X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0955051309002

Well Details

Well ID: 0955051309002
Loading map...
Location: 00/09-13-095-05W5/2
Location Alias: 00/09-13-95-05 W5M
Location Alias 2: 00/09-13-095-05 W5/02
Country: Canada
Province: Alberta
Township: 095
Meridian: 5
Range: 05
Section: 13
County/Municipality: Municipal District of Opportunity No. 17
Well Name: PRED PANNY 9-13-95-5
Operator Name: Highwood Oil Company Ltd.
License Number: 0156874
License Date: 1993-03-01
License Status: Suspension
Spud Date: 1993-03-05
Final Drill Date: 2002-03-20
Well Total Depth: 1210.00 m
Surface Hole Latitude: 57.244300
Surface Hole Longitude: -114.654201

For data sources see[1][2]

Well History

Date Event
1993-03-01 Obtained License
1993-03-06 Surface Casing Operation Performed
1993-03-10 Production Casing Operation Performed
1993-03-11 Perforation Treatment Performed - Open-Hole Completion
1993-03-11 Rig Released
1993-03-11 Well Log Performed
1993-03-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-03-09 Perforation Treatment Performed - Chemical Squeeze
2002-03-20 Finished Drilling
2002-03-20 Well Mode changed to Drilled and Cased
2002-03-21 Well Log Performed
2002-03-22 Well Log Performed
2002-03-24 Perforation Treatment Performed - Jet Perforation
2002-03-24 Well Log Performed
2002-03-25 Perforation Treatment Performed - Cement Squeeze
2002-04-03 Perforation Treatment Performed - Open-Hole Completion
2002-04-04 Perforation Treatment Performed - Jet Perforation
2002-04-04 Well Log Performed
2002-04-05 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-03-11 Open Hole/Barefoot Completion 1176.00 1190.00 0
1993-03-13 Acid Treatment 1176.00 1190.00 0
1998-03-09 Chemical Squeeze 1176.00 1190.00 0
2002-03-24 Perforation 1132.00 1133.00 13
2002-03-24 Perforation 1152.00 1153.00 13
2002-03-25 Cement Squeeze 1132.00 1133.00 0
2002-03-25 Cement Squeeze 1152.00 1153.00 0
2002-04-03 Open Hole/Barefoot Completion 1176.00 1210.00 0
2002-04-04 Perforation 378.00 382.00 13

For data sources see[4]



References