X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1056051106000

Well Details

Well ID: 1056051106000
Loading map...
Location: 00/06-11-105-05W6/0
Location Alias: 00/06-11-05-05 W6M
Location Alias 2: 00/06-11-105-05 W6/00
Country: Canada
Province: Alberta
Township: 105
Meridian: 6
Range: 05
Section: 11
County/Municipality: Mackenzie County
Well Name: PENN WEST HARO 6-11-105-5
Operator Name: Obsidian Energy Ltd.
License Number: 0278272
License Date: 2002-12-11
License Status: RecCertified
Spud Date: 2003-01-05
Final Drill Date: 2003-01-10
Well Total Depth: 498.00 m
Surface Hole Latitude: 58.098096
Surface Hole Longitude: -118.709297

For data sources see[1][2]

Well History

Date Event
2002-12-11 Obtained License
2003-01-05 Surface Casing Operation Performed
2003-01-10 Finished Drilling
2003-01-10 Well Mode changed to Drilled and Cased
2003-01-11 Production Casing Operation Performed
2003-01-11 Rig Released
2003-01-11 Well Log Performed
2003-01-29 Perforation Treatment Performed - Jet Perforation
2003-01-29 Well Log Performed
2003-01-31 Well Log Performed
2003-02-04 Perforation Treatment Performed - Fractured
2003-03-08 Well Log Performed
2004-01-19 Well Log Performed
2004-01-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-01-20 Perforation Treatment Performed - Jet Perforation
2004-01-20 Plug Back Performed
2004-01-20 Well Mode changed to Abandoned Zone
2004-01-21 Perforation Treatment Performed - Jet Perforation
2004-01-21 Well Log Performed
2004-01-22 Perforation Treatment Performed - Remedial Casing
2004-01-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-01-25 Perforation Treatment Performed - Jet Perforation
2004-01-25 Well Log Performed
2004-02-02 Perforation Treatment Performed - Remedial Casing
2004-02-24 Well Abandoned
2004-02-24 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-01-29 Perforation 464.00 466.00 20
2004-02-02 Remedial Casing Cementing 104.00 105.00 0
2003-02-04 Fracture 464.00 466.00 0
2004-01-20 Perforation 454.00 455.00 39
2004-01-20 Packing Device Capped w/Cement 433.00 456.00 0
2004-01-21 Perforation 311.00 312.00 39
2004-01-22 Remedial Casing Cementing 311.00 312.00 0
2004-01-24 Packing Device Capped w/Cement 299.00 307.00 0
2004-01-24 Packing Device Capped w/Cement 164.00 172.00 0
2004-01-25 Perforation 104.00 105.00 39

For data sources see[4]



References