X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0976091511000

Well Details

Well ID: 0976091511000
Loading map...
Location: 00/11-15-097-09W6/0
Location Alias: 00/11-15-97-09 W6M
Location Alias 2: 00/11-15-097-09 W6/00
Country: Canada
Province: Alberta
Township: 097
Meridian: 6
Range: 09
Section: 15
County/Municipality: County of Northern Lights
Well Name: CNRL CHNCHAGA 11-15-97-9
Operator Name: Canadian Natural Resources Limited
License Number: 0302135
License Date: 2004-01-20
License Status: Suspension
Spud Date: 2004-02-27
Final Drill Date: 2004-03-11
Well Total Depth: 2513.00 m
Surface Hole Latitude: 57.420673
Surface Hole Longitude: -119.374243

For data sources see[1][2]

Well History

Date Event
2004-01-20 Obtained License
2004-02-28 Surface Casing Operation Performed
2004-03-02 Production Casing Operation Performed
2004-03-11 Finished Drilling
2004-03-11 Well Log Performed
2004-03-11 Well Mode changed to Drilled and Cased
2004-03-16 Rig Released
2004-03-20 Perforation Treatment Performed - Jet Perforation
2004-03-20 Well Log Performed
2004-03-21 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-04-01 Well Began Production
2004-04-01 Well Fluid changed to Crude Oil
2004-04-01 Well Mode changed to Pumping
2009-02-04 Well Log Performed
2009-02-06 Perforation Treatment Performed - Cement Squeeze
2009-02-06 Plug Back Performed
2009-02-06 Well Fluid changed to Crude Oil
2009-02-06 Well Mode changed to Abandoned Zone
2009-02-07 Perforation Treatment Performed - Jet Perforation
2009-02-07 Perforation Treatment Performed - Remedial Casing
2009-02-07 Well Log Performed
2009-02-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-02-08 Perforation Treatment Performed - Jet Perforation
2009-02-08 Well Log Performed
2009-02-09 Perforation Treatment Performed - Remedial Casing
2009-02-10 Perforation Treatment Performed - Jet Perforation
2009-02-10 Perforation Treatment Performed - Remedial Casing
2009-02-10 Well Log Performed
2009-02-11 Perforation Treatment Performed - Jet Perforation
2009-02-11 Well Log Performed
2009-02-12 Perforation Treatment Performed - Remedial Casing
2009-02-21 Perforation Treatment Performed - Jet Perforation
2009-02-21 Well Log Performed
2009-02-22 Perforation Treatment Performed - Jet Perforation
2009-02-22 Perforation Treatment Performed - Remedial Casing
2009-02-22 Well Log Performed
2009-02-23 Perforation Treatment Performed - Remedial Casing
2010-01-12 Well Log Performed
2010-01-13 Perforation Treatment Performed - Jet Perforation
2010-01-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-01-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-01-14 Perforation Treatment Performed - Remedial Casing
2010-01-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-01-22 Perforation Treatment Performed - Jet Perforation
2010-01-22 Perforation Treatment Performed - Remedial Casing
2010-01-22 Well Log Performed
2011-01-18 Well Log Performed
2011-01-20 Perforation Treatment Performed - Jet Perforation
2011-01-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-01-28 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-03-20 Perforation 2376.00 2388.00 20
2009-02-10 Remedial Casing Cementing 1465.00 1466.00 0
2009-02-11 Perforation 1285.00 1286.00 20
2009-02-12 Remedial Casing Cementing 1285.00 1286.00 0
2009-02-21 Perforation 1257.00 1258.00 20
2009-02-22 Remedial Casing Cementing 1257.00 1258.00 0
2009-02-22 Perforation 906.50 907.00 20
2009-02-23 Remedial Casing Cementing 906.50 907.00 0
2010-01-13 Perforation 893.50 896.50 20
2010-01-14 Acid Treatment 893.50 896.50 0
2010-01-14 Remedial Casing Cementing 893.50 896.50 0
2004-03-21 Acid Treatment 2376.00 2388.00 0
2010-01-14 Packing Device Capped w/Cement 878.30 886.00 0
2010-01-22 Perforation 870.00 872.00 17
2010-01-22 Acid Treatment 870.00 872.00 0
2010-01-22 Remedial Casing Cementing 870.00 872.00 0
2011-01-20 Perforation 617.00 618.00 20
2011-01-20 Perforation 615.00 616.00 20
2011-01-28 Remedial Casing Cementing 615.00 618.00 0
2011-01-28 Packing Device Capped w/Cement 599.50 610.00 0
2009-02-06 Cement Squeeze 2376.00 2388.00 0
2009-02-07 Perforation 1830.00 1831.00 20
2009-02-07 Remedial Casing Cementing 1830.00 1831.00 0
2009-02-08 Perforation 1710.00 1711.00 20
2009-02-08 Acid Treatment 1710.00 1711.00 0
2009-02-09 Remedial Casing Cementing 1710.00 1711.00 0
2009-02-10 Perforation 1465.00 1466.00 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 4957 0.0 0.0 0.0

For data sources see[5]

References