X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0986051607000

Well Details

Well ID: 0986051607000
Loading map...
Location: 00/07-16-098-05W6/0
Location Alias: 00/07-16-98-05 W6M
Location Alias 2: 00/07-16-098-05 W6/00
Country: Canada
Province: Alberta
Township: 098
Meridian: 6
Range: 05
Section: 16
County/Municipality: County of Northern Lights
Well Name: ACL BOTHA 7-16-98-5
Operator Name: Canadian Natural Resources Limited
License Number: 0053217
License Date: 1975-03-07
License Status: Abandoned
Spud Date: 1975-03-10
Final Drill Date: 1975-04-18
Well Total Depth: 2599.60 m
Surface Hole Latitude: 57.501709
Surface Hole Longitude: -118.740504

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-03-07 Obtained License
1975-03-10 Lost Circulation Occurred
1975-03-15 Drill Stem Test Performed
1975-03-17 Drill Stem Test Performed
1975-04-18 Finished Drilling
1975-04-19 Well Log Performed
1975-04-22 Production Casing Operation Performed
1976-01-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-01-20 Perforation Treatment Performed - Jet Perforation
1976-01-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-03-11 Well Mode changed to Drilled and Cased
1994-09-28 Well Began Production
1994-09-28 Well Fluid changed to Gas
1994-09-28 Well Mode changed to Flowing
2001-04-03 Well Log Performed
2001-04-05 Perforation Treatment Performed - Cement Squeeze
2001-04-08 Perforation Treatment Performed - Jet Perforation
2001-04-09 Perforation Treatment Performed - Jet Perforation
2007-12-20 Well Fluid changed to Gas
2007-12-20 Well Mode changed to Suspended
2011-03-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-03-05 Plug Back Performed
2011-03-05 Well Fluid changed to Gas
2011-03-05 Well Mode changed to Abandoned Zone
2011-03-06 Well Log Performed
2011-03-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-03-07 Perforation Treatment Performed - Jet Perforation
2011-03-07 Well Log Performed
2011-03-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-03-08 Perforation Treatment Performed - Remedial Casing
2011-03-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-03-09 Perforation Treatment Performed - Jet Perforation
2011-03-09 Well Log Performed
2011-03-10 Perforation Treatment Performed - Jet Perforation
2011-03-10 Well Log Performed
2011-03-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-03-12 Well Log Performed
2011-03-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-03-15 Perforation Treatment Performed - Remedial Casing
2011-03-16 Perforation Treatment Performed - Jet Perforation
2011-03-16 Well Log Performed
2011-03-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-03-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-03-18 Perforation Treatment Performed - Remedial Casing
2012-03-28 Well Abandoned
2012-03-28 Well Fluid changed to Gas
2012-03-28 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-01-20 Perforation 740.70 748.30 3
2011-03-08 Remedial Casing Cementing 582.00 583.00 0
2011-03-08 Packing Device Capped w/Cement 570.00 579.00 0
2011-03-09 Perforation 525.00 526.00 99
2011-03-09 Packing Device Capped w/Cement 514.00 522.00 0
2011-03-10 Perforation 491.00 492.00 99
2011-03-11 Acid Treatment 491.00 492.00 0
2011-03-15 Remedial Casing Cementing 491.00 492.00 0
2011-03-15 Packing Device Capped w/Cement 469.00 487.50 0
2011-03-16 Perforation 288.00 289.00 17
2011-03-17 Acid Treatment 288.00 289.00 0
1976-01-20 Acid Treatment 740.70 748.30 3
2011-03-18 Remedial Casing Cementing 288.00 289.00 0
2011-03-18 Packing Device Capped w/Cement 269.00 286.00 0
1976-01-21 Acid Treatment 740.70 748.30 0
2001-04-05 Cement Squeeze 740.70 748.30 0
2001-04-08 Perforation 732.70 733.70 4
2001-04-09 Perforation 732.70 733.70 4
2011-03-05 Packing Device Capped w/Cement 719.00 727.00 0
2011-03-07 Perforation 582.00 583.00 99
2011-03-07 Acid Treatment 582.00 583.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 2268 0.0 0.0 0.0
1995 8471 0.0 0.0 0.0
1996 8783 0.0 0.0 0.0
1997 8351 0.0 0.0 0.0
1998 4387 0.0 0.0 0.0
1999 1463 0.0 0.0 0.0
2004 744 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1975-03-10 Lost Circulation 195.00 195.00

For data sources see[6]

References