X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1076092616002

Well Details

Well ID: 1076092616002
Loading map...
Location: 00/16-26-107-09W6/2
Location Alias: 00/16-26-07-09 W6M
Location Alias 2: 00/16-26-107-09 W6/02
Country: Canada
Province: Alberta
Township: 107
Meridian: 6
Range: 09
Section: 26
County/Municipality: Mackenzie County
Well Name: HUSKY RAINBOWS 16-26-107-9
Operator Name: Husky Oil Operations Limited
License Number: 0029558
License Date: 1965-12-07
License Status: Suspension
Spud Date: 1966-01-03
Final Drill Date: 1966-03-25
Well Total Depth: 2254.00 m
Surface Hole Latitude: 58.323568
Surface Hole Longitude: -119.370888

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-12-07 Obtained License
1966-02-14 Liner Casing Operation Performed
1966-02-21 Drill Stem Test Performed
1966-02-23 Drill Stem Test Performed
1966-03-02 Drill Stem Test Performed
1966-03-25 Finished Drilling
1966-03-25 Well Mode changed to Drilled and Cased
1966-04-01 Perforation Treatment Performed - Jet Perforation
1966-04-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-04-12 Perforation Treatment Performed - Cement Squeeze
1966-04-14 Perforation Treatment Performed - Jet Perforation
1966-04-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-04-17 Perforation Treatment Performed - Cement Squeeze
1966-04-20 Perforation Treatment Performed - Jet Perforation
1966-04-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-05-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-05-03 Perforation Treatment Performed - Jet Perforation
1966-05-08 Perforation Treatment Performed - Cement Squeeze
1966-05-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-05-10 Perforation Treatment Performed - Jet Perforation
1966-05-15 Perforation Treatment Performed - Cement Squeeze
1966-05-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-05-16 Perforation Treatment Performed - Jet Perforation
1966-05-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-05-20 Perforation Treatment Performed - Cement Squeeze
1966-05-20 Perforation Treatment Performed - Jet Perforation
1966-05-24 Perforation Treatment Performed - Cement Squeeze
1966-05-28 Perforation Treatment Performed - Acid Wash - No Pressure
1966-05-28 Perforation Treatment Performed - Cement Squeeze
1969-02-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1969-02-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-02-13 Perforation Treatment Performed - Jet Perforation
1969-02-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-02-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-02-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-02-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-02-25 Perforation Treatment Performed - Jet Perforation
1969-03-10 Well Began Production
1969-03-10 Well Fluid changed to Crude Oil
1969-03-10 Well Mode changed to Flowing
1969-03-26 Well Fluid changed to Crude Oil
1969-03-26 Well Mode changed to Flowing
1972-02-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1972-02-07 Well Fluid changed to Crude Oil
1972-02-07 Well Mode changed to Flowing
1990-10-14 Well Log Performed
1990-11-09 Well Log Performed
1990-11-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-11-28 Plug Back Performed
1990-11-28 Well Fluid changed to Crude Oil
1990-11-28 Well Mode changed to Abandoned Zone
1995-05-11 Perforation Treatment Performed - Cement Squeeze
1995-05-11 Plug Back Performed
1995-05-12 Well Log Performed
1995-05-14 Perforation Treatment Performed - Jet Perforation
1995-05-18 Well Fluid changed to Crude Oil
1995-05-18 Well Mode changed to Flowing
2000-01-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-03-05 Well Fluid changed to Crude Oil
2002-03-05 Well Mode changed to Pumping
2011-09-28 Well Fluid changed to Crude Oil
2011-09-28 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-04-01 Perforation 2029.40 2030.60 7
1966-05-03 Acid Treatment 1886.70 1889.80 0
1966-05-08 Cement Squeeze 1886.70 1889.80 0
1966-05-10 Perforation 1869.30 1870.90 0
1966-05-10 Acid Treatment 1869.30 1870.90 0
1966-05-15 Cement Squeeze 1869.30 1870.90 0
1966-05-16 Perforation 1817.80 1820.90 7
1966-05-16 Acid Treatment 1817.80 1820.90 0
1966-05-20 Cement Squeeze 1817.80 1820.90 0
1966-05-20 Perforation 1773.90 1777.00 7
1966-05-20 Acid Treatment 1773.90 1777.00 0
1966-04-11 Acid Treatment 2029.40 2030.60 0
1966-05-24 Cement Squeeze 1773.90 1777.00 0
1966-05-28 Acid Wash 1869.30 1870.90 0
1966-05-28 Cement Squeeze 1869.30 1870.90 0
1969-02-07 Packing Device Capped w/Cement 1966.00 1966.00 7
1969-02-13 Perforation 1817.50 1818.10 7
1969-02-13 Perforation 1819.40 1823.30 7
1969-02-13 Acid Treatment 1817.50 1823.30 0
1969-02-14 Acid Treatment 1817.50 1823.30 0
1969-02-19 Acid Treatment 1817.50 1823.30 0
1969-02-24 Acid Treatment 1817.50 1823.30 0
1966-04-12 Cement Squeeze 2029.40 2030.60 0
1969-02-25 Perforation 1773.90 1777.00 7
1969-02-25 Acid Treatment 1773.90 1777.00 0
1972-02-07 Packing Device Capped w/Cement 1842.80 1845.90 0
1990-11-28 Packing Device Capped w/Cement 1824.00 1832.00 0
1990-11-28 Packing Device Capped w/Cement 1778.30 1779.80 0
1995-05-11 Cement Squeeze 1773.90 1777.00 0
1995-05-14 Perforation 1817.50 1823.30 7
2000-01-22 Acid Treatment 1811.00 1840.10 0
1966-04-14 Perforation 2019.00 2023.90 7
1966-04-16 Acid Treatment 2019.00 2023.90 0
1966-04-17 Cement Squeeze 2019.00 2023.90 0
1966-04-20 Perforation 1969.00 1975.10 7
1966-04-21 Acid Treatment 1969.00 1975.10 0
1966-05-03 Perforation 1886.70 1889.80 3

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1969 1864 0.0 0.0 0.0
1970 3531 0.0 0.0 0.0
1971 1174 0.0 0.0 0.0
1972 1053 0.0 0.0 0.0
1973 589 0.0 0.0 0.0
1974 1371 0.0 0.0 0.0
1975 177 0.0 0.0 0.0
1976 38 0.0 0.0 0.0
1977 3 0.0 0.0 0.0
1978 40 0.0 0.0 0.0
1980 260 0.0 0.0 0.0
1981 300 0.0 0.0 0.0
1982 646 0.0 0.0 0.0
1983 724 0.0 0.0 0.0
1984 828 0.0 0.0 0.0
1985 773 0.0 0.0 0.0
1986 588 0.0 0.0 0.0
1987 105 0.0 0.0 0.0
1995 4822 0.0 0.0 0.0
1996 7513 0.0 0.0 0.0
1997 7333 0.0 0.0 0.0
1998 8082 0.0 0.0 0.0
1999 8042 0.0 0.0 0.0
2000 8206 0.0 0.0 0.0
2001 8588 0.0 0.0 0.0
2002 8315 0.0 0.0 0.0
2003 8037 0.0 0.0 0.0
2004 6359 0.0 0.0 0.0
2005 7892 0.0 0.0 0.0
2006 7114 0.0 0.0 0.0
2007 7073 0.0 0.0 0.0
2008 2563 0.0 0.0 0.0
2009 2402 0.0 0.0 0.0

For data sources see[5]

References