X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0965062212000

Well Details

Well ID: 0965062212000
Loading map...
Location: 00/12-22-096-06W5/0
Location Alias: 00/12-22-96-06 W5M
Location Alias 2: 00/12-22-096-06 W5/00
Country: Canada
Province: Alberta
Township: 096
Meridian: 5
Range: 06
Section: 22
County/Municipality: Municipal District of Opportunity No. 17
Well Name: PRED PANNY 12-22-96-6
Operator Name: Highwood Oil Company Ltd.
License Number: 0150787
License Date: 1991-11-27
License Status: Abandoned
Spud Date: 1991-12-09
Final Drill Date: 1991-12-15
Well Total Depth: 1197.00 m
Surface Hole Latitude: 57.346816
Surface Hole Longitude: -114.889098

For data sources see[1][2]

Well History

Date Event
1991-11-27 Obtained License
1991-12-10 Surface Casing Operation Performed
1991-12-13 Direction Drilling Operation Performed - Deviate
1991-12-14 Production Casing Operation Performed
1991-12-15 Finished Drilling
1991-12-15 Perforation Treatment Performed - Open-Hole Completion
1991-12-15 Well Log Performed
1991-12-15 Well Mode changed to Drilled and Cased
1991-12-16 Rig Released
1991-12-16 Well Log Performed
1992-01-30 Well Began Production
1992-01-30 Well Fluid changed to Crude Oil
1992-01-30 Well Mode changed to Pumping
1995-10-31 Well Fluid changed to Crude Oil
1995-10-31 Well Mode changed to Suspended
2003-03-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-03-21 Plug Back Performed
2003-03-21 Well Fluid changed to Crude Oil
2003-03-21 Well Log Performed
2003-03-21 Well Mode changed to Abandoned Zone
2003-03-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-03-23 Plug Back Performed
2003-03-23 Well Abandoned
2003-03-23 Well Fluid changed to Crude Oil
2003-03-23 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1991-12-13 1005.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1991-12-15 Open Hole/Barefoot Completion 1171.80 1197.00 0
2003-03-21 Packing Device Capped w/Cement 1156.00 1164.00 0
2003-03-23 Packing Device Capped w/Cement 607.00 615.00 0
2003-03-23 Packing Device Capped w/Cement 355.00 363.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 7468 0.0 0.0 0.0
1993 7559 0.0 0.0 0.0
1994 3455 0.0 0.0 0.0
1995 2220 0.0 0.0 0.0

For data sources see[6]

References