1076093206022

Well Details

Well ID: 1076093206022
Loading map...
Location: 02/06-32-107-09W6/2
Location Alias: 02/06-32-07-09 W6M
Location Alias 2: 02/06-32-107-09 W6/02
Country: Canada
Province: Alberta
Township: 107
Meridian: 6
Range: 09
Section: 32
County/Municipality: Mackenzie County
Well Name: HUSKY ET AL RAINS 6-32-107-9
Operator Name: Husky Oil Operations Limited
License Number: 0119237
License Date: 1985-11-13
License Status: Abandoned
Spud Date: 1985-11-16
Final Drill Date: 1985-12-23
Well Total Depth: 2005.00 m
Surface Hole Latitude: 58.332249
Surface Hole Longitude: -119.465935

For data sources see[1][2]

Well History

Date Event
1985-11-13 Obtained License
1985-11-17 Surface Casing Operation Performed
1985-12-01 Well Log Performed
1985-12-02 Intermediate Casing Operation Performed
1985-12-08 Kick Occurred
1985-12-12 Well Log Performed
1985-12-16 Kick Occurred
1985-12-23 Finished Drilling
1985-12-23 Lost Circulation Occurred
1985-12-23 Well Mode changed to Drilled and Cased
1985-12-24 Well Log Performed
1985-12-25 Liner Casing Operation Performed
1985-12-26 Rig Released
1986-02-08 Perforation Treatment Performed - Jet Perforation
1986-02-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-02-15 Perforation Treatment Performed - Jet Perforation
1986-02-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-07-14 Perforation Treatment Performed - Cement Squeeze
1986-07-18 Perforation Treatment Performed - Jet Perforation
1986-07-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-05-28 Perforation Treatment Performed - Jet Perforation
1992-05-28 Well Log Performed
1992-05-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-06-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-06-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-06-08 Well Log Performed
2000-09-14 Well Log Performed
2000-09-15 Perforation Treatment Performed - Cement Squeeze
2000-09-18 Perforation Treatment Performed - Jet Perforation
2000-09-18 Well Log Performed
2000-09-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-09-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-09-24 Perforation Treatment Performed - Cement Squeeze
2000-09-24 Well Log Performed
2000-09-29 Perforation Treatment Performed - Jet Perforation
2000-09-29 Well Log Performed
2000-09-30 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-11-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-11-20 Well Log Performed
2007-11-21 Perforation Treatment Performed - Jet Perforation
2007-11-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-11-24 Well Fluid changed to Gas
2007-11-24 Well Mode changed to Testing
2008-07-06 Well Began Production
2008-07-06 Well Fluid changed to Gas
2008-07-06 Well Mode changed to Flowing
2016-07-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-07-21 Plug Back Performed
2016-07-21 Well Fluid changed to Gas
2016-07-21 Well Log Performed
2016-07-21 Well Mode changed to Abandoned Zone
2016-07-22 Well Log Performed
2016-10-15 Well Abandoned
2016-10-15 Well Fluid changed to Gas
2016-10-15 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-02-08 Perforation 1914.00 1918.00 13
1992-05-28 Perforation 1884.00 1887.00 13
1992-05-28 Perforation 1896.00 1898.00 13
1992-05-31 Acid Treatment 1896.00 1898.00 0
1992-06-02 Acid Treatment 1869.00 1887.00 0
1992-06-05 Acid Treatment 1896.00 1898.00 0
2000-09-15 Cement Squeeze 1869.00 1898.00 0
2000-09-18 Perforation 1885.00 1887.00 13
2000-09-18 Perforation 1878.00 1881.00 13
2000-09-18 Perforation 1869.50 1871.50 13
2000-09-19 Acid Treatment 1885.00 1887.00 0
1986-02-08 Perforation 1923.00 1926.00 13
2000-09-19 Acid Treatment 1878.00 1881.00 0
2000-09-20 Acid Treatment 1869.50 1871.50 0
2000-09-24 Cement Squeeze 1869.50 1887.00 0
2000-09-29 Perforation 1884.00 1886.00 13
2000-09-29 Perforation 1877.00 1880.00 13
2000-09-29 Perforation 1867.50 1870.50 13
2000-09-30 Acid Treatment 1884.00 1886.00 0
2000-09-30 Acid Treatment 1877.00 1880.00 0
2000-09-30 Acid Treatment 1867.00 1870.50 0
2007-11-20 Packing Device Capped w/Cement 1837.00 1845.00 0
1986-02-12 Acid Treatment 1914.00 1918.00 0
2007-11-21 Perforation 1770.50 1772.00 13
2007-11-22 Acid Treatment 1770.50 1772.00 0
2016-07-21 Packing Device Capped w/Cement 1788.00 1796.00 0
2016-07-21 Packing Device Capped w/Cement 1755.00 1763.00 0
1986-02-15 Perforation 1903.00 1908.00 13
1986-02-16 Acid Treatment 1903.00 1908.00 0
1986-07-14 Cement Squeeze 1903.00 1908.00 0
1986-07-18 Perforation 1903.00 1907.00 13
1986-07-19 Acid Treatment 1903.00 1907.00 0
1992-05-28 Perforation 1869.00 1872.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 1420 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1985-12-08 Kick 1883.80 1883.80
1985-12-16 Kick 1898.70 1898.70
1985-12-23 Lost Circulation 2005.00 2005.00
2016-07-23 No Incident Encountered 0.00 0.00

For data sources see[6]

References