X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1016052513000

Well Details

Well ID: 1016052513000
Loading map...
Location: 00/13-25-101-05W6/0
Location Alias: 00/13-25-01-05 W6M
Location Alias 2: 00/13-25-101-05 W6/00
Country: Canada
Province: Alberta
Township: 101
Meridian: 6
Range: 05
Section: 25
County/Municipality: County of Northern Lights
Well Name: SLE HARO 13-25-101-5
Operator Name: SanLing Energy Ltd.
License Number: 0405555
License Date: 2008-12-08
License Status: Suspension
Spud Date: 2009-01-11
Final Drill Date: 2009-01-21
Well Total Depth: 1302.00 m
Surface Hole Latitude: 57.795280
Surface Hole Longitude: -118.670867

For data sources see[1][2]

Well History

Date Event
2008-11-11 Well Log Performed
2008-12-08 Obtained License
2009-01-12 Surface Casing Operation Performed
2009-01-14 Direction Drilling Operation Performed - Horizontal
2009-01-15 Well Log Performed
2009-01-16 Well Log Performed
2009-01-17 Intermediate Casing Operation Performed
2009-01-21 Finished Drilling
2009-01-21 Well Log Performed
2009-01-21 Well Mode changed to Drilled and Cased
2009-01-23 Liner Casing Operation Performed
2009-01-23 Perforation Treatment Performed - Open-Hole Completion
2009-01-23 Perforation Treatment Performed - Slotted Liner or Casing
2009-01-23 Well Log Performed
2009-01-24 Rig Released
2009-01-24 Well Log Performed
2009-01-30 Perforation Treatment Performed - Fractured
2009-03-01 Well Began Production
2009-03-01 Well Fluid changed to Crude Oil
2009-03-01 Well Mode changed to Pumping
2010-02-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-11-01 Well Fluid changed to Crude Oil
2012-11-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-01-14 290.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-01-23 Slotted Liner 674.00 1200.00 0
2009-01-23 Open Hole/Barefoot Completion 1200.00 1302.00 0
2009-01-30 Fracture 743.10 1134.50 0
2010-02-27 Acid Treatment 743.00 1134.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 5511 0.0 0.0 0.0
2010 2583 0.0 0.0 0.0
2011 8555 0.0 0.0 0.0
2012 1622 0.0 0.0 0.0

For data sources see[6]

References