X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1066062016000

Well Details

Well ID: 1066062016000
Loading map...
Location: 00/16-20-106-06W6/0
Location Alias: 00/16-20-06-06 W6M
Location Alias 2: 00/16-20-106-06 W6/00
Country: Canada
Province: Alberta
Township: 106
Meridian: 6
Range: 06
Section: 20
County/Municipality: Mackenzie County
Well Name: PENN WEST HARO 16-20-106-6
Operator Name: Obsidian Energy Ltd.
License Number: 0197084
License Date: 1997-01-22
License Status: Suspension
Spud Date: 1997-02-21
Final Drill Date: 1997-02-23
Well Total Depth: 619.00 m
Surface Hole Latitude: 58.221043
Surface Hole Longitude: -118.945164

For data sources see[1][2]

Well History

Date Event
1997-01-22 Obtained License
1997-02-22 Surface Casing Operation Performed
1997-02-23 Finished Drilling
1997-02-23 Well Mode changed to Drilled and Cased
1997-02-24 Production Casing Operation Performed
1997-02-24 Rig Released
1997-02-24 Well Log Performed
1997-02-26 Perforation Treatment Performed - Jet Perforation
1997-03-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-04-01 Well Began Production
1997-04-01 Well Fluid changed to Gas
1997-04-01 Well Mode changed to Flowing
1998-09-01 Well Fluid changed to Gas
1998-09-01 Well Mode changed to Suspended
1999-01-05 Well Fluid changed to Gas
1999-01-05 Well Mode changed to Flowing
2008-02-13 Well Log Performed
2017-08-01 Well Fluid changed to Gas
2017-08-01 Well Mode changed to Suspended
2020-02-21 Perforation Treatment Performed - Cement Plug
2020-02-21 Perforation Treatment Performed - Cement Squeeze
2020-02-25 Perforation Treatment Performed - Jet Perforation
2020-02-26 Perforation Treatment Performed - Cement Squeeze
2020-03-09 Perforation Treatment Performed - Jet Perforation
2020-03-10 Perforation Treatment Performed - Cement Plug
2020-03-10 Perforation Treatment Performed - Cement Squeeze
2020-03-11 Perforation Treatment Performed - Cement Plug
2020-03-13 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-02-26 Perforation 589.00 594.00 13
2020-03-11 Cement Plug 70.80 78.80 0
1997-03-10 Acid Treatment 589.00 594.00 0
2020-02-21 Cement Squeeze 589.00 594.00 0
2020-02-21 Cement Plug 577.00 585.00 0
2020-02-25 Perforation 85.00 87.00 17
2020-02-26 Cement Squeeze 85.00 87.00 0
2020-03-09 Perforation 104.00 106.00 17
2020-03-10 Cement Squeeze 104.00 106.00 0
2020-03-10 Cement Plug 93.80 101.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 4025 0.0 0.0 0.0
1998 2740 0.0 0.0 0.0
1999 2862 0.0 0.0 0.0
2000 7426 0.0 0.0 0.0
2001 6746 0.0 0.0 0.0
2002 7085 0.0 0.0 0.0
2003 6143 0.0 0.0 0.0
2004 5275 0.0 0.0 0.0
2005 1257 0.0 0.0 0.0
2006 5928 0.0 0.0 0.0
2007 3852 0.0 0.0 0.0
2008 6403 0.0 0.0 0.0
2009 8646 0.0 0.0 0.0
2010 8472 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8530 0.0 0.0 0.0
2013 8690 0.0 0.0 0.0
2014 8628 0.0 0.0 0.0
2015 3555 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-02-07 No Incident Encountered 0.00 0.00

For data sources see[6]

References