0935051915000

Well Details

Well ID: 0935051915000
Loading map...
Location: 00/15-19-093-05W5/0
Location Alias: 00/15-19-93-05 W5M
Location Alias 2: 00/15-19-093-05 W5/00
Country: Canada
Province: Alberta
Township: 093
Meridian: 5
Range: 05
Section: 19
County/Municipality: Municipal District of Opportunity No. 17
Well Name: PRED SENEX 15-19-93-5
Operator Name: Highwood Oil Company Ltd.
License Number: 0123081
License Date: 1986-04-10
License Status: Issued
Spud Date: 1986-04-12
Final Drill Date: 1986-04-22
Well Total Depth: 1348.30 m
Surface Hole Latitude: 57.087596
Surface Hole Longitude: -114.787044

For data sources see[1][2]

Well History

Date Event
1986-04-10 Obtained License
1986-04-14 Surface Casing Operation Performed
1986-04-17 Intermediate Casing Operation Performed
1986-04-22 Finished Drilling
1986-04-22 Well Mode changed to Drilled and Cased
1986-04-23 Drill Stem Test Performed
1986-04-23 Well Log Performed
1986-04-24 Drill Stem Test Performed
1986-04-25 Liner Casing Operation Performed
1986-04-25 Rig Released
1986-09-11 Well Log Performed
1986-09-12 Perforation Treatment Performed - Jet Perforation
1986-09-13 Well Began Production
1986-09-13 Well Fluid changed to Crude Oil
1986-09-13 Well Mode changed to Flowing
1986-09-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-09-16 Well Log Performed
1986-09-17 Perforation Treatment Performed - Jet Perforation
1986-09-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-10-15 Well Log Performed
1988-10-18 Well Fluid changed to Crude Oil
1988-10-18 Well Mode changed to Pumping
1992-12-04 Perforation Treatment Performed - Cement Squeeze
1992-12-06 Perforation Treatment Performed - Jet Perforation
1992-12-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-12-07 Well Log Performed
1992-12-08 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-09-12 Perforation 1286.50 1288.00 13
1992-12-08 Acid Treatment 1276.00 1284.50 0
1986-09-14 Acid Treatment 1286.50 1288.00 0
1986-09-17 Perforation 1281.50 1284.50 13
1986-09-19 Acid Treatment 1286.50 1288.00 0
1992-12-04 Cement Squeeze 1281.50 1288.00 0
1992-12-06 Perforation 1276.00 1277.00 13
1992-12-06 Perforation 1278.50 1280.50 13
1992-12-06 Perforation 1281.50 1284.50 13
1992-12-07 Acid Treatment 1276.00 1284.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 1496 0.0 0.0 0.0
1987 4666 0.0 0.0 0.0
1988 6956 0.0 0.0 0.0
1989 6912 0.0 0.0 0.0
1990 7008 0.0 0.0 0.0
1991 7514 0.0 0.0 0.0
1992 8009 0.0 0.0 0.0
1993 7877 0.0 0.0 0.0
1994 8349 0.0 0.0 0.0
1995 8533 0.0 0.0 0.0
1996 8586 0.0 0.0 0.0
1997 8515 0.0 0.0 0.0
1998 8554 0.0 0.0 0.0
1999 8569 0.0 0.0 0.0
2000 8744 0.0 0.0 0.0
2001 8494 0.0 0.0 0.0
2002 8556 0.0 0.0 0.0
2003 8672 0.0 0.0 0.0
2004 8498 0.0 0.0 0.0
2005 8205 0.0 0.0 0.0
2006 8755 0.0 0.0 0.0
2007 8456 0.0 0.0 0.0
2008 8652 0.0 0.0 0.0
2009 8443 0.0 0.0 0.0
2010 8613 0.0 0.0 0.0
2011 8334 0.0 0.0 0.0
2012 8590 0.0 0.0 0.0
2013 8464 0.0 0.0 0.0
2014 8720 0.0 0.0 0.0
2015 7050 0.0 0.0 0.0
2016 8727 0.0 0.0 0.0
2017 8679 0.0 0.0 0.0
2018 8670 0.0 0.0 0.0
2019 8745 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]