X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1076061816000

Well Details

Well ID: 1076061816000
Loading map...
Location: 00/16-18-107-06W6/0
Location Alias: 00/16-18-07-06 W6M
Location Alias 2: 00/16-18-107-06 W6/00
Country: Canada
Province: Alberta
Township: 107
Meridian: 6
Range: 06
Section: 18
County/Municipality: Mackenzie County
Well Name: IMPERIAL RAINBOW LAKE NO. 16-18-107-
Operator Name: Imperial Oil Limited
License Number: 0007660
License Date: 1954-02-08
License Status: RecExempt
Spud Date: 1954-02-21
Final Drill Date: 1954-06-12
Well Total Depth: 2244.90 m
Surface Hole Latitude: 58.296136
Surface Hole Longitude: -118.982790

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1954-02-08 Obtained License
1954-04-04 Drill Stem Test Performed
1954-05-02 Drill Stem Test Performed
1954-05-07 Drill Stem Test Performed
1954-05-15 Drill Stem Test Performed
1954-05-16 Drill Stem Test Performed
1954-05-17 Drill Stem Test Performed
1954-05-23 Drill Stem Test Performed
1954-06-12 Drill Stem Test Performed
1954-06-12 Finished Drilling
1954-06-14 Production Casing Operation Performed
1954-06-20 Perforation Treatment Performed - Bullet Perforation
1954-06-21 Perforation Treatment Performed - Acid Wash - No Pressure
1954-06-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1954-06-24 Perforation Treatment Performed - Bullet Perforation
1954-06-28 Perforation Treatment Performed - Bullet Perforation
1954-06-28 Perforation Treatment Performed - Cement Squeeze
1954-06-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1954-06-29 Perforation Treatment Performed - Cement Squeeze
1954-06-30 Perforation Treatment Performed - Bullet Perforation
1954-07-01 Perforation Treatment Performed - Acid Wash - No Pressure
1954-07-01 Perforation Treatment Performed - Bullet Perforation
1954-07-01 Perforation Treatment Performed - Cement Squeeze
1954-07-02 Perforation Treatment Performed - Cement Plug
1964-07-02 Well Abandoned
1964-07-02 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-06-20 Bullet Perforation 1908.00 1912.60 0
1954-06-29 Cement Squeeze 1789.50 1793.40 0
1954-06-30 Bullet Perforation 828.40 831.20 13
1954-07-01 Cement Squeeze 828.40 831.20 0
1954-07-01 Bullet Perforation 799.80 802.20 13
1954-07-01 Acid Wash 799.80 802.20 0
1954-07-02 Cement Plug 763.50 809.20 0
1954-06-20 Bullet Perforation 1914.10 1915.40 0
1954-06-21 Acid Wash 1908.00 1915.40 0
1954-06-23 Acid Treatment 1908.00 1915.40 0
1954-06-24 Bullet Perforation 1916.60 1922.10 13
1954-06-24 Bullet Perforation 1924.50 1938.50 13
1954-06-28 Cement Squeeze 1908.00 1938.50 0
1954-06-28 Bullet Perforation 1789.50 1793.40 13
1954-06-29 Acid Treatment 1789.50 1793.40 0

For data sources see[4]



References