X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1076093207002

Well Details

Well ID: 1076093207002
Loading map...
Location: 00/07-32-107-09W6/2
Location Alias: 00/07-32-07-09 W6M
Location Alias 2: 00/07-32-107-09 W6/02
Country: Canada
Province: Alberta
Township: 107
Meridian: 6
Range: 09
Section: 32
County/Municipality: Mackenzie County
Well Name: HUSKY IOE RAINBOWS 7-32-107-9
Operator Name: Husky Oil Operations Limited
License Number: 0030052
License Date: 1966-02-18
License Status: Amended
Spud Date: 1966-02-23
Final Drill Date: 1966-04-23
Well Total Depth: 2100.00 m
Surface Hole Latitude: 58.327712
Surface Hole Longitude: -119.460513

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-02-18 Obtained License
1966-02-23 Direction Drilling Operation Performed - 98
1966-04-03 Perforation Treatment Performed - Jet Perforation
1966-04-23 Finished Drilling
1966-04-27 Production Casing Operation Performed
1966-05-06 Perforation Treatment Performed - Acid Wash - No Pressure
1966-05-17 Well Mode changed to Drilled and Cased
1973-01-09 Perforation Treatment Performed - Cement Squeeze
1973-01-26 Perforation Treatment Performed - Open-Hole Completion
1973-01-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-02-07 Well Began Injection
1973-02-07 Well Fluid changed to Water
1973-02-07 Well Type changed to Injection
1986-02-04 Liner Casing Operation Performed
1986-02-06 Perforation Treatment Performed - Cement Squeeze
1986-02-10 Perforation Treatment Performed - Cement Squeeze
1986-02-22 Perforation Treatment Performed - Jet Perforation
1986-02-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-02-26 Perforation Treatment Performed - Jet Perforation
1986-02-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-02-28 Perforation Treatment Performed - Fractured
2008-08-07 Well Log Performed
2008-08-10 Well Log Performed
2008-08-13 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1966-02-23 1402.10 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-04-03 Perforation 2001.30 2001.90 7
1986-02-26 Perforation 2065.00 2075.00 13
1986-02-27 Acid Treatment 2065.00 2075.00 0
1986-02-28 Fracture 2065.00 2075.00 0
1966-05-06 Acid Wash 2001.30 2001.90 0
1973-01-09 Cement Squeeze 2001.30 2001.90 0
1973-01-26 Open Hole/Barefoot Completion 2021.70 2066.50 0
1973-01-30 Acid Treatment 2021.70 2066.50 0
1986-02-06 Cement Squeeze 1981.20 2099.30 0
1986-02-10 Cement Squeeze 1933.00 2099.30 0
1986-02-22 Perforation 2065.00 2075.00 13
1986-02-25 Acid Treatment 2065.00 2075.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[6]

References