X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0945031809002

Well Details

Well ID: 0945031809002
Loading map...
Location: 00/09-18-094-03W5/2
Location Alias: 00/09-18-94-03 W5M
Location Alias 2: 00/09-18-094-03 W5/02
Country: Canada
Province: Alberta
Township: 094
Meridian: 5
Range: 03
Section: 18
County/Municipality: Municipal District of Opportunity No. 17
Well Name: PRED SENEX 9-18-94-3
Operator Name: Highwood Oil Company Ltd.
License Number: 0164684
License Date: 1994-02-02
License Status: Suspension
Spud Date: 1994-02-02
Final Drill Date: 1994-03-02
Well Total Depth: 1427.00 m
Surface Hole Latitude: 57.159369
Surface Hole Longitude: -114.461692

For data sources see[1][2]

Well History

Date Event
1994-02-02 Obtained License
1994-02-06 Surface Casing Operation Performed
1994-02-10 Intermediate Casing Operation Performed
1994-02-12 Direction Drilling Operation Performed - Deviate
1994-02-21 Liner Casing Operation Performed
1994-02-25 Direction Drilling Operation Performed - Horizontal
1994-03-02 Finished Drilling
1994-03-02 Perforation Treatment Performed - Open-Hole Completion
1994-03-02 Well Mode changed to Drilled and Cased
1994-03-04 Rig Released
1994-03-07 Well Log Performed
1994-03-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-03-28 Perforation Treatment Performed - Jet Perforation
1994-03-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-04-01 Well Began Production
1994-04-01 Well Fluid changed to Crude Oil
1994-04-01 Well Mode changed to Pumping
1994-10-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-10-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-02-21 Perforation Treatment Performed - Cement Plug
1995-02-21 Plug Back Performed
1995-02-21 Well Fluid changed to Crude Oil
1995-02-21 Well Mode changed to Abandoned and Whipstocked

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1994-02-12 1055.00 Deviate (5 - 79 degrees)
1994-02-25 1275.50 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-03-02 Open Hole/Barefoot Completion 1273.90 1427.00 0
1994-03-20 Acid Treatment 1273.90 1427.00 0
1994-03-28 Perforation 1298.00 1313.00 14
1994-03-28 Perforation 1335.00 1355.00 14
1994-03-29 Acid Treatment 1273.90 1427.00 0
1994-10-23 Acid Treatment 1273.90 1427.00 0
1994-10-25 Acid Treatment 1273.90 1427.00 0
1995-02-21 Cement Plug 1275.30 1305.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 5173 0.0 0.0 0.0
1995 888 0.0 0.0 0.0

For data sources see[6]

References