X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0985163308000

Well Details

Well ID: 0985163308000
Loading map...
Location: 00/08-33-098-16W5/0
Location Alias: 00/08-33-98-16 W5M
Location Alias 2: 00/08-33-098-16 W5/00
Country: Canada
Province: Alberta
Township: 098
Meridian: 5
Range: 16
Section: 33
County/Municipality: Mackenzie County
Well Name: NORTHSTAR WOLVERINE 8-33-98-16
Operator Name: Prairie Provident Resources Canada Ltd.
License Number: 0174179
License Date: 1994-12-15
License Status: Abandoned
Spud Date: 1995-01-21
Final Drill Date: 1995-01-22
Well Total Depth: 372.20 m
Surface Hole Latitude: 57.546015
Surface Hole Longitude: -116.526157

For data sources see[1][2]

Well History

Date Event
1994-12-15 Obtained License
1995-01-22 Finished Drilling
1995-01-22 Production Casing Operation Performed
1995-01-22 Well Mode changed to Drilled and Cased
1995-01-23 Rig Released
1995-01-30 Perforation Treatment Performed - Open-Hole Completion
1995-02-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-02-15 Well Log Performed
1995-03-19 Well Began Production
1995-03-19 Well Fluid changed to Gas
1995-03-19 Well Mode changed to Flowing
2001-10-31 Well Fluid changed to Gas
2001-10-31 Well Mode changed to Suspended
2002-01-24 Well Log Performed
2002-01-25 Perforation Treatment Performed - Jet Perforation
2002-01-25 Well Log Performed
2002-01-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-01-26 Well Log Performed
2002-02-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-02-22 Plug Back Performed
2002-02-22 Well Fluid changed to Gas
2002-02-22 Well Log Performed
2002-02-22 Well Mode changed to Abandoned Zone
2003-02-09 Well Abandoned
2003-02-09 Well Fluid changed to Gas
2003-02-09 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-01-30 Open Hole/Barefoot Completion 365.00 372.20 0
1995-02-12 Acid Treatment 365.00 372.20 0
2002-01-25 Perforation 328.00 329.00 14
2002-01-26 Packing Device Capped w/Cement 355.00 363.00 0
2002-02-22 Packing Device Capped w/Cement 312.00 320.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 6445 0.0 0.0 0.0
1996 8726 0.0 0.0 0.0
1997 8251 0.0 0.0 0.0
1998 8313 0.0 0.0 0.0
1999 8281 0.0 0.0 0.0
2000 2903 0.0 0.0 0.0

For data sources see[5]

References