X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0945042202020

Well Details

Well ID: 0945042202020
Loading map...
Location: 02/02-22-094-04W5/0
Location Alias: 02/02-22-94-04 W5M
Location Alias 2: 02/02-22-094-04 W5/00
Country: Canada
Province: Alberta
Township: 094
Meridian: 5
Range: 04
Section: 22
County/Municipality: Municipal District of Opportunity No. 17
Well Name: PRED SENEX 2-22-94-4
Operator Name: Highwood Oil Company Ltd.
License Number: 0156750
License Date: 1993-02-24
License Status: Abandoned
Spud Date: 1993-02-18
Final Drill Date: 1993-03-02
Well Total Depth: 1334.00 m
Surface Hole Latitude: 57.166093
Surface Hole Longitude: -114.552045

For data sources see[1][2]

Well History

Date Event
1993-02-21 Surface Casing Operation Performed
1993-02-22 Lost Circulation Occurred
1993-02-24 Direction Drilling Operation Performed - Horizontal
1993-02-24 Obtained License
1993-02-26 Production Casing Operation Performed
1993-03-02 Finished Drilling
1993-03-02 Perforation Treatment Performed - Open-Hole Completion
1993-03-02 Well Log Performed
1993-03-02 Well Mode changed to Drilled and Cased
1993-03-03 Rig Released
1993-03-06 Perforation Treatment Performed - Fractured
1993-03-09 Well Began Production
1993-03-09 Well Fluid changed to Crude Oil
1993-03-09 Well Mode changed to Pumping
1993-03-17 Well Log Performed
1996-12-06 Well Log Performed
1999-12-01 Well Fluid changed to Crude Oil
1999-12-01 Well Mode changed to Suspended
2002-01-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-01-27 Plug Back Performed
2002-01-27 Well Fluid changed to Crude Oil
2002-01-27 Well Mode changed to Abandoned Zone
2002-01-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-01-28 Plug Back Performed
2002-02-02 Well Abandoned
2002-02-02 Well Fluid changed to Crude Oil
2002-02-02 Well Mode changed to Abandoned
2009-02-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-02-10 Plug Back Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1993-02-24 1072.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-03-02 Open Hole/Barefoot Completion 1241.90 1334.00 0
1993-03-06 Fracture 1241.90 1334.00 0
2002-01-27 Packing Device Capped w/Cement 1224.20 1232.20 0
2002-01-28 Packing Device Capped w/Cement 1082.70 1090.70 0
2002-01-28 Packing Device Capped w/Cement 390.00 398.00 0
2009-02-10 Packing Device Capped w/Cement 369.00 384.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 6106 0.0 0.0 0.0
1994 8106 0.0 0.0 0.0
1995 8227 0.0 0.0 0.0
1996 3264 0.0 0.0 0.0
1997 3939 0.0 0.0 0.0
1998 8329 0.0 0.0 0.0
1999 7445 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1993-02-22 Lost Circulation 442.00 442.00

For data sources see[7]

References