X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1076092102000

Well Details

Well ID: 1076092102000
Loading map...
Location: 00/02-21-107-09W6/0
Location Alias: 00/02-21-07-09 W6M
Location Alias 2: 00/02-21-107-09 W6/00
Country: Canada
Province: Alberta
Township: 107
Meridian: 6
Range: 09
Section: 21
County/Municipality: Mackenzie County
Well Name: HUSKY RAINS 4-21-107-9
Operator Name: Husky Oil Operations Limited
License Number: 0032531
License Date: 1967-07-26
License Status: Suspension
Spud Date: 1967-08-01
Final Drill Date: 1967-08-24
Well Total Depth: 1984.20 m
Surface Hole Latitude: 58.297753
Surface Hole Longitude: -119.433045

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1967-07-26 Obtained License
1967-08-20 Drill Stem Test Performed
1967-08-24 Finished Drilling
1967-08-24 Liner Casing Operation Performed
1967-08-24 Well Mode changed to Drilled and Cased
1967-08-31 Perforation Treatment Performed - Jet Perforation
1967-09-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-09-01 Perforation Treatment Performed - Cement Squeeze
1967-09-04 Perforation Treatment Performed - Jet Perforation
1967-09-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-09-05 Well Began Production
1967-09-05 Well Fluid changed to Crude Oil
1967-09-05 Well Mode changed to Flowing
1988-02-11 Well Log Performed
1989-08-30 Perforation Treatment Performed - Jet Perforation
1989-08-30 Well Log Performed
1989-08-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-09-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-09-09 Perforation Treatment Performed - Jet Perforation
1989-09-09 Well Log Performed
1989-09-11 Well Log Performed
1989-09-13 Perforation Treatment Performed - Cement Squeeze
1989-09-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-06-29 Well Fluid changed to Crude Oil
1990-06-29 Well Mode changed to Pumping
1991-12-08 Perforation Treatment Performed - Jet Perforation
1991-12-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-12-09 Perforation Treatment Performed - Jet Perforation
1991-12-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-12-13 Perforation Treatment Performed - Jet Perforation
1991-12-13 Well Fluid changed to Crude Oil
1991-12-13 Well Mode changed to Pumping
1991-12-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-12-17 Perforation Treatment Performed - Cement Squeeze
1991-12-17 Perforation Treatment Performed - Jet Perforation
1991-12-19 Well Log Performed
1992-04-08 Well Log Performed
1995-02-11 Well Log Performed
2000-11-28 Perforation Treatment Performed - Cement Squeeze
2000-11-28 Plug Back Performed
2000-11-28 Well Fluid changed to Crude Oil
2000-11-28 Well Mode changed to Abandoned Zone
2000-11-29 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1967-08-31 Perforation 1819.70 1820.00 3
1989-09-13 Cement Squeeze 1912.30 1937.00 0
1989-09-18 Acid Treatment 1905.00 1910.50 0
1991-12-08 Perforation 1898.50 1900.00 13
1991-12-08 Perforation 1863.50 1864.50 13
1991-12-09 Perforation 1893.00 1896.00 13
1991-12-09 Acid Treatment 1898.50 1900.00 0
1991-12-12 Acid Treatment 1893.00 1896.00 0
1991-12-13 Perforation 1858.50 1862.00 13
1991-12-17 Perforation 1819.70 1820.00 3
1991-12-17 Acid Treatment 1819.70 1820.00 0
1967-09-01 Acid Treatment 1819.70 1820.00 0
1991-12-17 Cement Squeeze 1819.70 1820.00 0
2000-11-28 Cement Squeeze 1893.00 1900.00 0
2000-11-28 Cement Squeeze 1858.50 1864.50 0
1967-09-01 Cement Squeeze 1819.70 1820.00 0
1967-09-04 Perforation 1912.30 1915.40 7
1967-09-05 Acid Treatment 1912.30 1915.40 0
1989-08-30 Perforation 1936.00 1937.00 13
1989-08-31 Acid Treatment 1912.30 1915.40 0
1989-09-01 Acid Treatment 1936.00 1937.00 0
1989-09-09 Perforation 1905.00 1910.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1967 0 0.0 0.0 0.0
1968 3325 0.0 0.0 0.0
1969 2717 0.0 0.0 0.0
1970 3781 0.0 0.0 0.0
1971 4269 0.0 0.0 0.0
1972 3772 0.0 0.0 0.0
1973 5986 0.0 0.0 0.0
1974 4362 0.0 0.0 0.0
1975 2720 0.0 0.0 0.0
1976 2680 0.0 0.0 0.0
1977 2590 0.0 0.0 0.0
1978 2124 0.0 0.0 0.0
1979 4741 0.0 0.0 0.0
1980 4155 0.0 0.0 0.0
1981 3575 0.0 0.0 0.0
1982 5082 0.0 0.0 0.0
1983 6143 0.0 0.0 0.0
1984 7139 0.0 0.0 0.0
1985 2449 0.0 0.0 0.0
1986 2314 0.0 0.0 0.0
1987 4440 0.0 0.0 0.0
1988 6734 0.0 0.0 0.0
1989 7059 0.0 0.0 0.0
1990 7517 0.0 0.0 0.0
1991 5618 0.0 0.0 0.0
1992 7919 0.0 0.0 0.0
1993 8569 0.0 0.0 0.0
1994 8078 0.0 0.0 0.0
1995 7272 0.0 0.0 0.0
1996 8598 0.0 0.0 0.0
1997 8302 0.0 0.0 0.0
1998 8303 0.0 0.0 0.0
1999 3994 0.0 0.0 0.0
2000 3445 0.0 0.0 0.0

For data sources see[5]

References