 1965.50 0
2008-07-11 Acid Treatment 1967.50 1971.10 0
2008-07-11 Acid Treatment 1973.50 1974.50 0
2008-07-25 Cement Squeeze 1987.00 1993.00 0
1967-01-30 Perforation 1924.20 1924.80 7
1967-01-30 Perforation 1927.30 1927.90 7
1967-01-30 Perforation 1928.80 1930.00 7
1967-01-31 Acid Treatment 1924.20 1930.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1967 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0

For data sources see[5]

References