X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0955043111002

Well Details

Well ID: 0955043111002
Loading map...
Location: 00/11-31-095-04W5/2
Location Alias: 00/11-31-95-04 W5M
Location Alias 2: 00/11-31-095-04 W5/02
Country: Canada
Province: Alberta
Township: 095
Meridian: 5
Range: 04
Section: 31
County/Municipality: Municipal District of Opportunity No. 17
Well Name: PRED PANNY 11-31-95-4
Operator Name: Highwood Oil Company Ltd.
License Number: 0151875
License Date: 1992-02-28
License Status: Suspension
Spud Date: 1992-12-16
Final Drill Date: 1992-12-28
Well Total Depth: 1294.80 m
Surface Hole Latitude: 57.289113
Surface Hole Longitude: -114.643220

For data sources see[1][2]

Well History

Date Event
1992-02-28 Obtained License
1992-12-17 Surface Casing Operation Performed
1992-12-21 Direction Drilling Operation Performed - Horizontal
1992-12-22 Production Casing Operation Performed
1992-12-25 Drill Stem Test Performed
1992-12-28 Finished Drilling
1992-12-28 Perforation Treatment Performed - Open-Hole Completion
1992-12-28 Well Mode changed to Drilled and Cased
1992-12-29 Rig Released
1992-12-29 Well Log Performed
1993-01-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-02-23 Well Log Performed
1993-02-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-03-14 Well Log Performed
2002-03-15 Well Log Performed
2002-03-16 Perforation Treatment Performed - Jet Perforation
2008-03-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-03-15 Plug Back Performed
2008-03-15 Well Log Performed
2008-03-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1992-12-21 934.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-12-28 Open Hole/Barefoot Completion 1164.00 1294.80 0
1993-01-04 Acid Treatment 1164.00 1294.80 0
1993-02-27 Acid Treatment 1164.00 1294.80 0
1993-02-27 Acid Treatment 1164.00 1294.80 0
2002-03-16 Perforation 385.00 389.00 13
2008-03-15 Packing Device Capped w/Cement 1148.00 1156.00 0
2008-03-16 Packing Device Capped w/Cement 571.50 579.50 0

For data sources see[5]



References