If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 1076093211000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":58.333387,"lon":-119.466885,"icon":""}]} |
Location: 00/11-32-107-09W6/0 | |
Location Alias: 00/11-32-07-09 W6M | |
Location Alias 2: 00/11-32-107-09 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 107 | |
Meridian: 6 | |
Range: 09 | |
Section: 32 | |
County/Municipality: Mackenzie County | |
Well Name: HUSKY ET AL RAINS 6-5-108-9 | |
Operator Name: Husky Oil Operations Limited | |
License Number: 0057889 | |
License Date: 1976-04-21 | |
License Status: Amended | |
Spud Date: 1976-04-27 | |
Final Drill Date: 1976-05-20 | |
Well Total Depth: 1999.50 m | |
Surface Hole Latitude: 58.333387 | |
Surface Hole Longitude: -119.466885 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1976-04-21 | Obtained License |
1976-05-11 | Kick Occurred |
1976-05-20 | Finished Drilling |
1976-05-20 | Well Mode changed to Drilled and Cased |
1976-05-21 | Liner Casing Operation Performed |
1976-05-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1976-05-25 | Perforation Treatment Performed - Jet Perforation |
1976-06-30 | Well Began Production |
1976-06-30 | Well Fluid changed to Crude Oil |
1976-06-30 | Well Mode changed to Flowing |
1978-07-12 | Perforation Treatment Performed - Jet Perforation |
1979-07-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1984-07-23 | Perforation Treatment Performed - Cement Squeeze |
1984-07-25 | Perforation Treatment Performed - Jet Perforation |
1984-07-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1984-07-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1985-02-27 | Perforation Treatment Performed - Jet Perforation |
1985-02-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-07-25 | Well Fluid changed to Crude Oil |
1986-07-25 | Well Mode changed to Pumping |
1994-08-19 | Well Log Performed |
1994-08-20 | Perforation Treatment Performed - Bridge Plug No Cement Required |
1994-08-20 | Well Fluid changed to Crude Oil |
1994-08-20 | Well Mode changed to Abandoned and Whipstocked |
1994-09-15 | Perforation Treatment Performed - Bridge Plug No Cement Required |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1976-05-25 | Perforation | 1928.80 | 1935.50 | 7 |
1984-07-25 | Perforation | 1910.50 | 1913.80 | 13 |
1984-07-25 | Perforation | 1914.80 | 1916.30 | 13 |
1984-07-27 | Acid Treatment | 1910.50 | 1916.30 | 0 |
1984-07-28 | Acid Treatment | 1910.50 | 1916.30 | 0 |
1985-02-27 | Perforation | 1905.30 | 1909.30 | 13 |
1985-02-27 | Perforation | 1898.60 | 1902.60 | 13 |
1985-02-27 | Perforation | 1895.60 | 1897.10 | 13 |
1985-02-27 | Perforation | 1892.50 | 1894.50 | 13 |
1985-02-27 | Perforation | 1886.70 | 1888.70 | 13 |
1985-02-28 | Acid Treatment | 1886.70 | 1902.60 | 0 |
1976-05-25 | Perforation | 1937.00 | 1943.10 | 7 |
1994-08-20 | Bridge Plug, No Cement | 1880.00 | 1880.00 | 0 |
1994-09-15 | Bridge Plug, No Cement | 1778.00 | 1778.00 | 0 |
1976-05-25 | Acid Treatment | 1928.80 | 1943.10 | 0 |
1978-07-12 | Perforation | 1910.50 | 1913.80 | 7 |
1978-07-12 | Perforation | 1914.80 | 1916.30 | 7 |
1978-07-12 | Perforation | 1917.20 | 1920.20 | 7 |
1978-07-12 | Perforation | 1922.10 | 1925.10 | 7 |
1979-07-16 | Acid Treatment | 1910.50 | 1935.50 | 0 |
1984-07-23 | Cement Squeeze | 1910.50 | 1943.10 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1976 | 4158 | 0.0 | 0.0 | 0.0 |
1977 | 4949 | 0.0 | 0.0 | 0.0 |
1978 | 6914 | 0.0 | 0.0 | 0.0 |
1979 | 6198 | 0.0 | 0.0 | 0.0 |
1980 | 2827 | 0.0 | 0.0 | 0.0 |
1981 | 297 | 0.0 | 0.0 | 0.0 |
1984 | 3046 | 0.0 | 0.0 | 0.0 |
1985 | 6373 | 0.0 | 0.0 | 0.0 |
1986 | 8103 | 0.0 | 0.0 | 0.0 |
1987 | 8478 | 0.0 | 0.0 | 0.0 |
1988 | 2961 | 0.0 | 0.0 | 0.0 |
1989 | 6523 | 0.0 | 0.0 | 0.0 |
1990 | 6684 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1976-05-11 | Kick | 1874.20 | 1874.20 |
For data sources see[6]