X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0946011207000

Well Details

Well ID: 0946011207000
Loading map...
Location: 00/07-12-094-01W6/0
Location Alias: 00/07-12-94-01 W6M
Location Alias 2: 00/07-12-094-01 W6/00
Country: Canada
Province: Alberta
Township: 094
Meridian: 6
Range: 01
Section: 12
County/Municipality: County of Northern Lights
Well Name: MESA HOTCHKISS 7-12-94-1
Operator Name: BP Canada Energy Group ULC
License Number: 0057183
License Date: 1976-02-20
License Status: RecCertified
Spud Date: 1976-02-20
Final Drill Date: 1976-02-23
Well Total Depth: 693.40 m
Surface Hole Latitude: 57.138207
Surface Hole Longitude: -118.009060

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-02-20 Obtained License
1976-02-23 Finished Drilling
1976-02-24 Drill Stem Test Performed
1976-02-25 Production Casing Operation Performed
1976-02-25 Well Mode changed to Drilled and Cased
1976-03-06 Perforation Treatment Performed - Jet Perforation
1976-03-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-03-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-03-09 Perforation Treatment Performed - Jet Perforation
1977-11-27 Perforation Treatment Performed - Jet Perforation
1977-11-28 Perforation Treatment Performed - Fractured
1989-03-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-03-11 Plug Back Performed
1989-03-11 Well Abandoned
1989-03-11 Well Log Performed
1989-03-11 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-03-06 Perforation 661.70 662.60 7
1989-03-11 Packing Device Capped w/Cement 631.50 640.00 0
1976-03-06 Perforation 663.50 664.20 7
1976-03-06 Perforation 665.40 666.60 7
1976-03-07 Acid Treatment 661.70 666.60 0
1976-03-09 Perforation 651.70 653.20 7
1976-03-09 Perforation 655.60 657.10 7
1976-03-09 Acid Treatment 651.70 657.10 0
1977-11-27 Perforation 647.40 647.70 7
1977-11-28 Fracture 647.40 647.70 0

For data sources see[4]



References