If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0945062203000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":57.165051,"lon":-114.87499,"icon":""}]} |
Location: 00/03-22-094-06W5/0 | |
Location Alias: 00/03-22-94-06 W5M | |
Location Alias 2: 00/03-22-094-06 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 094 | |
Meridian: 5 | |
Range: 06 | |
Section: 22 | |
County/Municipality: Municipal District of Opportunity No. 17 | |
Well Name: SWORD PANNY 3-22-94-6 | |
Operator Name: Crimson Oil & Gas Ltd. | |
License Number: 0121322 | |
License Date: 1986-01-13 | |
License Status: Abandoned | |
Spud Date: 1986-01-25 | |
Final Drill Date: 1986-02-18 | |
Well Total Depth: 1361.00 m | |
Surface Hole Latitude: 57.165051 | |
Surface Hole Longitude: -114.874990 |
Date | Event |
---|---|
1986-01-13 | Obtained License |
1986-01-25 | Lost Circulation Occurred |
1986-01-26 | Surface Casing Operation Performed |
1986-01-28 | Lost Circulation Occurred |
1986-01-29 | Intermediate Casing Operation Performed |
1986-02-01 | Plug Back Performed |
1986-02-03 | Plug Back Performed |
1986-02-07 | Direction Drilling Operation Performed - Straighten Hole |
1986-02-18 | Finished Drilling |
1986-02-18 | Well Mode changed to Drilled and Cased |
1986-02-19 | Well Log Performed |
1986-02-20 | Well Log Performed |
1986-02-21 | Drill Stem Test Performed |
1986-02-21 | Well Log Performed |
1986-02-23 | Drill Stem Test Performed |
1986-02-24 | Liner Casing Operation Performed |
1986-02-25 | Rig Released |
1986-03-07 | Well Log Performed |
1986-03-08 | Well Log Performed |
1986-03-09 | Perforation Treatment Performed - Jet Perforation |
1986-03-09 | Well Began Production |
1986-03-09 | Well Fluid changed to Crude Oil |
1986-03-09 | Well Mode changed to Flowing |
1986-03-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-03-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-03-15 | Well Fluid changed to Crude Oil |
1986-03-15 | Well Mode changed to Suspended |
1987-01-06 | Well Fluid changed to Crude Oil |
1987-01-06 | Well Mode changed to Pumping |
1987-03-31 | Well Fluid changed to Crude Oil |
1987-03-31 | Well Mode changed to Suspended |
1993-01-13 | Well Fluid changed to Crude Oil |
1993-01-13 | Well Mode changed to Pumping |
1996-12-30 | Well Fluid changed to Crude Oil |
1996-12-30 | Well Mode changed to Suspended |
2007-02-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2007-02-20 | Plug Back Performed |
2007-02-20 | Well Fluid changed to Crude Oil |
2007-02-20 | Well Log Performed |
2007-02-20 | Well Mode changed to Abandoned Zone |
2007-02-21 | Perforation Treatment Performed - Jet Perforation |
2007-02-21 | Well Log Performed |
2007-02-22 | Perforation Treatment Performed - Cement Squeeze |
2007-02-23 | Perforation Treatment Performed - Jet Perforation |
2007-02-24 | Perforation Treatment Performed - Cement Plug |
2007-02-27 | Perforation Treatment Performed - Cement Squeeze |
2007-02-28 | Well Log Performed |
2007-03-01 | Perforation Treatment Performed - Jet Perforation |
2007-03-01 | Well Log Performed |
2007-03-05 | Perforation Treatment Performed - Cement Squeeze |
2007-03-06 | Perforation Treatment Performed - Jet Perforation |
2007-03-07 | Perforation Treatment Performed - Cement Plug |
2007-03-08 | Perforation Treatment Performed - Cement Plug |
2007-03-09 | Perforation Treatment Performed - Cement Plug |
2007-03-09 | Perforation Treatment Performed - Cement Squeeze |
2007-03-09 | Perforation Treatment Performed - Jet Perforation |
2007-03-10 | Perforation Treatment Performed - Jet Perforation |
2007-03-11 | Perforation Treatment Performed - Cement Plug |
2007-03-11 | Perforation Treatment Performed - Cement Squeeze |
2007-03-14 | Well Abandoned |
2007-03-14 | Well Fluid changed to Crude Oil |
2007-03-14 | Well Mode changed to Abandoned |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1986-02-07 | 772.00 | Straighten Hole |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1986-03-09 | Perforation | 1267.50 | 1272.00 | 13 |
2007-02-27 | Cement Squeeze | 386.00 | 387.00 | 0 |
2007-03-01 | Perforation | 378.50 | 379.50 | 17 |
2007-03-05 | Cement Squeeze | 378.50 | 379.50 | 0 |
2007-03-06 | Perforation | 305.00 | 306.00 | 17 |
2007-03-06 | Perforation | 284.00 | 285.00 | 17 |
2007-03-07 | Cement Plug | 306.00 | 377.00 | 0 |
2007-03-08 | Cement Plug | 273.00 | 306.00 | 0 |
2007-03-09 | Perforation | 272.30 | 273.30 | 17 |
2007-03-09 | Perforation | 240.00 | 241.00 | 17 |
2007-03-09 | Cement Plug | 241.00 | 273.00 | 0 |
1986-03-10 | Acid Treatment | 1267.50 | 1272.00 | 0 |
2007-03-09 | Perforation | 215.00 | 216.00 | 17 |
2007-03-09 | Cement Squeeze | 240.00 | 241.00 | 0 |
2007-03-09 | Cement Plug | 216.00 | 239.00 | 0 |
2007-03-10 | Perforation | 185.00 | 186.00 | 17 |
2007-03-11 | Cement Squeeze | 215.00 | 216.00 | 0 |
2007-03-11 | Cement Plug | 186.00 | 213.50 | 0 |
2007-03-11 | Cement Squeeze | 185.00 | 186.00 | 0 |
1986-03-12 | Acid Treatment | 1267.50 | 1272.00 | 0 |
2007-02-20 | Packing Device Capped w/Cement | 1257.00 | 1265.00 | 0 |
2007-02-20 | Packing Device Capped w/Cement | 658.00 | 690.00 | 0 |
2007-02-21 | Perforation | 421.00 | 422.00 | 17 |
2007-02-22 | Cement Squeeze | 421.00 | 422.00 | 0 |
2007-02-23 | Perforation | 386.00 | 387.00 | 17 |
2007-02-24 | Cement Plug | 387.00 | 420.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1986 | 20 | 0.0 | 0.0 | 0.0 |
1987 | 1794 | 0.0 | 0.0 | 0.0 |
1993 | 1323 | 0.0 | 0.0 | 0.0 |
1994 | 3546 | 0.0 | 0.0 | 0.0 |
1995 | 2823 | 0.0 | 0.0 | 0.0 |
1996 | 84 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1986-01-25 | Lost Circulation | 68.00 | 68.00 |
1986-01-28 | Lost Circulation | 409.00 | 409.00 |
For data sources see[7]