X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1076093211000

Well Details

Well ID: 1076093211000
Loading map...
Location: 00/11-32-107-09W6/0
Location Alias: 00/11-32-07-09 W6M
Location Alias 2: 00/11-32-107-09 W6/00
Country: Canada
Province: Alberta
Township: 107
Meridian: 6
Range: 09
Section: 32
County/Municipality: Mackenzie County
Well Name: HUSKY ET AL RAINS 6-5-108-9
Operator Name: Husky Oil Operations Limited
License Number: 0057889
License Date: 1976-04-21
License Status: Amended
Spud Date: 1976-04-27
Final Drill Date: 1976-05-20
Well Total Depth: 1999.50 m
Surface Hole Latitude: 58.333387
Surface Hole Longitude: -119.466885

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-04-21 Obtained License
1976-05-11 Kick Occurred
1976-05-20 Finished Drilling
1976-05-20 Well Mode changed to Drilled and Cased
1976-05-21 Liner Casing Operation Performed
1976-05-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-05-25 Perforation Treatment Performed - Jet Perforation
1976-06-30 Well Began Production
1976-06-30 Well Fluid changed to Crude Oil
1976-06-30 Well Mode changed to Flowing
1978-07-12 Perforation Treatment Performed - Jet Perforation
1979-07-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-07-23 Perforation Treatment Performed - Cement Squeeze
1984-07-25 Perforation Treatment Performed - Jet Perforation
1984-07-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-07-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-02-27 Perforation Treatment Performed - Jet Perforation
1985-02-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-07-25 Well Fluid changed to Crude Oil
1986-07-25 Well Mode changed to Pumping
1994-08-19 Well Log Performed
1994-08-20 Perforation Treatment Performed - Bridge Plug No Cement Required
1994-08-20 Well Fluid changed to Crude Oil
1994-08-20 Well Mode changed to Abandoned and Whipstocked
1994-09-15 Perforation Treatment Performed - Bridge Plug No Cement Required

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-05-25 Perforation 1928.80 1935.50 7
1984-07-25 Perforation 1910.50 1913.80 13
1984-07-25 Perforation 1914.80 1916.30 13
1984-07-27 Acid Treatment 1910.50 1916.30 0
1984-07-28 Acid Treatment 1910.50 1916.30 0
1985-02-27 Perforation 1905.30 1909.30 13
1985-02-27 Perforation 1898.60 1902.60 13
1985-02-27 Perforation 1895.60 1897.10 13
1985-02-27 Perforation 1892.50 1894.50 13
1985-02-27 Perforation 1886.70 1888.70 13
1985-02-28 Acid Treatment 1886.70 1902.60 0
1976-05-25 Perforation 1937.00 1943.10 7
1994-08-20 Bridge Plug, No Cement 1880.00 1880.00 0
1994-09-15 Bridge Plug, No Cement 1778.00 1778.00 0
1976-05-25 Acid Treatment 1928.80 1943.10 0
1978-07-12 Perforation 1910.50 1913.80 7
1978-07-12 Perforation 1914.80 1916.30 7
1978-07-12 Perforation 1917.20 1920.20 7
1978-07-12 Perforation 1922.10 1925.10 7
1979-07-16 Acid Treatment 1910.50 1935.50 0
1984-07-23 Cement Squeeze 1910.50 1943.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 4158 0.0 0.0 0.0
1977 4949 0.0 0.0 0.0
1978 6914 0.0 0.0 0.0
1979 6198 0.0 0.0 0.0
1980 2827 0.0 0.0 0.0
1981 297 0.0 0.0 0.0
1984 3046 0.0 0.0 0.0
1985 6373 0.0 0.0 0.0
1986 8103 0.0 0.0 0.0
1987 8478 0.0 0.0 0.0
1988 2961 0.0 0.0 0.0
1989 6523 0.0 0.0 0.0
1990 6684 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1976-05-11 Kick 1874.20 1874.20

For data sources see[6]

References